Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria

Onyia Chukwuebuka Genevieve Oluchukwu Onye Olisa Jerome

Subject area: Science,Engineering and Technology  ·  Area of research: Construction Management

Abstract

Construction projects are the major things that contribute to the socio-economic growth of any country in the world and for a country to be developed there must be a lot of construction projects in the country which include the construction of roads, schools, hospitals, bridges, etc. The construction industry in both developed and developing countries is viewed as the sector of the economy which planning, design, construction, maintenance, repair and operation transforms various resources into constructed facilities. The research aims to identify common causes of delays, determine their effect on construction costs, and evaluate the factors leading to cost overruns. This study seeks to examine the impact of delays and disruptions on public building projects costs between 2020 and 2023, revealing significant cost overruns and compromised project quality while assessing the effectiveness of good project management and monitoring to curb delay and disruptions. A mixed-method research design was employed, combining quantitative data from structured questionnaires and qualitative insights from interviews and project reports from Framework LTD, whose public projects were impacted by delays from 2020 to 2023. The findings reveal that poor project planning, financial constraints, design variations, project complexity and material shortages are the major contributors to delays and disruptions. Statistical analysis confirmed a positive correlation between project delays and increased construction costs, with cost overruns ranging from 15.6% to 21.7%. To mitigate these impacts, the study recommends improving project management, addressing financial and regulatory bottlenecks, adopting modern technologies such as Building Information Modeling (BIM), stabilizing material prices, and fostering continuous learning from past projects. This research contributes to the body of knowledge in construction management and serves as a valuable resource for stakeholders, including contractors, project managers, clients etc. in enhancing project delivery efficiency and effectiveness.

Keywords

Construction, Design, Building Information Modeling

References

[1] Abdullah, R., Razali, M. S., & Hosni, N. A. (2015). Determinants of construction delay: A conceptual framework. Procedia Engineering, 125, 978-985. https://doi.org/10.1016/j.proeng.2015.11.163

[2] Afolabi, A. O., Fagbenle, O. I., Oluwunmi, A. O., & Oloyede, S. A. (2013). Causes and effects of construction cost overruns: A review and proposed remedies. Journal of Construction Project Management and Innovation, 3(2), 585-604. https://doi.org/10.4324/9781315711618-7

[3] Agyekum, K., & Boateng, A. (2023). The impact of IoT and AI on material and equipment management in construction. International Journal of Construction Management, 25(4), 215-229. https://doi.org/10.1080/15623599.2022.2070832

[4] Alaghbari, W., Kadir, M. R. A., Salim, A., & Ernawati, R. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/09699980710731308

[5] Ameh, O. J. (2022). Effects of construction project delays in developing countries: A case study of Nigeria. Journal of Construction Engineering and Management, 148(4), 04022010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002172

[6] American Society of Civil Engineers (ASCE). (2023). Communication in construction: Best practices for success. ASCE. https://doi.org/10.1061/9780784413821

[7] Associated General Contractors of America (AGC). (2023). 2023 construction inflation alert. https://www.agc.org/sites/default/files/Inflation%20Alert%20-%20March%202023.pdf

[8] Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. https://doi.org/10.1016/j.ijproman.2005.11.010

[9] Bentile, J. A. (2021). Managing construction delays in the 21st century: Key strategies for project managers. Journal of Project Management Research, 19(2), 140-160. https://doi.org/10.1146/PM-2021-004

[10] Chan, A. P., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55-63. https://doi.org/10.1016/S0263-7863(96)00039-7

[11] Cheung, S. O., & Pang, K. H. (2022). Enhancing construction payment practices: Milestone payment systems. Journal of Financial Management of Property and Construction. https://doi.org/10.1108/JFMPC-02-2022-0021

[12] Chileshe, N., Rameezdeen, R., Hosseini, M. R., & Lehmann, S. (2012). An analysis of the causes of delays and cost overruns in infrastructure delivery in Queensland. Journal of Construction Engineering and Management, 139(4), 437-448. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000574

[13] Construction Industry Institute (CII). (2023). Digital transformation in construction: Streamlining administrative processes. https://www.construction-institute.org/resources/knowledgebase

[14] Deloitte. (2023). Construction industry outlook: Tackling the challenges of cost overruns. https://www2.deloitte.com/global/en/pages/energy-and-resources/articles/construction-industry-outlook.html

[15] Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004

[16] Donaldson, L. (2021). The contingency theory of organizations. Sage Publications. https://doi.org/10.4135/9781506335944

[17] El-Sayegh, S. M., & Mansour, M. (2023). Managing disputes and claims during project closure: Lessons from large-scale construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 15(3), 05023015. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000456

[18] Eze, C. I., Nwoha, C., & Madu, I. A. (2022). Impact of material shortages on project delays in Enugu State, Nigeria. Nigerian Journal of Construction Technology and Management. https://doi.org/10.1108/NJCTM-02-2022-0010

How to cite this paper

Onyia Chukwuebuka, Genevieve Oluchukwu, Onye Olisa Jerome "Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria" Iconic Research And Engineering Journals Volume 8 Issue 8 2025 Page 316-325
Onyia Chukwuebuka, Genevieve Oluchukwu, Onye Olisa Jerome "Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria" Iconic Research And Engineering Journals, vol. 8, no. 8, Feb. 2025
Onyia Chukwuebuka, Genevieve Oluchukwu, Onye Olisa Jerome (2025). Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria. Iconic Research And Engineering Journals, 8(8).
Onyia Chukwuebuka, Genevieve Oluchukwu, Onye Olisa Jerome "Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria" Iconic Research And Engineering Journals, vol. 8, no. 8, Feb. 2025.
@article{1707117,
      author = {Onyia Chukwuebuka, Genevieve Oluchukwu, Onye Olisa Jerome},
      title = {Assessing The Impact of Delay and Disruptions on Public Building Projects Costs in Enugu North, Enugu State, Nigeria},
      journal = {Iconic Research And Engineering Journals},
      year = {2025},
      volume = {8},
      number = {8},
      pages = {316-325},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1707117.pdf},
      abstract = {Construction projects are the major things that contribute to the socio-economic growth of any country in the world and for a country to be developed there must be a lot of construction projects in the country which include the construction of roads, schools, hospitals, bridges, etc. The construction industry in both developed and developing countries is viewed as the sector of the economy which planning, design, construction, maintenance, repair and operation transforms various resources into constructed facilities. The research aims to identify common causes of delays, determine their effect on construction costs, and evaluate the factors leading to cost overruns. This study seeks to examine the impact of delays and disruptions on public building projects costs between 2020 and 2023, revealing significant cost overruns and compromised project quality while assessing the effectiveness of good project management and monitoring to curb delay and disruptions. A mixed-method research design was employed, combining quantitative data from structured questionnaires and qualitative insights from interviews and project reports from Framework LTD, whose public projects were impacted by delays from 2020 to 2023. The findings reveal that poor project planning, financial constraints, design variations, project complexity and material shortages are the major contributors to delays and disruptions. Statistical analysis confirmed a positive correlation between project delays and increased construction costs, with cost overruns ranging from 15.6% to 21.7%. To mitigate these impacts, the study recommends improving project management, addressing financial and regulatory bottlenecks, adopting modern technologies such as Building Information Modeling (BIM), stabilizing material prices, and fostering continuous learning from past projects. This research contributes to the body of knowledge in construction management and serves as a valuable resource for stakeholders, including contractors, project managers, clients etc. in enhancing project delivery efficiency and effectiveness.},
      keywords = {Construction, Design, Building Information Modeling},
      month = {February},
  }