Abstract

Low productivity is the chronic problem in construction industry. One way to increase the productivity is to reduce non-value adding activities. A number of problems affecting productivity can be noted when the activities in progress on a typical construction site are closely observed. Productivity improvements achieve higher cost savings with minimal investment. Lean construction is relatively a new construction management philosophy which has evolved from Lean Manufacturing principles. Lean construction along with its various tools like Pull Approach, Just in Time (JIT), The Last Planner System (LPS), Total Quality Management (TQM), Work Sampling (WS) and Value Stream Mapping (VSM) etc. has gathered a lot of momentum in the developed nations. The challenge now lies in implementing it in the developing countries. Lean Construction is a philosophy based on the concepts of lean manufacturing. It is about managing and improving the construction process to profitably deliver what the customer needs. Because it is a philosophy, lean construction can be pursued through a number of different approaches. This Research thesis outlines the elements of lean manufacturing and suggests how these might be adapted to deliver lean construction in practice.

Keywords

Lean Technology, Work Sampling, Value stream mapping

References

[1] Koskela, L. and Howell, G., (2002), “The Underlying Theory of Project Management is obsolete”

[2] Kpamma, Z.E., (2009), “The practice of lean thinking at the pre-contract stage of building construction projects by selected Ghanaian firms”, a thesis submitted to the Department of Building Technology at the Kwame Nkrumah University of Science and Technology.

[3] Liker, J.K. (2004), “The Toyota Way: 14 management principles from the world’s greatest manufacturer”, New York; London, McGraw-Hill.

[4] Mossman, A., (2009), “Why isn’t the UK Construction Industry going lean with gusto?” Lean Construction Journal.

[5] Peter Simonsson1, Anders Björnfot2, Jarkko Erikshammar3 & Thomas Olofsson4, (2012), “‘Learning to see the Effects of Improved Workflow in Civil Engineering Projects”, Lean Construction Journal.

[6] Womack, J. P., and Jones, D. T., (1996), “Lean Thinking: Banish Waste and Create Wealth in Your Corporation”.

[7] Womack, J.P., Daniel, P., Jones, T. and Ross, D., (1990), “The machine that changed the world”

How to cite this paper

Vinod Chavan, Prof. Ashish P. Waghmare, Dr. Nagesh Shelke, Prof. Gaurav Vispute "Work Sampling and Value Stream Mapping Of Lean Construction" Iconic Research And Engineering Journals Volume 4 Issue 7 2021 Page 104-110
Vinod Chavan, Prof. Ashish P. Waghmare, Dr. Nagesh Shelke, Prof. Gaurav Vispute "Work Sampling and Value Stream Mapping Of Lean Construction" Iconic Research And Engineering Journals, vol. 4, no. 7, Jan. 2021
Vinod Chavan, Prof. Ashish P. Waghmare, Dr. Nagesh Shelke, Prof. Gaurav Vispute (2021). Work Sampling and Value Stream Mapping Of Lean Construction. Iconic Research And Engineering Journals, 4(7).
Vinod Chavan, Prof. Ashish P. Waghmare, Dr. Nagesh Shelke, Prof. Gaurav Vispute "Work Sampling and Value Stream Mapping Of Lean Construction" Iconic Research And Engineering Journals, vol. 4, no. 7, Jan. 2021.
@article{1702697,
      author = {Vinod Chavan, Prof. Ashish P. Waghmare, Dr. Nagesh Shelke, Prof. Gaurav Vispute},
      title = {Work Sampling and Value Stream Mapping Of Lean Construction},
      journal = {Iconic Research And Engineering Journals},
      year = {2021},
      volume = {4},
      number = {7},
      pages = {104-110},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1702697.pdf},
      abstract = {Low productivity is the chronic problem in construction industry. One way to increase the productivity is to reduce non-value adding activities. A number of problems affecting productivity can be noted when the activities in progress on a typical construction site are closely observed. Productivity improvements achieve higher cost savings with minimal investment. Lean construction is relatively a new construction management philosophy which has evolved from Lean Manufacturing principles. Lean construction along with its various tools like Pull Approach, Just in Time (JIT), The Last Planner System (LPS), Total Quality Management (TQM), Work Sampling (WS) and Value Stream Mapping (VSM) etc. has gathered a lot of momentum in the developed nations. The challenge now lies in implementing it in the developing countries.
 Lean Construction is a philosophy based on the concepts of lean manufacturing. It is about managing and improving the construction process to profitably deliver what the customer needs. Because it is a philosophy, lean construction can be pursued through a number of different approaches. This Research thesis outlines the elements of lean manufacturing and suggests how these might be adapted to deliver lean construction in practice.},