Proposed 5MVA 69/13.2 kV Substation for the State University in Bacolor, Pampanga.
Subject area: Science,Engineering and Technology · Area of research: Electrical Engineering
Abstract
The study of a proposed 5MVA 69/13.2 kV substation for the state university in Bacolor, Pampanga. The distribution system is very essential to the community. It is the consumer?s major source of energy. The state university is subordinate to the community?s local electric utility. The institution will be self-sufficient and able to significantly reduce power outages at the state university by owning its own substation. This research study?s goal is to proposed a substation for Don Honorio Ventura State University?s (DHVSU) main campus. The researchers designed a radial type substation that has components of metering equipment, current transformer, potential transformer, lightning arrestor, disconnect switch, circuit breaker (SF6), 5MVA power transformer, recloser, feeder, and etc. The total cost of a 5 MVA 69/13.2 kV substation is Php.35,160,370.00. The researchers calculated that, the 5MVA 69/13.2 kV substation, will reach full load in 17 years, based on data collected on the state university electric usage from 2016 to 2019. Based on the first (1) comparison calculation of the researcher for the return of investment (ROI), it is shown that it will take 12 years to achieve the return of investment (ROI). For the second (2) comparison computation, the researchers consider the future 17 years of annual electric consumption, annual electric bills in PELCO II and the annual electric bills in NGCP. As a result, the DHVSU will begin to see a return on its investment (ROI) in the substation in 8 years? time, as well as lower electric bills and begin to make a profit on its investment.
References
[1] Kokorus, M., Eyrich, W., & Zacharias, R. (2016, May). Innovative approach to the substation design using building information modeling (BIM) technology. In 2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D) (pp. 1-5). IEEE. Retrieved from: October, 202.
[2] Roquios, J. R. E. S. (2007). A proposed intervention to improve the power quality and system efficiency of Calinog substation feeder 2. Retrieved from: October, 2022.
[3] Manalo, P. C. (2010). Analysis of Angeles Power Incorporated/Angeles Electric Corporation Subtransmission System Reconfiguration Using ETAP Software. Retrieved from: December, 2021.
[4] Holand, A. (2018). Calculating for kVA in Single and Three Phase Transformers. Retrieved from:
[5] Ilagan, E. K. M. (2013, April). Evaluation of the proposal for the existing power transformers in the National Grid Corporation of the Philippines Binan Substation. Retrieved from: February, 2022.
[6] Daware, K. (2018, February). Radial, parallel, Ring Main and interconnected distribution systems. electricaleasy.com. Retrieved from: June, 2022.
[7] Victoria, B. C. (2002, January 15). University of Santo Tomas energizes New Substation with Power Measurement. University of Santo Tomas Energizes New Substation with Power Measurement. Retrieved from: June, 2022.
[8] NGCP, (2021, December 2). Rates for December 2021 billing period NGCP. Retrieved June, 2021.
[9] DIY AUDIO PROJECTS, (2013, February 24). Ohm's Law and OHMS Law Calculator. Retrieved June, 2022.
[10] Edvard, (2017, March 3). Voltage drop calculation methods with examples explained in details. Retrieved June, 2022.
[11] Monash. (2022, June 9). Growth and Decay. AMSI. Retrieved June 13, 2022.
How to cite this paper
@article{1703544,
author = {Vince Andrei I. Cuenco, Robert James C. Baluyut, Karl Anzel L. De Jesus, John Joshua B. Maglaqui, Alma L. Tangcuangco; Russel John M. Torres},
title = {Proposed 5MVA 69/13.2 kV Substation for the State University in Bacolor, Pampanga.},
journal = {Iconic Research And Engineering Journals},
year = {2022},
volume = {5},
number = {12},
pages = {173-180},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1703544.pdf},
abstract = {The study of a proposed 5MVA 69/13.2 kV substation for the state university in Bacolor, Pampanga. The distribution system is very essential to the community. It is the consumer?s major source of energy. The state university is subordinate to the community?s local electric utility. The institution will be self-sufficient and able to significantly reduce power outages at the state university by owning its own substation. This research study?s goal is to proposed a substation for Don Honorio Ventura State University?s (DHVSU) main campus. The researchers designed a radial type substation that has components of metering equipment, current transformer, potential transformer, lightning arrestor, disconnect switch, circuit breaker (SF6), 5MVA power transformer, recloser, feeder, and etc. The total cost of a 5 MVA 69/13.2 kV substation is Php.35,160,370.00. The researchers calculated that, the 5MVA 69/13.2 kV substation, will reach full load in 17 years, based on data collected on the state university electric usage from 2016 to 2019. Based on the first (1) comparison calculation of the researcher for the return of investment (ROI), it is shown that it will take 12 years to achieve the return of investment (ROI). For the second (2) comparison computation, the researchers consider the future 17 years of annual electric consumption, annual electric bills in PELCO II and the annual electric bills in NGCP. As a result, the DHVSU will begin to see a return on its investment (ROI) in the substation in 8 years? time, as well as lower electric bills and begin to make a profit on its investment.},
month = {June},
}