International Peer-Reviewed Journal•Open Access•ISSN 2456-8880
irejournals@gmail.com•+91-7433024337

Home / Current Issue / Paper 1706095

1706095 Vol 8 · Issue 1 Download Paper

Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study

Serrano, Jarred Dave D. Florencondia, Noel Aduna, Jeric R.

Subject area: Science,Engineering and Technology  ·  Area of research: Construction Project Scheduling

Abstract

This case study examines the implementation of a Bar Chart and S-Curve feature within a mobile app used by the Department of Public Works and Highways (DPWH), Nueva Ecija 1st District Engineering Office, aimed at enhancing project scheduling and management. Employing a qualitative approach, the study involved surveys, interviews, and observations with key participants to gather comprehensive data on the feature?s usability and effectiveness. Results indicate that the feature significantly improved scheduling efficiency, reduced project delays, and enhanced coordination among project stakeholders. However, challenges such as usability issues and the need for further training were identified, suggesting areas for improvement. This study underscores the potential of digital tools in transforming public sector project management and provides insights into the benefits and barriers of technology adoption in governmental settings.

Keywords

Digital transformation; Project scheduling; Mobile app; Public sector management; Construction efficiency

References

[1] AEC. (2021, February 9). Why is Construction Scheduling Important? Retrieved from https://www.aeccm.com/2021/02/09/why-is-construction-scheduling-important/

[2] Bousdekis, A., & Kardaras, D. (2020). Digital transformation of local government: A case study from Greece. 2020 IEEE 22nd Conference on Business Informatics (CBI).

[3] Retrieved from https://sci-hub.se/10.1109/CBI49978.2020.10070

[4] Digital Twinning in Construction: Ezhou Huahu International Airport. Bentley Systems.

[5] Retrieved from https://www.airportsinternational.com/article/case-study-digital-twinning-construction

[6] Enhanced Production Planning and Scheduling Method for Construction Projects. Purdue University.

[7] Retrieved from https://hammer.purdue.edu/articles/thesis/ENHANCED_PRODUCTION_PLANNING_AND_SCHEDULING_METHOD_FOR_CONSTRUCTION_PROJECTS/20233755

[8] Jeong, H. (2018). The study on the effectiveness of mobile application as a tool for policy PR. Journal of Public Relations and Advertising, 11(3), 4-20. Retrieved from https://dx.doi.org/10.21331/jprapr.2018.11.3.004

[9] The Constructor. (n.d.). Importance of Scheduling in Construction Projects. Retrieved from

[10] https://theconstructor.org/construction/const-management/importance-scheduling-construction-projects/1710/#google_vignette

How to cite this paper

Serrano, Jarred Dave D., Florencondia, Noel, Aduna, Jeric R. "Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study" Iconic Research And Engineering Journals Volume 8 Issue 1 2024 Page 475-479
Serrano, Jarred Dave D., Florencondia, Noel, Aduna, Jeric R. "Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study" Iconic Research And Engineering Journals, vol. 8, no. 1, Jul. 2024
Serrano, Jarred Dave D., Florencondia, Noel, Aduna, Jeric R. (2024). Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study. Iconic Research And Engineering Journals, 8(1).
Serrano, Jarred Dave D., Florencondia, Noel, Aduna, Jeric R. "Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study" Iconic Research And Engineering Journals, vol. 8, no. 1, Jul. 2024.
@article{1706095,
      author = {Serrano, Jarred Dave D., Florencondia, Noel, Aduna, Jeric R.},
      title = {Optimizing Project Scheduling with Bar Chart and S-Curve: A Mobile App Case Study},
      journal = {Iconic Research And Engineering Journals},
      year = {2024},
      volume = {8},
      number = {1},
      pages = {475-479},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1706095.pdf},
      abstract = {This case study examines the implementation of a Bar Chart and S-Curve feature within a mobile app used by the Department of Public Works and Highways (DPWH), Nueva Ecija 1st District Engineering Office, aimed at enhancing project scheduling and management. Employing a qualitative approach, the study involved surveys, interviews, and observations with key participants to gather comprehensive data on the feature?s usability and effectiveness. Results indicate that the feature significantly improved scheduling efficiency, reduced project delays, and enhanced coordination among project stakeholders. However, challenges such as usability issues and the need for further training were identified, suggesting areas for improvement. This study underscores the potential of digital tools in transforming public sector project management and provides insights into the benefits and barriers of technology adoption in governmental settings.},
      keywords = {Digital transformation; Project scheduling; Mobile app; Public sector management; Construction efficiency},
      month = {July},
  }