COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT

ZARGER MD MUJTABA ASHISH P. WAGHMARE

Subject area: Science,Engineering and Technology  ·  Area of research: Civil Engineering

Abstract

Construction equipment is one of the major resources in the construction process for construction companies through the mechanized construction of road projects. Construction equipment planning and management practice lack the necessary policy to meet the standard. As result, many road projects in India experienced time overrun, cost overrun and low quality. Construction equipment is a major resource in the building process for a construction project. When equipment is owned by a contractor, it forms a sizable portion of his assets requiring proper management practices. Selection of construction Equipment plays very crucial role in effective completion of any civil project. Thus selection and planning of equipment is essential for the utilization with minimum cost

Keywords

Equipment Planning, Equipment Management, Cost Overrun, Utilization

References

[1] Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects Argaw Tarekegn Gurmu1 and Ajibade Ayodeji Aibinu2 10.1061/(ASCE)CO.1943-7862.0001384. 2017 American Society of Civil Engineers.

[2] Causes of Delay in Road Construction Projects Ibrahim Mahamid1; Amund Bruland2; and Nabil Dmaidi3 10.1061/(ASCE)ME.1943-5479.0000096. 2012 American Society of Civil Engineers.

[3] Application of Lean Construction Concepts to Manage the Submittal Process in AEC Projects Ana Catarina V. M. F. Pestana1; Thaís da C. L. Alves, M.ASCE2; and André R. Barbosa, M.ASCE3 10.1061/(ASCE)ME.1943-5479.0000215. 2014 American Society of Civil Engineers.

[4] Application of Low-Cost Accelerometers for Measuring the Operational Efficiency of a Construction Equipment Fleet Changbum R. Ahn, M.ASCE1; SangHyun Lee, M.ASCE2; and Feniosky Pe˜na-Mora, M.ASCE3 10.1061/(ASCE)CP.1943- 5487.0000337. 2014 American Society of Civil Engineers.

[5] Materials Management Practices in the Construction Industry Carlos H. Caldas, M.ASCE1; Cindy L. Menches, M.ASCE2; Pedro M. Reyes3; Laure Navarro4; and Daniel M. Vargas5 10.1061/(ASCE)SC.1943-5576.0000238. 2014 American Society of Civil Engineers.

[6] Improvement Management Tools in the Construction Industry: Case Study of Mexico David Joaquín Delgado- Hernandez1; Cynthia Chrystell Cruz-Cruz2; and Pedro Yair Vences-García3 10.1061/(ASCE)CO.1943-7862.0001229. 2016 American Society of Civil Engineers.

How to cite this paper

ZARGER MD MUJTABA, ASHISH P. WAGHMARE "COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT" Iconic Research And Engineering Journals Volume 2 Issue 11 2019 Page 315-319
ZARGER MD MUJTABA, ASHISH P. WAGHMARE "COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT" Iconic Research And Engineering Journals, vol. 2, no. 11, May. 2019
ZARGER MD MUJTABA, ASHISH P. WAGHMARE (2019). COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT. Iconic Research And Engineering Journals, 2(11).
ZARGER MD MUJTABA, ASHISH P. WAGHMARE "COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT" Iconic Research And Engineering Journals, vol. 2, no. 11, May. 2019.
@article{1701419,
      author = {ZARGER MD MUJTABA, ASHISH P. WAGHMARE},
      title = {COMPUTATION OF PRODUCTIVITY RATE OF HEAVY DUTY EQUIPMENT IN FOUR LANE HIGHWAY PROJECT},
      journal = {Iconic Research And Engineering Journals},
      year = {2019},
      volume = {2},
      number = {11},
      pages = {315-319},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1701419.pdf},
      abstract = {Construction equipment is one of the major resources in the construction process for construction companies through the mechanized construction of road projects. Construction equipment planning and management practice lack the necessary policy to meet the standard. As result, many road projects in India experienced time overrun, cost overrun and low quality. Construction equipment is a major resource in the building process for a construction project. When equipment is owned by a contractor, it forms a sizable portion of his assets requiring proper management practices. Selection of construction Equipment plays very crucial role in effective completion of any civil project. Thus selection and planning of equipment is essential for the utilization with minimum cost},
      keywords = {Equipment Planning, Equipment Management, Cost Overrun, Utilization},
      month = {May},
  }