THE APPLICATION OF VALUE ENGINEERING ON CONSTRUCTION PROJECTS IN ABIA STATE, NIGERIA
Subject area: Science,Engineering and Technology · Area of research: Quantity Surveying
Abstract
Value engineering is a management technique used in many industries, focusing at enhancing functions, and reliability at the lowest cost. The focus of value engineering is removing unnecessary cost and improving functionality, The construction industry is faced with myriad of challenges ranging from poor value analysis, cost deviation, time overrun and design ambiguities which has hindered its ability to satisfy the client?s needs. Therefore this study assesses the application of value engineering in construction projects in Abia State. Its benefits and factors hindering its application in construction projects with the view to developing a framework for effective application of value engineering through the integration of building information modelling in the value engineering process. This thesis present an integrated framework for building construction professionals, owners and the VE team with automation capabilities to evaluate and compare different design alternatives of project components. A structured questionnaire were purposively distributed to four (4) groups of respondents, were completed and returned. Relative Importance Index was used to rank the agreement of the respondents. Spearman`s Rank Order Correlation coefficient was used to measure the strength and direction of association between the responses of the four groups of respondents. The results show the level of awareness and application of the concept within the construction industry, according to the rank agreement between the respondents, six (6) factors were ranked as most severe hindering factors to the application of value engineering in construction projects. The study concluded that value engineering is not commonly applied in the construction industry, there are potential benefits of integrating BIM into value engineering process in construction projects using the proposed framework which enables a 4D presentation to automate data extraction for project cost estimating, evaluation of alternatives, and to improved functionality of the projects, and recommended that there is the need for the construction industry to adopt the proposed value engineering framework to assist the VE team in decision making
References
[1] Aduze, O.C. (2014). A Study of the Prospects and Challenges of Value Engineering in Construction Projects in Delta and Edo States of Nigeria. MSc diss., Nnamdi Azikiwe University Awka.
[2] Ahmed. A, Amr. F, Ibrahim. A, Mohamed. A, Racha .R, (2015). Value Engineering Applications to Improve Value in Residential Projects, Conference Paper, May 27–30, 2015.
[3] Akintoye, A. (2001). Analysis of factors influencing project cost estimating practice. Journal Construction Management and Economics, (1) 77–89.
[4] Al-Yousefi, A. S. (2011).Value engineering application benefits in Sustainable Construction. SAVE International.
[5] Anyanwu C.I (2013). Project cost control in the Nigerian construction industry. International journal of Engineering Invention 2(12), 65-71.
[6] Aya Hasan Alkhereibi (2017). A framework for value engineering methodology application using Building Information Modelling (BIM), master thesis, the Islamic University, Gaza.
[7] Barango D.M (2017). Construction project abandonment: An appraisal of causes, effects and remedy. International journal of innovation and modern technology. 1(1) 2504- 4766.
[8] Cheah, C.Y.J. and Ting, S.K. (2005). Appraisal of value engineering in construction in Southeast Asia, International Journal of Project Management.7 (23) 151–158.
[9] Cheng Zhang, T. Z. (2016). Quantitative Assessment of Building Constructability UsingBIM and 4D Simulation. Open Journal of Civil Engineering, 442-461.
[10] DarshanParakhiya, Jitendra, P. (2017). Application of Value Engineering in Construction Project: Case Study on Residential Project in Ahmedabad, International Journal for Scientific Research & Development (IJSRD), 5 (2) 2321-0613.
[11] Department Of Civil Defense, U. (2006, may). Contractor's Guide to Value Engineering .Version 2.1.
[12] Eastman C, Teicholz P, Sacks R,( 2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. New York: John Wiley and Sons.
[13] Ewa U.E (2013). Root cause of project abandonment in tertiary institutions in Nigeria. International business research 6(11), 149-159.
[14] Farahmandazad, M. (2015). Developing a model for implementation of value engineeringsystem for the construction projects of executing construction project- basedcompanies (fourth factor) case study: construction projects of social securityorganization. Indian Journal of Fundamental and Applied Life Sciences, 1403-1413.
[15] Galipogullari, S. A. (2013). Application of Value Engineering in Construction. Journalof Traffic and Transportation Engineering,, 39- 48.
[16] Ilayaraja, MD. Zafar Eqyaabal (2015). Value Engineering in Construction, Indian Journal of Science and Technology, (8) 32.
[17] Khaled Ali Alabd Ahmed, R. K. Pandey (2016). Concept of Value Engineering in Construction Industry,International Journal of Science and Research (IJSR), 5 (4) 2319- 7064.
[18] Kolo, B.A. and Ibrahim, A.D. (2010) Value management: How adoptable is it in the Nigerian construction industry? In: Laryea, S., Leiringer, R. and Hughes, W. (Eds) Procs West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, 653-663.
