Delay Analysis in Infrastructure projects.

Aditya M. Mahajan Dr. Pratibha. Alandkar

Subject area: Science,Engineering and Technology  ·  Area of research: Construction Management

Abstract

The construction industry is second largest sector contributing to economy after agriculture. India?s population growth and economic growth requires improved transport infrastructure including roads, railways, aviation and waterways. There is problem of delay in such projects not only in India but its worldwide phenomenon. Delays causes time lag as well as cost overrun which is not affordable in developing economy as it has limited resources. To avoid such delays different factors causing delay should be identified and analyzed. This report discuss delay in infrastructure projects considering various factors causing delay. A questionnaire was prepared considering various factors causing delay and sent to various experts and people with experience in infrastructure industry for ranking of various factors. This data was used to analyze various factors causing delay

Keywords

Delay, tender, schedule ,infrastructure

How to cite this paper

Aditya M. Mahajan, Dr. Pratibha. Alandkar "Delay Analysis in Infrastructure projects." Iconic Research And Engineering Journals Volume 4 Issue 12 2021 Page 78-81
Aditya M. Mahajan, Dr. Pratibha. Alandkar "Delay Analysis in Infrastructure projects." Iconic Research And Engineering Journals, vol. 4, no. 12, Jun. 2021
Aditya M. Mahajan, Dr. Pratibha. Alandkar (2021). Delay Analysis in Infrastructure projects.. Iconic Research And Engineering Journals, 4(12).
Aditya M. Mahajan, Dr. Pratibha. Alandkar "Delay Analysis in Infrastructure projects." Iconic Research And Engineering Journals, vol. 4, no. 12, Jun. 2021.
@article{1702774,
      author = {Aditya M. Mahajan, Dr. Pratibha. Alandkar},
      title = {Delay Analysis in Infrastructure projects.},
      journal = {Iconic Research And Engineering Journals},
      year = {2021},
      volume = {4},
      number = {12},
      pages = {78-81},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1702774.pdf},
      abstract = {The construction industry is second largest sector contributing to economy after agriculture. India?s population growth and economic growth requires improved transport infrastructure including roads, railways, aviation and waterways. There is problem of delay in such projects not only in India but its worldwide phenomenon. Delays causes time lag as well as cost overrun which is not affordable in developing economy as it has limited resources. To avoid such delays different factors causing delay should be identified and analyzed.  This report discuss delay in infrastructure projects considering various factors causing delay. A questionnaire was prepared considering various factors causing delay and sent to various experts and people with experience in infrastructure industry for ranking of various factors. This data was used to analyze various factors causing delay},
      keywords = {Delay, tender, schedule ,infrastructure},
      month = {June},
  }