Quantification Of Construction And Demolition Wastes By Using Effective Modelling Software
Subject area: Science,Engineering and Technology · Area of research: Construction engineering and management
Abstract
Construction waste is generated throughout the construction process such as during site clearance, material use, materials damage, material non-use, excess procurement and human error. The lack of appropriate management of construction and demolition waste (CDW) is being increasingly associated with ecosystem damage and environmental impacts in the proximity of open dumping areas. Yet, the development and optimization of management models require accurate prediction of generation rates and waste composition , often lacking in developing countries .In this project the collection of construction waste is considered and recycling methods are stipulated by forming new stages of materials from CDW waste and create the strengthened composite for further process. This project may give a clear view on the CDW percentage, list of waste collected and recycled product of the waste, accordingly usage strength of the composite (recycled waste) effectively using computer aided Three dimensional Interactive Application (CATIA Designing) and ANSYS(Analyzing the strength of the new composite) respectively.
Keywords
C&D waste, recycling waste, composite material, waste quantification.
References
[1] Ahmand firman masudi.,2008 “Quantification Methods for Construction Waste Qeneration at Construction Sites: a Review”
[2] Anna Bergek., 2014 “The Impact of Environmental Policy Instruments on Innovation:A Review of Energy and Automotive Industry Studies”
[3] A. Papondopooulous.,2002 “Development of an Integrated Plan for Solid Waste Management in Cyprus”
[4] Amornchai Challcharoenwattana.,2015 “Co- benefits of HouseHold Waste Recycling for Local Community‟s Sustainable Waste Management in Thailand”
[5] Avindana John.,2017 “Applicability of Construction and Demolition Waste Concrete in Construction Sector- Review”
[6] 6. Abhijith Harikumar.,2014“Minimizing Construction Wastes by Efficient Site Practices”
[7] Bahareth Hadavand.,2013 “Assessing the Influence of Construction and Demolition Waste Materials on Workability and Mechanical Properties of Concrete Using Statistical Analysis”
[8] Chooi Mei Mah.,2016 “Construction and Demolition Waste Generation Rates for High- Rise Buildings in Malaysia”
[9] Che Rosamani Che Hassan.,2012 “Waste Quantification Models for Estimation of Construction and Demolition Waste Generation: a Review”
[10] Chooi Mei Mah.,2018 “Environmental Impacts of Construction and Demolition Waste Management Alternatives”
[11] Dzulkarnaen Ismail.,2017 “ Analysis of Variance of the Effects of a Projects Location on Key Issues and Challenges in Post- Disaster Reconstruction Projects”
[12] Diana C. Tascon-Hoyos.,2012 “Dynamic Model for Comparing the Performance of Waste Management Strategies Over Sustainable Dimensions”
[13] E.Yiicesan,C.-H. Chen., 2002 “Optimization of the Waste Management for Construction Projects Using Simulation”
[14] G.G. Giwangkara.,2019 “recycled concrete arrogate as a road base material”
[15] Hendriks.C (et all.,)2014 “Demolition Waste Generation For Development Of a Regional Management Chain Model.”
[16] Herlin Suciati.,2018 “A Dynamic Model for Assessing the Effects of Construction Workers‟ Waste Behaviour to Reduce Material Waste”
[17] Jongsung Won and Jack C.P. Cheng “Time- Based Construction Waste Management Planning Using Building Information Modeling (BIM)”
[18] Jiu Jingkuang., 2018 “A Model for Quantification of Construction Waste in New Residential Buildings in Pearl River of China.”
[19] Jef Bergmans.,2007 “Recycling of Construction and Demolition Waste: Case Study in the Port of Antwerp”
[20] Jianguo Chen.,2006 “Managerial Areas of Construction and Demolition Waste: a Scientometric Review”
[21] Khalid lqbal.,2016 “Quantitative and Qualitative Estimation of Construction Waste Material in Punjab Province Pakistan
[22] Kambiz Ghafourian.,2016 “Current Status of the Research on Construction and Demolition Waste Management”
[23] Mr. Yunhui Yang.,2015 “Referring Sustainable Waste Management Strategy Drives Life-Cycle Sustainable Building Benefits of China”
[24] Mr.A.R. Makegaonkar.,2018 “Study of Construction and Demolition Waste for Reuse and Recycle”
[25] Nuria Calvo.,2014 “ A Dynamic Model for Construction and Demolition (C&D) Waste Management in Spain: Driving Policies Based on Economic Incentives and Tax Penalties”
[26] O.E.K.Daoud.,2009 “Necessary Measures to Reduce Construction Waste in Egypt: a Model for Developing Countries”
[27] Oyeshola Femi Kofoworola.,2012 “Estimation of Construction Waste Generation and Management in Thailand.”