[19] Lai, N.K. (2006). Value Management in Construction Industry. MSc diss., Technology University of Malaysia.
[20] Li, X. and Ma, W. (2012). Appraisal of Value Engineering Application to Construction Industry in China. Y.Zang (Ed.): Future Wireless Networks and Information Systems, LNEE (144) 303-311.
[21] Malla, S. (2013). Application of Value Engineering in Nepalese Building Construction Industry.http://professionalprojectmanagemen t.blogspot.kr/2013/06/application-of-value- engineering-in.html. Accessed on 20 May 2018
[22] Mansour AK, (2013). Value Engineering in Developing Countries. International Conference Data Mining, Civil and Mechanical Engineering, Bali Indonesia. 4 (1) 58-60
[23] Odeyinka, H. A. (2006). The Role of Quantity Surveyor in Value Management, 22nd biennial conference of quantity surveying in the 21st century– Agenda for the future. Nigerian Institute of Quantity Surveyors
[24] Oke A.E. and Ogunsemi D.R. (2011). Value management in the Nigerian construction industry: Militating factors and the perceived benefits. Second International Conference on Advances in Engineering and Technology: 353-359.
[25] Perera, S. and Karunasena, G. (2004). Application of Value Management in the Construction Industry of Sri Lanka. The Value Manager, 10(2): 4-8.
[26] Philip D., Stephen Mansfield, Udo-Inyang (2006). Application of Value Engineering Within the Construction Industry, ASC Proceedings of the 42nd Annual Conference, Colorado State University Fort Collins, Colorado, April 20 - 22, 2006.
[27] Azhar, A. N. (2008). Building Information Modeling (BIM): A New Paradigm for Visual. First International Conference on Construction in Developing.
[28] SAVE International. (2015, March). Value Methodology Standard. SAVE International
[29] SenayAtabay and NiyaziGalipogullari (2013). Application of value engineering on construction projects. 1, (1) 39-48
[30] Shen, Q. and Liu, G. (2004). Application of value management in the construction industry in China. Engineering, Construction and Architectural Management, 11(1): 9-19.
[31] Umar Aminuhayatu, (2015) Msc Thesis On An Assessment Of The Nigerian Construction Industry’s Readiness To Adopt Value Management Process In Effective Project Delivery, department of quantity surveying, Faculty of environmental design, ahmadu bello university, zaria.
[32] Whyte, A. and Cammarano, C. (2012). Value management in infrastructure projects in Western Australia.techniques and staging. In: Smith, S.D.(Ed)Procs 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK, Association Of Researchers In Construction Management, 797-80.
[33] Yalda Ranjbaran (2013). Integrated Computational Model in Support of Value Engineering, A master thesis, Concordia University, Canada.
How to cite this paper
@article{1701665,
author = {NNOLUM NKECHINYERE PERPETUA},
title = {THE APPLICATION OF VALUE ENGINEERING ON CONSTRUCTION PROJECTS IN ABIA STATE, NIGERIA },
journal = {Iconic Research And Engineering Journals},
year = {2019},
volume = {3},
number = {4},
pages = {40-55},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1701665.pdf},
abstract = {Value engineering is a management technique used in many industries, focusing at enhancing functions, and reliability at the lowest cost. The focus of value engineering is removing unnecessary cost and improving functionality, The construction industry is faced with myriad of challenges ranging from poor value analysis, cost deviation, time overrun and design ambiguities which has hindered its ability to satisfy the client?s needs. Therefore this study assesses the application of value engineering in construction projects in Abia State. Its benefits and factors hindering its application in construction projects with the view to developing a framework for effective application of value engineering through the integration of building information modelling in the value engineering process. This thesis present an integrated framework for building construction professionals, owners and the VE team with automation capabilities to evaluate and compare different design alternatives of project components. A structured questionnaire were purposively distributed to four (4) groups of respondents, were completed and returned. Relative Importance Index was used to rank the agreement of the respondents. Spearman`s Rank Order Correlation coefficient was used to measure the strength and direction of association between the responses of the four groups of respondents. The results show the level of awareness and application of the concept within the construction industry, according to the rank agreement between the respondents, six (6) factors were ranked as most severe hindering factors to the application of value engineering in construction projects. The study concluded that value engineering is not commonly applied in the construction industry, there are potential benefits of integrating BIM into value engineering process in construction projects using the proposed framework which enables a 4D presentation to automate data extraction for project cost estimating, evaluation of alternatives, and to improved functionality of the projects, and recommended that there is the need for the construction industry to adopt the proposed value engineering framework to assist the VE team in decision making},
month = {October},
}