To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects

Aishwarya Bajeerao Khochage Prof.G.N.Kanade

Subject area: Science,Engineering and Technology  ·  Area of research: CIVIL ENGINEERING

Abstract

These days the biggest problem which construction industry is greatly suffering is the ?DELAY in Construction Projects?. Which further responsible for cost overrun of the construction projects. This research paper presents the work that is to be done to avoid delays and concern methodology to do the same. It also represents importance of the project.

Keywords

Construction contracts, Cost overrun, Delays

References

[1] B.S.Patil,‘Building and Engineering Contracts’Fifth edition, Mrs. S. B. Patil Publication 2005.

[2] Christopher M. Gordon, Choosing appropriate construction contracting method,Science Direct

[3] Gary Peters, Contract Journal; Jul 1, 2009; 447, 6729.

[4] K. Chandrasekhar Iyer , Kalidindi N. Satvanarayana, Final and Binding Power Clauses In Indian Construction Contracts, Science Direct.

[5] Regional Science and Urban Economics, Volume 30, issue 6.

[6] Richard O’ Davis (Project Mgr.and Contract Documents Coordinator, Donohue &Assoc, Journal of Management in Engineering, Vol. 2, No. 2, April, 1986).

[7] Steven Hunt, Construction Management Guide, June16, 2009.

How to cite this paper

Aishwarya Bajeerao Khochage, Prof.G.N.Kanade "To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects" Iconic Research And Engineering Journals Volume 2 Issue 2 2018 Page 19-23
Aishwarya Bajeerao Khochage, Prof.G.N.Kanade "To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects" Iconic Research And Engineering Journals, vol. 2, no. 2, Aug. 2018
Aishwarya Bajeerao Khochage, Prof.G.N.Kanade (2018). To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects. Iconic Research And Engineering Journals, 2(2).
Aishwarya Bajeerao Khochage, Prof.G.N.Kanade "To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects" Iconic Research And Engineering Journals, vol. 2, no. 2, Aug. 2018.
@article{1700737,
      author = {Aishwarya Bajeerao Khochage, Prof.G.N.Kanade},
      title = {To Study Effects Of Critical Clauses In Contract Of Construction Projects To Avoid Delay In Projects},
      journal = {Iconic Research And Engineering Journals},
      year = {2018},
      volume = {2},
      number = {2},
      pages = {19-23},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1700737.pdf},
      abstract = {These days the biggest problem   which construction industry is greatly suffering is the ?DELAY in Construction Projects?. Which  further  responsible for cost overrun of the construction projects. This research paper  presents the work that is to be done to avoid delays and concern methodology to do the same. It also represents importance of  the project.},
      keywords = {Construction contracts, Cost overrun, Delays},
      month = {August},
  }