[28] P.Dharani.,2018 “Utilization of Bakelite and Waste Plastic in Flexible Pavement Construction- a Review”
[29] Patrizia Ghisellini., “Evaluating the Transition Towards Cleaner Production in the Construction and Demolition Sector of China: a Review”
[30] Rosami Che Hassan.,2016 Rogerio Bonette Klepa.,2019 “Reuse of Construction Waste to Produce Sensor for the Use in Highway Traffic Control”
[31] Y.Ruwanpura.,2018 “Reuse of Construction Waste to Produce Thermoluminescent Sensor for use in Highway Control”
[32] Rawshan Aran Begum.,2009 “Attitude and Behavioural Factors in Waste Management in the Construction Industry of Malaysia”
[33] Rogerio Bonette Klepa.,2019 “Reuse of Construction Waste to Produce Thermoluminescent Sensor for the Use in Highway Traffic Control”
[34] Ruoyu Jin., 2019 “Science Mapping Approach to Assisting the Review of Construction and Demolition Waste Management Research Published Between 2009 and 2018”
[35] Robert H.Crawford.,2017 “Barriers to Improving the Environmental Performance of Construction Waste Management in Remote Communities”
[36] Rema.R.,2018 “Review on the Current Construction and Demolition Waste Management Framework”
[37] “Sandhan k ghosh,h.s. haldar.,(2016) „an Optimization Model on Construction and Demolition Waste Quantification from Building.”
[38] S.Agyeman.,(2019) „Exploiting Recycled Plastic Waste as an Alternative Binder for Paving Blocks Production.
[39] Sandeep shrivastava.,2011 “Construction Materials and C&D Waste in India”
[40] Siti Akhtar Mahayuddin.,2013 “Quantification of Waste in Conventional Construction”
[41] Sadhan K Ghosh.,2016 “An Optimization Model on Construction and Demolition Waste Quantification from Building”
[42] Srujal Patal.,2016 “ Cost Optimization of the Project by Construction Waste Management”
[43] S.Agyeman.,2019 “Exploiting Recycled Plastic Waste as an Alternative Binder for Paving Blocks Production”
[44] Siti Aminah Abd Kadar.,2017 “Stability and Volumetric Properties of Asphalt Mixture Containing Waste Plastic”
[45] T.Y. Hsiaso.,2002 “modeling materials flow of waste concrete from construction and demolition wastes in Taiwan”
[46] Varsha Ashokkumar.,2018 “BIM based 3D Model for Construction Waste Quantification”
[47] “Weisheng Lu and Hongping Yuan.,2011 “A Framework for Understanding Waste Management Studies in Construction”
[48] “Xuedong Guo.,2019 “Using Sustainable Oil Shale Waste Powder Treated with Silane Coupling Agent for Enriching the Performance of Asphalt and Asphalt Mixture”
[49] Yousong Wang.,2013 “cost analysis of construction and demoilition waste management: case study of the pearl river delta of china”
[50] zhikang bao, weisheng lu.,2019 “Procurement Innovation for a Circular Economy of Construction and Demolition Waste:Lessons Learnt from Suzhou,China.”
How to cite this paper
@article{1701740,
author = {Angel Aishwarya. P},
title = {Quantification Of Construction And Demolition Wastes By Using Effective Modelling Software},
journal = {Iconic Research And Engineering Journals},
year = {2019},
volume = {3},
number = {5},
pages = {66-72},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1701740.pdf},
abstract = {Construction waste is generated throughout the construction process such as during site clearance, material use, materials damage, material non-use, excess procurement and human error. The lack of appropriate management of construction and demolition waste (CDW) is being increasingly associated with ecosystem damage and environmental impacts in the proximity of open dumping areas. Yet, the development and optimization of management models require accurate prediction of generation rates and waste composition , often lacking in developing countries .In this project the collection of construction waste is considered and recycling methods are stipulated by forming new stages of materials from CDW waste and create the strengthened composite for further process. This project may give a clear view on the CDW percentage, list of waste collected and recycled product of the waste, accordingly usage strength of the composite (recycled waste) effectively using computer aided Three dimensional Interactive Application (CATIA Designing) and ANSYS(Analyzing the strength of the new composite) respectively.},
keywords = {C&D waste, recycling waste, composite material, waste quantification.},
month = {November},
}