Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation

Bestman U. Obi Dikio C. Idoniboyeobu Sepribo L. Braide

Subject area: Science,Engineering and Technology  ·  Area of research: Electrical Engineering

Abstract

Power quality is an important factor to consider when dealing with distribution of electrical power to final consumers. Though there are several methods employed to improve power quality but in this research load tap changer is used because of its simplicity and economical value. Electrical Transient Analyzer Program (ETAP) is used to model and simulate the Iwofe injection network, on simulation it was discovered that the network was characterized by low power factor, high power losses and under voltage which causes the buses to be flagged critical. After Application of the optimization technique the power factor increased to 90.20% and power losses reduced to 0.168MW respectively leading to increase in performance, voltage stability and accommodation of real power in the system.

Keywords

Distribution Network, Iwofe Injection Substation, Load Tap Changer, Power Factor, Power Quality

References

[1] B. U. Obi, V. C. Ibanibo, and B. A. Wokoma, - Power factor correction in iwofe injection substation; impact on the distribution network,| American Journal of Engineering Research, vol. 8, pp. 186 – 195, October 2019

[2] M.K.T. Khaing, -Co-operation of on-load tap changing transformer and shunt capacitor for power quality improvement in large industrial load, | www.academia.edu/38606760/co- operation_of_On- Load_Tap_Changing_Transformer_and_Shunt_C apacitor_for_Power_Quality_Improvement_in_La rge_Industrial_Load

[3] K. B. Kamry –Boost converter with power factor correction, || M.S. thesis, Dept Electron. Univ. Malaysia Pahang, India, 2012

[4] D. C. Idoniboyeobu, B. C. Wokoma, and V. C. Ibanibo, -Preventive maintenance for substation with aging equipment using weibull distribution,| American Journal of Engineering Research, vol. 7, pp. 95 – 101, April 2018

How to cite this paper

Bestman U. Obi, Dikio C. Idoniboyeobu, Sepribo L. Braide "Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation" Iconic Research And Engineering Journals Volume 3 Issue 5 2019 Page 120-128
Bestman U. Obi, Dikio C. Idoniboyeobu, Sepribo L. Braide "Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation" Iconic Research And Engineering Journals, vol. 3, no. 5, Nov. 2019
Bestman U. Obi, Dikio C. Idoniboyeobu, Sepribo L. Braide (2019). Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation. Iconic Research And Engineering Journals, 3(5).
Bestman U. Obi, Dikio C. Idoniboyeobu, Sepribo L. Braide "Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation" Iconic Research And Engineering Journals, vol. 3, no. 5, Nov. 2019.
@article{1701757,
      author = {Bestman U. Obi, Dikio C. Idoniboyeobu, Sepribo L. Braide},
      title = {Power Quality Improvement Using Load Tap Changer Case Study: Iwofe Injection Substation},
      journal = {Iconic Research And Engineering Journals},
      year = {2019},
      volume = {3},
      number = {5},
      pages = {120-128},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1701757.pdf},
      abstract = {Power quality is an important factor to consider when dealing with distribution of electrical power to final consumers. Though there are several methods employed to improve power quality but in this research load tap changer is used because of its simplicity and economical value. Electrical Transient Analyzer Program (ETAP) is used to model and simulate the Iwofe injection network, on simulation it was discovered that the network was characterized by low power factor, high power losses and under voltage which causes the buses to be flagged critical. After Application of the optimization technique the power factor increased to 90.20% and power losses reduced to 0.168MW respectively leading to increase in performance, voltage stability and accommodation of real power in the system.},
      keywords = {Distribution Network, Iwofe Injection Substation, Load Tap Changer, Power Factor, Power Quality},
      month = {November},
  }