Flexible Scheduling In Construction Project
Subject area: Science,Engineering and Technology · Area of research: Construction engineering and management
Abstract
The purpose of this project is to optimize the resources by using the methods "Resource allocation, Resource leveling, time cost trade off". Resource allocation is used to assign available resources in an economic way. Resource allocation is the scheduling of activities and the resources required by those activities while taking into construction both the resource availability and the project time. Resource levelling aims to minimize the period variation in resource loading. Resource levelling involves redistribution and imbalance of allocated work. Resource levelling techniques were developing to enhance the shape of the resource histogram by reducing its variations. Time cost trade of is project duration can be reduced by assigning more resources to project activity. Doing this however increases project cost. The critical path method is used for scheduling a set of project activities. The analysis of resources also done by using primavera software.
Keywords
Resource allocation, Resource Leveling, Time cost trade off, primavera.
References
[1] A Guide to the Project Management Body of Knowledge (PMBOK Guide). (2013). PMI.
[2] Ahamed E. Haroun, Adil H.A. Loghman, And Salam Y. M. Mahmoud..Etc (2012) “Scheduling Problem under Constrained Resource: A Historical Review of Solution Methods And Computer Application” Journal of Science and Technology
[3] Amir Azaron, Cahit Perkgoz. and Masatoshi Sakawa. (2010), „A genetic algorithm approach for the time-cost trade off in PERT networks‟, International Journal of Earth Science and Engineering, Volume 09, No.03, pp-506-509.
[4] anafha anirudhgalagali(2017)time cost quality trade off in construction project management‟‟
[5] Anagha, Anirudh. and Galagali. (2017), „Time cost quality trade off in construction project management‟, SSRG International Journal of Civil Engineering, Volume 4, Issue 8.
[6] Andrew Fernans Tom, Sachin Paul (2013) “Project Monitoring And Control Using Primavera” International Journal of Innovative Research in Science, Engineering and Technology
[7] Anuj Dubey (2015) „Resource Levelling for a Construction Project‟, IOSR Journal of Mechanical and Civil Engineering (IOSRJMCE) e- ISSN: 2278-1684, p-ISSN: 2320-334X, Volume 12, Issue 4 Ver. IV (Jul. - Aug. 2015), PP.05-11, www.iosrjournals.org
[8] Anuj Dubey. (2015), „Resource leveling for a construction project‟, IOSR Journal of Mechanical and Civil Engineering, Volume 12, Issue PP 05-11.
[9] Archibald, R. D. and Villoria, R. L. (1966) „Network-based management systems (PERT/CPM)‟, Wiley, New York.
[10] B. S. K. Reddy, S K. Nagaraju, M D Salman (2015) “A Study on Optimisation of Resources for Multiple Projects By Using Primavera” Journal of Engineering Science and Technology
[11] B. S. K. Reddy, SK. Nagaraju and MD. Salman (2015) „A Study on Optimization of Resources for Multiple Projects by using Primavera‟, Journal of Engineering Science and Technology Vol. 10, No. 2 PP. 235 – 248 Taylor‟s University
[12] b.s.k.reddy, s.k.nagaraju and m.d salman(2015)a study on optimizationof resources for multiple projects by using primavera‟‟
[13] Bhajanthri Thirumalesha, Rajani V.Akki. And Basavaraj Bavi. (2017), „Resource Optimization in Construction of a Residential Apartment Using primavera p-6 Software‟, International Research Journal of Engineering and Technology, Volume 04, No.06.
[14] Bhushan , Tatar.V. and Prof. Rahul S. Patil. (2009), „Time and cost optimization techniques in construction project management‟, International Journal of Latesr Trends in Engineering and Technology, Vol.07, No.03, pp.230-237.
[15] Devikamalam.J.Jane Helena. 2013 “Resource Scheduling Of Construction Projects Using Genetic Algorithm” International Journal of Advanced Engineering Technology
[16] Eliyahu m. goldratt (1990) „What is this thing called theory of constraints and how should it be implemented?‟ North River Press, Croton-on- Hudson,N.Y.
[17] Francois Berthaut..etc (2011) “Optimal Resource Constrain Project Scheduling With Overlapping Modes” International Journal of Advanced Engineering Technology
[18] Gido, J. and Clements, J. P. (2003) „Successful project management‟, Thomson/South-Western, Mason, Ohio
[19] Hamed Ziaidoostan, Hamidreza Ghaneh. And Matin Amanin. (2013), „Using primavera software in resource allocation and project evaluation of construction projects‟, Interdisciplinary Journal of Contemporary Research in Business, Volume 4, No 12.
[20] hamed ziaidoostan,hamidreza ghaneh,matin amanin and mahamadmahi gholipoor(2013)using primavera software in resource allocation and project evaluation of construction projects‟‟
[21] James E. Seibert, Associated Member, ASCE, and Gerald W. Evans; Journal of construction engineering and management; "Time Constrained Resources Leveling".
[22] Jin-Lee Kim and Ralph D. Ellis Jr.(2008) “PermutationBased Elitist Genetic Algorithm for Optimization of LargeSized Resource Project Scheduling”, Journal of Construction Engineering and Management
[23] John C. Hildreth and Brian P. Munoz (2005) „An Introduction to the Management Principles of Scheduling‟, A report presented to the Virginia Department of Transportation and the vdot-vt Partnershifor Project Scheduling AdvisoryBoard.
