Abstract

Choosing the right contractor is crucial for the success of Engineering, Procurement, and Construction (EPC) and Design-Build (DB) projects. Various factors should be considered to ensure that the best contractor is selected, such as the contractor's technical proficiency, expertise, financial stability, safety record, and overall reputation. The project's complexity and budgetary restrictions should also be taken into account. To achieve a fair and equitable selection process, the contractor's credentials should be reviewed against the project's specifications in a methodical and transparent manner. In this study, the factors influencing contractor selection in construction projects in India were analysed using interpretative structural modelling (ISM). Additionally, MICMAC analysis is utilized to distinguish between "driving factors" and "dependent factors." The ISM model indicated that financial stability, performance on works (quality), current projects in hand, and lowest bidder are the top criteria to consider while selecting contractors for DB/EPC projects. Joint venture/single point of responsibility was identified as a factor that influences but is not influenced by other factors. The middle-level factors were transitional because they both influence and are affected by other factors. However, these results are based on expert judgments, which may introduce biases. Overall, this study provides valuable insights into the factors influencing contractor selection in construction projects in India, which can aid decision-makers in the selection process.

Keywords

Contractor Selection; Engineering procurement & construction; Design-Build; Selection criteria; Prequalification Criteria

References

[1] Al-Reshaid, K., & Kartam, N. (2005). Design– build pre-qualification and tendering approach for public projects. International Journal of Project Management, 23(4), 309-320.

[2] Bonyani, A., & Alimohammadlou, M. (2020). A new approach for evaluating international EPC contractors in Iran’s energy sector. International journal of construction management, 20(7), 775- 782.

[3] Balon, V., Sharma, A. K., & Barua, M. K. (2016). Assessment of barriers in green supply chain management using ISM: A case study of the automobile industry in India. Global Business Review, 17(1), 116-135.

[4] Calahorra-Jimenez, M., Molenaar, K., Torres- Machi, C., Chamorro, A., & Alarcón, L. F. (2020). Structured approach for best-value evaluation criteria: US design–build highway procurement. Journal of Management in Engineering, 36(6), 04020086.

[5] Calahorra-Jimenez, M., Torres-Machi, C., Chamorro, A., Alarcón, L. F., & Molenaar, K. (2021). Importance of Noncost criteria weighing in best-value design–build US highway projects. Journal of Management in Engineering, 37(4), 04021027.

[6] El Asmar, M., Lotfallah, W., Whited, G., & Hanna, A. S. (2010). Quantitative methods for design- build team selection. Journal of Construction Engineering and Management, 136(8), 904-912.

[7] Ernzen, J., & Vogelsang, K. (2001). Evaluating design-build procurement documents for highway projects: How good are they? Transportation research record, 1761(1), 148- 158.

[8] El Wardani, M. A., Messner, J. I., & Horman, M. J. (2006). Comparing procurement methods for design-build projects. Journal of construction engineering and management, 132(3), 230-238.

[9] Goel, A. (2016). Understanding pre-qualification preferences of public clients in traditional and design-build procurement systems. International Journal of Procurement Management, 9(6), 684- 700.

[10] Gransberg, D. D., & Senadheera, S. P. (1999). Design-build contract award methods for transportation projects. Journal of Transportation Engineering, 125(6), 565-567.

[11] Gransberg, D. D., & Gad, G. M. (2014). Geotechnical Requirements in the Design–Build Selection Process. Transportation Research Record, 2408(1), 26-33.

[12] Leśniak, A., Plebankiewicz, E., & Zima, K. (2012). Design and build procurement system– contractor selection. Archives of Civil Engineering, 58(4), 463-476.

[13] Migliaccio, G. C., Gibson, G. E., & O’connor, J. T. (2009). Procurement of design-build services: Two-phase selection for highway projects. Journal of management in engineering, 25(1), 29- 39.

[14] Molenaar, K. R., & Gransberg, D. D. (2001). Design-builder selection for small highway projects. Journal of Management in Engineering, 17(4), 214-223.

[15] Martin, H., & Ramjarrie, K. (2021). Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4), 04021020.

[16] Moran, R. M., Odeh, I., & Ashuri, B. (2022). Key Challenges in Megabridge Design–Build Project Procurement. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 14(1), 04521039.

[17] Noorzai, E. (2020). Performance analysis of alternative contracting methods for highway construction projects: Case study for Iran. Journal of Infrastructure Systems, 26(2), 04020003.

[18] Phipps, A. R. (2000). Maine builds longest-span precast segmental bridge with unique design- build selection process. Transportation research record, 1696(1), 71-75.

[19] Palaneeswaran, E., & Kumaraswamy, M. M. (2005). Web-based client advisory decision support system for design–builder prequalification. Journal of Computing in Civil Engineering, 19(1), 69- 82.

