MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA

SHUBHA KULKARNI SOWMYARANI MALSA NIDHISHREE D PATIL ARCHANA SHRUTI

Subject area: Science,Engineering and Technology  ·  Area of research: Electrical and Electronics Engineering

Abstract

Over the years the demand for high quality, greater efficiency and automated machines has increased in this globalised world. This paper summarize the various stages of operations involved in the conversion of a manually operated boiler towards a fully automated boiler The automation is further enhanced by constant monitoring of boiler using SCADA screen which is connected to the PLC by means of communication cable. In order to automate a power plant and minimize human intervention, there is a need to develop a SCADA system that monitors the plant and helps reduce the errors caused by humans. In this project SCADA system is used in monitoring the boiler parameter likes temperature, pressure, flow, level. Sensors are used to monitor the parameter and the sensed signals are processed by PLC and monitor with SCADA the signals are compared with the reference parameter and the respective valves of the parameter are adjusted with the monitoring and logic control system. We are generating 4MW and 6MW with the help the help of PS1 and PS2 respectively.

Keywords

Supervisory Control and Data Acquisition (SCADA), Programmable Logic Controller (PLC), Inputs/Outputs tags, Programming Interface, Alarms.

References

[1] Astha Nagar, Prof. Sandip Mehta “STEAM TURBINE LUBE OIL SYSTEM PROTECTION USING SCADA AND PLC” International conference on intelligent computing and control system ICICCS 2017

[3] Akash R. Jaiswal, Prof. P.P. Jagtap “STUDY OF PLC AND SCADA CONTROLLED THERMAL POWER PLANT” IRJET , Volume: 03 Issue: 04| Apr-2016.

[4] S. Kalivani, M. Jagadeeswari “PLC AND SCADA BASED EFFECTIVE BOILER AUTOMATION SYSTEM FOR THERMAL POWER PLANT”, IJARCET, Volume 4 Issue 4, April 2015.

[5] Anjali T H 1 , Dr. G Kalivarathan “ANALYSIS OF EFFICIENCY AT A THERMAL POWER PLANT” International Research Journal of Engineering and Technology (IRJET) Volume: 02 Issue: 05| Aug-2015.

[6] M. Kanmani, J. Nivedha ,G. Sundar “BELT CONVEYOR MONITORING AND FAULT DETECTING USING PLC AND SCADA” IJARCET,Vol.3,Special Issue 4.May 2014.

[7] Nowh Rajab Nowh Saad, Surya Praksha “HYDROGEN COOLING SYSYTEM IN THERMAL POWER PLANT USING PLC AND SCADA” International Journal of Electrical, Electronics and Telecommunication Engineering , vol.44, Special Issue 2.

How to cite this paper

SHUBHA KULKARNI, SOWMYARANI MALSA, NIDHISHREE D , PATIL ARCHANA, SHRUTI "MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA" Iconic Research And Engineering Journals Volume 1 Issue 11 2018 Page 19-23
SHUBHA KULKARNI, SOWMYARANI MALSA, NIDHISHREE D , PATIL ARCHANA, SHRUTI "MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA" Iconic Research And Engineering Journals, vol. 1, no. 11, May. 2018
SHUBHA KULKARNI, SOWMYARANI MALSA, NIDHISHREE D , PATIL ARCHANA, SHRUTI (2018). MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA. Iconic Research And Engineering Journals, 1(11).
SHUBHA KULKARNI, SOWMYARANI MALSA, NIDHISHREE D , PATIL ARCHANA, SHRUTI "MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA" Iconic Research And Engineering Journals, vol. 1, no. 11, May. 2018.
@article{1700678,
      author = {SHUBHA KULKARNI, SOWMYARANI MALSA, NIDHISHREE D , PATIL ARCHANA, SHRUTI},
      title = {MONITORING OF THERMAL POWER PLANT USING PLC AND SCADA},
      journal = {Iconic Research And Engineering Journals},
      year = {2018},
      volume = {1},
      number = {11},
      pages = {19-23},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1700678.pdf},
      abstract = {Over the years the demand for high quality, greater efficiency and automated machines has increased in this globalised world. This paper summarize the various stages of operations involved in the conversion of a manually operated boiler towards a fully automated boiler The automation is further enhanced by constant monitoring of boiler using SCADA screen which is connected to the PLC by means of communication cable. In order to automate a power plant and minimize human intervention, there is a need to develop a SCADA system that monitors the plant and helps reduce the errors caused by humans. 
In this project SCADA system is used in monitoring the boiler parameter likes temperature, pressure, flow, level. Sensors are used to monitor the parameter and the sensed signals are processed by PLC and monitor with SCADA the signals are compared with the reference parameter and the respective valves of the parameter are adjusted with the monitoring and logic control system. We are generating 4MW and 6MW with the help the help of PS1 and PS2 respectively.
},
      keywords = {Supervisory Control and Data Acquisition (SCADA), Programmable Logic Controller (PLC), Inputs/Outputs tags, Programming Interface, Alarms.},
      month = {May},
  }