Abstract
The concept of energy security has emerged as a consequence of rising energy demand in developing countries. This has demanded the use of renewable resources' untapped potential. PV systems connected to the grid have emerged as the finest large-scale renewable energy sources. Performance assessments of these grid connected plants could help in designing, operating and maintenance of new grid connected systems. A 676.8 kWp photovoltaic grid connected power plant commissioned at SNR Membership Shopping, San Fernando is one of the few commercial establishments that installed a grid tied solar PV system in Pampanga. The site is receiving a good average solar radiation of 5.50 kWh/m2/day and the five months process average temperature of about 27.16 degrees centigrade. The plant is designed to operate with a fixed angle of 30?. In this study the solar PV plant design aspects along with its annual performance is elaborated. The various types of power losses (temperature, internal network, power electronics, grid connected etc.) and performance ratio are also calculated. The performance results of the plant are also compared with the simulation values obtained from PV Syst software and the PV Gis Site Simulator. The final yield (YF) of plant ranged from 3.23 to 5.15 kWh/m2/day, and annual performance ratio (PR) of 82.5% using the PV Syst simulator. Then, it has 17.85% Capacity Utilization Factor (CUF) with the five month period process energy generation of 396.16 MWh.
References
[1] Malene, E.L., Jan, S.N., Otavio, C., Martin, D., Xiangping, H., Francesco, C., 2021. Optimal combination of bioenergy and solar photovoltaic for renewable energy production on abandoned cropland. Renew. Energy 168, 45–56. https://doi.org/ 10.1016/j.renene.2020.11.159.
[2] (PDF) Evaluation of solar panel for improved performances. (n.d.). Retrieved from https://www.researchgate.net/publication/352693892_Evaluation_of_solar_panel_for_improved_performances
[3] (PDF) Measuring the commercial solar panel performance. (n.d.). Retrieved from https://www.researchgate.net/publication/327988772_Measuring_the_commercial_solar_panel_performance
[4] Adeh., H., E., Good., P., S., Calaf., M., ... W., C. (2019). Solar pv power potential is greatest over croplands - scientific reports. Scientific Reports, 9(1), 1-6. doi:10.1038/s41598-019-47803-3
[5] Thakur Pranav Kumar Gautam, & Kumar Niranjan. (n.d.). Retrieved from https://www.ijmpe.in/wp-content/uploads/2016/09/NCESG019.pdf.
[6] Performance simulation of grid-connected rooftop solar PV system for small households: A case study of Ujjain, India. (2018). Energy Reports, 4,, 546-553. doi: 10.1016/j.egyr.2018.08.002
[7] Sharma, S. K., Palwalia., K., D., Shrivastava., & Vivek. (2019). Performance analysis of grid-connected 10.6 kw (commercial) solar pv power generation system - applied solar energy. Applied Solar Energy, 55(5), 269-281. doi:10.3103/s0003701x19050128
[8] Comparison of the economic benefits and the payback periods of rooftop solar panels in Australia. (n.d.). Retrieved from https://ieeexplore.ieee.org/abstract/document/8251811/
[9] Techno-economic analysis of off-grid rooftop solar PV system. (n.d.). Retrieved from https://ieeexplore.ieee.org/abstract/document/7584208/
[10] Jara, P. G., Castro, M., Esparcia, E. Jr., Odulio, C. M., & Ocon, J. (n.d.). Cooperation Document. Retrieved from https://sg.docs.wps.com/l/sIN-Izel2xI_sjAY
[11] Jara, P. G., Castroa, M., Esparcia, E. Jr., Odulio, C. M, & Ocon, J.. (n.d.). Cost Saving Potential of Grid-tied Solar Photovoltaic-based Hybrid Energy System in the Philippine Industrial Sector. Retrieved from https://www.aidic.it/cet/19/76/157.pdf?fbclid=IwAR19YRCJP9hGN5bBhZ4iHFlMNFVcpX_HRKtkCHberpoRPpvvHYcit9612XY
[12] Al-Adwan., & M., I. (n.d.). Performance assessment of the first residential grid-tie pv system in jordan. Retrieved from https://core.ac.uk/reader/234667380
[13] Hady, R. (2021). Performance evaluation of on-grid pv systems in egypt. Water Science. https://www.tandfonline.com/doi/full/10.1080/23570008.2021.1905347
[14] Karabulut., Mehmet., Kusetogullari., Huseyin., Kivrak., & Sinan. (2020). Outdoor performance assessment of new and old photovoltaic panel technologies using a designed multi-photovoltaic panel power measurement system. International Journal of Photoenergy, 2020. doi: https://doi.org/10.1155/2020/8866412
[15] Gomes C., Hizam, H., Maghami, M. R., Radzi, M. A., Rezadad, M. I, & Hajighorbani, S. (2016). Optimization of tilt angle for solar panel: Case study for Madinah, Saudi Arabia. Applied Energy, 88(4), 1427-1433. doi: 10.1016/j.apenergy.2010.10.001
[16] Diamenu, Godwin & Kwarteng, Joseph. (2008). Electric Power Distribution Network Performance Assessment Based on Reliability Indices.
[17] Bruce, J. (n.d.). What is the grid-tied solar system? how does grid-tie work? solar website Retrieved from https://diysolarshack.com/what-is-the-grid-tied-solar-system-how-does-grid-tie-work/
[18] Gajjar, J., Patel, D., Tripathi, B., & Ray, A. (2012). Please Wait... | Cloudflare. Retrieved from https://www.researchgate.net/profile/Abhishek-Saxe na-21/publication/255787303_ICORE_2012/links/5451e 1fb0cf2bf864cbaa40d/ICORE-2012.pdf#page=159.
How to cite this paper
@article{1703644,
author = {Addun, Eris Jeremiah T., Aguilar, John Carlo S., Aquino, John Michael Z., Bucad, Jerico C., Freneil R. Pampo},
title = {Performance Assessment of 676.8 kW Grid-Tied Solar Power Generating System at S&R San Fernando, Pampanga},
journal = {Iconic Research And Engineering Journals},
year = {2022},
volume = {6},
number = {1},
pages = {390-399},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1703644.pdf},
abstract = {The concept of energy security has emerged as a consequence of rising energy demand in developing countries. This has demanded the use of renewable resources' untapped potential. PV systems connected to the grid have emerged as the finest large-scale renewable energy sources. Performance assessments of these grid connected plants could help in designing, operating and maintenance of new grid connected systems. A 676.8 kWp photovoltaic grid connected power plant commissioned at SNR Membership Shopping, San Fernando is one of the few commercial establishments that installed a grid tied solar PV system in Pampanga. The site is receiving a good average solar radiation of 5.50 kWh/m2/day and the five months process average temperature of about 27.16 degrees centigrade. The plant is designed to operate with a fixed angle of 30?. In this study the solar PV plant design aspects along with its annual performance is elaborated. The various types of power losses (temperature, internal network, power electronics, grid connected etc.) and performance ratio are also calculated. The performance results of the plant are also compared with the simulation values obtained from PV Syst software and the PV Gis Site Simulator. The final yield (YF) of plant ranged from 3.23 to 5.15 kWh/m2/day, and annual performance ratio (PR) of 82.5% using the PV Syst simulator. Then, it has 17.85% Capacity Utilization Factor (CUF) with the five month period process energy generation of 396.16 MWh.},
month = {July},
}