[20] Palaneeswaran, E., & Kumaraswamy, M. M. (2001). Reinforcing design-build contractor selection: A Hong Kong Perspective. HKIE Transactions, 8(1), 7-12.

[21] Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor selection for design/build projects. Journal of construction engineering and management, 126(5), 331-339.

[22] Paek, J. H., Lee, Y. W., & Napier, T. R. (1992). Selection of design/build proposal using fuzzy- logic system. Journal of Construction Engineering and Management, 118(2), 303-317.

[23] Park, M. J., Lee, E. B., Lee, S. Y., & Kim, J. H. (2021). A digitalized design risk analysis tool with machine-learning algorithm for EPC contractor’s technical specifications assessment on bidding. Energies, 14(18), 5901.

[24] Potter, K. J., & Sanvido, V. (1994). Design/build prequalification system. Journal of Management in Engineering, 10(2), 48-56.

[25] Potter, K. J., & Sanvido, V. (1994). Design/build prequalification system. Journal of Management in Engineering, 10(2), 48-56.

[26] Sagvekar, S., & Wayal, A. S. (2019). Early contractor involvement (ECI): Indian scenario of construction project delivery. Int. J. Sci. Technol. Res, 8, 807-811.

[27] Shalwani, A., Lines, B. C., & Smithwick, J. B. (2019). Differentiation of evaluation criteria in design-build and construction manager at risk procurements. Journal of Management in Engineering, 35(5), 04019017.

[28] Xia, B., Chan, A., Zuo, J., & Molenaar, K. (2013). Analysis of selection criteria for design-builders through the analysis of requests for proposal. Journal of Management in Engineering, 29(1), 19- 24.

[29] Xia, B., & Chan, A. P. (2012). Identification of selection criteria for operational variations of the design-build system: A Delphi study in China. Journal of civil engineering and management, 18(2), 173-183.

[30] Xia, B., Chen, Q., Xu, Y., Li, M., & Jin, X. (2015). Design-build contractor selection for public sustainable buildings. Journal of management in engineering, 31(5), 04014070.

[31] Xia, B., Skitmore, M., & Zuo, J. (2012). Evaluation of design-builder qualifications through the analysis of requests for qualifications. Journal of Management in Engineering, 28(3), 348-351.

How to cite this paper

Gaurav Suhas Nalamwar, Prof. Ashish Pruthviraj Waghmare "A Review on Key Contractor selection criteria for DB-EPC Projects" Iconic Research And Engineering Journals Volume 7 Issue 7 2024 Page 534-544
Gaurav Suhas Nalamwar, Prof. Ashish Pruthviraj Waghmare "A Review on Key Contractor selection criteria for DB-EPC Projects" Iconic Research And Engineering Journals, vol. 7, no. 7, Jan. 2024
Gaurav Suhas Nalamwar, Prof. Ashish Pruthviraj Waghmare (2024). A Review on Key Contractor selection criteria for DB-EPC Projects. Iconic Research And Engineering Journals, 7(7).
Gaurav Suhas Nalamwar, Prof. Ashish Pruthviraj Waghmare "A Review on Key Contractor selection criteria for DB-EPC Projects" Iconic Research And Engineering Journals, vol. 7, no. 7, Jan. 2024.
@article{1705393,
      author = {Gaurav Suhas Nalamwar, Prof. Ashish Pruthviraj Waghmare},
      title = {A Review on Key Contractor selection criteria for DB-EPC Projects},
      journal = {Iconic Research And Engineering Journals},
      year = {2024},
      volume = {7},
      number = {7},
      pages = {534-544},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1705393.pdf},
      abstract = {Choosing the right contractor is crucial for the success of Engineering, Procurement, and Construction (EPC) and Design-Build (DB) projects. Various factors should be considered to ensure that the best contractor is selected, such as the contractor's technical proficiency, expertise, financial stability, safety record, and overall reputation. The project's complexity and budgetary restrictions should also be taken into account. To achieve a fair and equitable selection process, the contractor's credentials should be reviewed against the project's specifications in a methodical and transparent manner. In this study, the factors influencing contractor selection in construction projects in India were analysed using interpretative structural modelling (ISM). Additionally, MICMAC analysis is utilized to distinguish between "driving factors" and "dependent factors." The ISM model indicated that financial stability, performance on works (quality), current projects in hand, and lowest bidder are the top criteria to consider while selecting contractors for DB/EPC projects. Joint venture/single point of responsibility was identified as a factor that influences but is not influenced by other factors. The middle-level factors were transitional because they both influence and are affected by other factors. However, these results are based on expert judgments, which may introduce biases. Overall, this study provides valuable insights into the factors influencing contractor selection in construction projects in India, which can aid decision-makers in the selection process.},
      keywords = {Contractor Selection; Engineering procurement & construction; Design-Build; Selection criteria; Prequalification Criteria},
      month = {January},
  }