[24] Kastor And K. Sriakoulis (2010) “Effectiveness Of Resource Leveling Tools For Resource Constraint Project Scheduling Problem” International Journal of Project Management
[25] kastor,k.sirakoulis(2008)the effectiveness of resource levelling tools for resource constraint project scheduling problem‟‟
[26] Kastor.A. and Sirakoulis.K. (2008), „The effectiveness of resource leveling tools for resource constraint project scheduling problem‟, International Journal of Project Management 27, pp.493-500.
[27] Maroto, C., Tormos, P., & Lova, A. (1998). “The evolution of software quality in project scheduling”. (W. J, Ed.) Project scheduling - recent models, algorithms and applications
[28] Maruthi s, Dr J R Patil and Rohit S Agawane, 2015Optimization for Fluctuations in resource demands in construction projects by Volume:02 Issue:03,june
[29] Merin Saji, Shobana.K. and Vadive.M. (2016), „Optimization of construction resource leveling by comparing primavera and MAT lab‟, International Journal of Advanced Science and Engineering Research, Volume: 1, Issue: 1.
[30] merin saji,k.shobana (2016)optimization of construction resource by comparing primavera a levelling and mat lab”
[31] Milos Seda (2008) “A Construction to Shift Algorithms for Resource-Constrained Scheduling With Dynamic Changes” International Journal of Advanced Engineering Technology
[32] Ming Fung Francis Siu, S.M.ASCE; Ming Lu, P. Eng., Simaan Abourizk, and Vincent Tidder; "Quantitative Assessment of budget sufficiency and resource Utilization for Resource Constrained Project Schedules". Vol-2 Issue-4 2016 ijariie- issn(o)-2395-4396 2893 www.ijariie.com 499
[33] Qingyou Yan, Qian Zhang. and Xin Zou. (2016), „cost optimization model for multi resource leveling problem without project duration constraint‟, Hindawi Publishing Corporation Discrete Dynamics in Nature and Society, Volume 2016.
[34] qingyou yan,qian zhang,and xin zou(2016)cost optimization model for multi resource leveling problem without project duration constraint‟‟
[35] Reddy.B.S.K, Nagaraju.S.K. and Salman.M.D. (2015), „A study on optimization of resources for multiple projects by using PRIMAVERA‟, Journal of Engineering Science and Technology, Volume 10, No. 2
[36] Rhuta Joshil, Pros. V. Z. Patil (2013) “Resource Scheduling Of Construction Project: Case Study” International Journal of Science and Research
[37] Said M. Easa, Member, 1989,"Resource Leveling in Construction by Optimization” ASCE, Journal of construction of engineering and management.
[38] Shashank Bharatkumar Malpani, “Optimization and leveling the resources of an existing building by using primavera software” PG scholar, M.E, Department of Civil Engineering, Trinity Academy of Engineering (TAE), Savitribai Phule Pune University, Pune, India
[39] Shashank,bharathkumarmalpani,prof.s.s.deshmuk h(2016)optimization and levelling the resources of an existing building by using primavera software‟‟
[40] Steiness, K. (2014, August 26). “Resource Leveling Best Practices”. Retrieved July 3, 2015, from MPUG: http://www.mpug.com/articles/resource-leveling- best-practices/
[41] sujatha bala ,dr.sahdeo mahto(2017)‟‟Resource allocation by histogram and time scale method with pert/cpm”
[42] T.Subramani, K.Chinnadurai (2015) “Construction Management And Scheduling of Residential Building Using Primavera” International Journal of Application or Innovation in Engineering & Management
[43] Tran, H.-H., & Hoang, N.-D. “A Novel Resource- Leveling Approach for Construction Project Based on Differential Evolution”.
[44] Veena H C¹, Schedule Control of an Apartment Building using Primavera Techniques 1Post graduate Student, Department of Civil Engineering, NCET,Bangalore, Karnataka, India
[45] vignesh v (2017) resource using primavera p6” optimization of construction project
[46] Vignesh V1 B.E., 5015 “Resource Optimization of Construction Project Using Primavera P6” Thiagarajar College of Engineering, Department of civil Engineering, Madurai-62, India.
[47] vipin kumar,dr.sreenivasreddy,shahpur maneeth and p.d.brijbhushan (2017)‟‟analysis of academic building by planning,scheduling and resource allocation using oracle primavera p6‟‟
[48] wajid hussain, dr.m.k.trivedi and dr.r.kansal(2015)optimization of construction resource allocation and leveling using genetic algorithm‟‟
[49] Winter, R. (2006). “Proper Implementation of Resource Leveling. Ron Winter Consulting”.
[50] Yang, B., Geunes, J., & O' Brien, W. J. (2011, April). “Resource- Constrained Project Scheduling: Past Work and New Directions”.
How to cite this paper
@article{1701739,
author = {Divya V S},
title = {Flexible Scheduling In Construction Project},
journal = {Iconic Research And Engineering Journals},
year = {2019},
volume = {3},
number = {5},
pages = {59-65},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1701739.pdf},
abstract = {The purpose of this project is to optimize the resources by using the methods "Resource allocation, Resource leveling, time cost trade off". Resource allocation is used to assign available resources in an economic way. Resource allocation is the scheduling of activities and the resources required by those activities while taking into construction both the resource availability and the project time. Resource levelling aims to minimize the period variation in resource loading. Resource levelling involves redistribution and imbalance of allocated work. Resource levelling techniques were developing to enhance the shape of the resource histogram by reducing its variations. Time cost trade of is project duration can be reduced by assigning more resources to project activity. Doing this however increases project cost. The critical path method is used for scheduling a set of project activities. The analysis of resources also done by using primavera software.},
keywords = {Resource allocation, Resource Leveling, Time cost trade off, primavera.},
month = {November},
}