Review Paper on Stakeholder Identification and Analysis in Construction Industry: A Strategic Approach
Subject area: Science,Engineering and Technology · Area of research: Civil Engineering
Abstract
Construction is carried out in highly demanding and complicated build environments where projects carried out by coalitions of numerous stakeholders with varying interests, objectives and socio-cultural background. Although stakeholder management recognised as a means of increasing the propensity for successful delivery of construction projects, its full potential has yet to be realised. Previous research has shown that the existing frameworks focus on the overall stakeholder management process or their corresponding challenges and lack s detailed process for stakeholder identification and analysis. Stakeholder management begins with stakeholder identification and builds on stakeholder analysis. Therefore, this study aims to develop a conceptual framework for stakeholder identification and analysis in construction projects in order to enhance the stakeholder management process. A comprehensive study is carried out on prior works on stakeholder management to achieve the aim. Current practices of stakeholder identification, classification and analysis methods; knowledge assets referred; factors taken into account for stakeholder identification and analysis are investigated using semi-structured interviews and questionnaire surveys. After data analysis, it is found that brainstorming in group meetings, stakeholder role classification and Stakeholder Salience Model are the preferred methods for stakeholder identification, classification and analysis respectively.
Keywords
Stakeholder management, Stakeholder identification, Stakeholder Analysis, Success factors, Knowledge Assets, Framework.
References
[1] Aaltonen, K. S. (2009). Response strategies to stakeholder pressures in global projects. International Journal of Project Management, 27(2), 131-141.
[2] Aapaoja, A. a. (2014). A framework for stakeholder identification and classification in construction projects. Journal ofBusiness and Management, 43-55.
[3] Abdu Lawan, G. Z. (2016). Development of Project Governance Framework for Multifarious Infrastructure Projects. PhD Thesis, Ahmadu Bello University.
[4] Atkinson. R. (1999). Project Management; cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342.
[5] Baiden, B. K. (2005). The extent of team integration with construction projects. International Journal of Project Management, 24(1), 13-23. doi:10.1016/j.ijproman.2005.05.001
[6] Ballejoes, L. C. (2008). Method for stakeholder identification in inter-organisational environments, Requirement Engineering. 281-297. doi:10.1007/s00766-008-0069-1
[7] Bourne, L. (2009). Project relationship management and the stakeholder circle. Melbourne: Doctoral Thesis, Graduate school of Business.
[8] Bourne, L. a. (2006). Visualising stakeholder influence - Two Australian Examples. Project Management Journal, 37(1), 5-22.
[9] Chan, P. P. (2004). Key performance indicators for measuring construction success. Benchmarking, An International Journal, 11(2), 203-221.
[10] Chnyio, E. A. (2015). Construction Stakeholder Management. John Wiley and Sons.
[11] Clarkson. (1999). Principles of Stakeholder Management. Centre for Business Ethics (CBE).
[12] Cleland, D. L. (1999). Project Management Strategic Design and Implementation, 4th Edition. McGraw-Hill.
[13] Cleland, D. L. (2002). Project Management: Strategic Design and Implementation, 4th Edition. McGraw-Hill.
[14] Colle, S. D. (2005). A stakeholder management model for ethical decision-making. International Journal of Management and Decision Making.
[15] Ekung, S. B. (2014). Factors influencing construction stakeholders' engagement outcome. International Letters of Natural Sciences, 101-114.
[16] Eyiah-Botwel, E. A. (2015). Critical Barriers Affecting Stakeholder Management in Construction Industry.
[17] Freeman, R. A. (1984). Strategic Management: a stakeholder approach.
[18] Gali Zarewa, A. (2019). Barriers to Effective Stakeholder Management in the Delivery of Multifarious Infrastructure Projects. Journal of Engineering, Project, and Production Management, 9(2), 85-96.
[19] Hammad, S. (2013). Investigating the stakeholder management in Construction Projects in the Gaza Strip. An Msc Thesis, the Islamic University of Gaza.
[20] https://www.pmi.org/learning/library/low-authority-environment-emotional-intelligence-6615. (n.d.).
[21] Ibrahim, a. D. (2006). An Analysis of Success Factors for Public Private Partnerships in Infrastructure Projects in Nigeria. Journal of Construction Procurement, 51-69.
[22] IFC. (2007). Stakeholder Engagement. Retrieved from https://www.ifc.org/wps/wcm/connect/e03df4d4-223d-45d5-9bae-669cb162debd/Appendices.pdf?MOD=AJPERES&CVID=jqeKR1D (
[23] Karlsen, J. T. (2002). Project Stakeholder Management. Engineering Management Journal, 14(4), 19-24.
[24] Loosemore, M. (2000). Crisis Management in Construction Projects: Virginia. American Society of Civil Engineers.
[25] Loosemore, M. (2006). Managing Project Risks in the Management of Complex Projects. Blackwell Publication Ltd.
[26] Mashali, A. E. (2022). Stakeholder management challenges in mega construction projects; Critical Success Factors. Journal of Enginnering, Design and Technology. doi:10.1108/JEDT-09-2021-0483
[27] McElroy, B. a. (2000). Managing Stakeholders, In Gower Handbook of Project Management. (J. R. Simister, Ed.) 757-775.
[28] Mitchell, R. K. (1997). Towards a theory of stakeholder identification and salience: defining the principle of who and what really counts. Academy Management Review, 22(4).
[29] Murray, R. a. (2005). Making Sense of Stakeholder Mapping. Lucidus Consulting Limited.
[30] Okosun, B. O. (2019). Assessment of Factors Affecting Stakeholder Management in Nigeria Construction Projects. Third International Enginnering Conference, 61-64.
[31] Olander, S. a. (2005). Evaluation of stakeholder influence in the implementation of construction projects. International Journal of Project Management, 321-328.
[32] Olatunde, N. A. (2019). Assessment of Stakeholder Management in Construction Projects procured by Private Corporate Organisations in Southwestern Nigeria. PhD Thesis in Quanntity Surveying of Obafemi Awolowo University.
How to cite this paper
@article{1708058,
author = {Hrishikesh Kulkarni, Prof. Gaurav Vispute, Prof Ashish Waghmare},
title = {Review Paper on Stakeholder Identification and Analysis in Construction Industry: A Strategic Approach},
journal = {Iconic Research And Engineering Journals},
year = {2024},
volume = {8},
number = {6},
pages = {1082-1091},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1708058.pdf},
abstract = {Construction is carried out in highly demanding and complicated build environments where projects carried out by coalitions of numerous stakeholders with varying interests, objectives and socio-cultural background. Although stakeholder management recognised as a means of increasing the propensity for successful delivery of construction projects, its full potential has yet to be realised. Previous research has shown that the existing frameworks focus on the overall stakeholder management process or their corresponding challenges and lack s detailed process for stakeholder identification and analysis. Stakeholder management begins with stakeholder identification and builds on stakeholder analysis. Therefore, this study aims to develop a conceptual framework for stakeholder identification and analysis in construction projects in order to enhance the stakeholder management process. A comprehensive study is carried out on prior works on stakeholder management to achieve the aim. Current practices of stakeholder identification, classification and analysis methods; knowledge assets referred; factors taken into account for stakeholder identification and analysis are investigated using semi-structured interviews and questionnaire surveys. After data analysis, it is found that brainstorming in group meetings, stakeholder role classification and Stakeholder Salience Model are the preferred methods for stakeholder identification, classification and analysis respectively.},
keywords = {Stakeholder management, Stakeholder identification, Stakeholder Analysis, Success factors, Knowledge Assets, Framework.},
month = {December},
}