Assessment of the Construction Management Challenges of Mechanical, Electrical/Electronics, Plumbing, Fire Protection and Sanitary (MEPFS) Projects
Subject area: Science,Engineering and Technology · Area of research: Engineering Management
Abstract
The construction field, a cornerstone of human civilization, presents difficult management issues, particularly when it comes to Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) systems. The purpose of this study was to identify and examine the essential factors and challenges in construction management that influence the success of MEPF building projects. The study investigated the major challenges to construction management success and aimed to identify the most effective construction management approaches for increasing production. The findings indicated that precise budget allocation, well-defined and realistic scheduling, and proactive risk management through engaged risk owners are critical. The research also stressed the need of good communication, safety priorities, and regulated scope revisions in reducing project delays and cost overruns. The study indicated that construction management success is dependent on a combination of strategic planning, resource management, communication, risk mitigation, and technology adaptability. Adopting a holistic approach that considers interdependencies between MEPF components, fostering interdisciplinary collaboration, conducting life cycle cost analyses, implementing robust quality assurance measures, establishing performance metrics, proactively managing risks, and investing in continuous training and development are among the recommendations made to construction management firms specializing in MEPF projects. Addressing these crucial areas allows construction businesses to improve project performance, assure stakeholder satisfaction, and contribute to a more sustainable and efficient built environment.
Keywords
Construction Management, Project Management
References
[1] Construction def. 1.a. 1.b. and 1.c. Oxford English Dictionary Second Edition on CD-ROM (v. 4.0) Oxford University Press 2009
[2] https://en.wikipedia.org/wiki/Construction
[3] https://tinyurl.com/Bri-Con
[4] Ladores Jr, C., Estacio, I., Manzon, R. D., & Florencondia, N. (2023). Leadership Styles of Construction Professionals and Their Preferred Labor System In The Philippine Construction Industry. The Quest: Journal of Multidisciplinary Research and Development, 2(3).
[5] A.O. Ogunde*, O. Olaolu, A. Afolabi, J. Owolabi, R. Ojelabi (2016, December), Challenges Confronting Construction Project Management System for Sustainable Construction in Developing Countries (https://core.ac.uk/download/pdf/231750515.pdf)
[6] Shahrabia, M.A. & Mohammadib, H. (2023, June). Investigating different challenges in construction projects.
[7] Tabassi, A.A., Bryde, D.J., Kamal E.M., Dowson J., Michaelides R. (2019). Challenges For Project Management In The 21st Century, https://doi.org/10.15405/epms.2019.12.63
[8] Kopsida, M., Brilakis, I., Vela, P.A. (2015, October). A Review of Automated Construction Progress Monitoring and Inspection Methods https://www.researchgate.net/publication/304013510
[9] Ofori, G. (2000, November). Challenges of construction industries in developing countries: Lessons from various countries. In 2nd International Conference on Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, Gaborone, November (pp. 15-17).
[10] Gonzales, R. C., Abenoja Jr, A. D., Manzon, R. D. S., Pascual, L. E., & Florencondia, N. T. Impact of the Implementation of the Construction Guidelines Practiced Among Industries in Cabanatuan City During Pandemic.
[11] Anasctacio, C. O., Bernardino, K. A. G., Manzon, R. D. S., Pascual, L. E., & Florencondia, N. T. Assessment of Covid-19 Pandemic Impacts on Construction Management: A Case of Local Government Unit-San Jose City, Nueva Ecija, Philippines.
[12] Chin, L.S. (2014, January)
[13] Manuel, R. (2022, December). Factors Affecting Labor Productivity in Construction of Admin and Sub-Contractor Workers.
[14] Valerio, K.P. (2022, December). Assessment of Quality Control System in T One Garden Residence.
[15] Padua, B. D. G., Florencondia, N., & Villar, M. J. Employer Perspectives on Project Management Effectiveness: An Engineering Management Analysis of BSME 2019 Graduates' Contributions to Engineering Projects.
[16] Ignacio, J., Santos, E., Socorro, P., Florencondia, N., Pascual, L., & Subia, G. (2019). Safety Measures and Safety Warning Signages of Road Construction Projects: Ann Assessment. International Journal of Advanced Engineering, Management and Science, 5(8), 500-503.
[17] Anumba, C. J. (2000, January). Integrated systems for construction: Challenges for the millennium. In Proceedings of the International Conference on Construction Information Technology, Hong Kong (Vol. 17, pp. 78-92). Edward Elgar Publishing Ltd.
[18] Hewage, K. N., Ruwanpura, J. Y., & Jergeas, G. F. (2008). IT usage in Alberta's building construction projects: Current status and challenges. Automation in construction, 17(8), 940-947.
[19] Ford, D. N., Lander, D. M., & Voyer, J. J. (2002). A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management & Economics, 20(4), 343-351
[20] “”•¦§½¾ØÙõö É Ê Ë Ì þ I J L ¦ íÙÎÁµÁµÁ©ÁµÁŸµÎ‘ƒ‘ugƒ‘[[Oƒ[hîÍh=°6�OJQJhîÍhc*Ö6�OJQJhîÍh^~ 6�OJQJ]�hîÍhc*Ö6�OJQJ]�hîÍhc*Ö6�H*OJQJhîÍh^~ 6�H*OJQJhÀP1OJPJQJhîÍh^~ H*OJQJhîÍhc*ÖH*OJQJhîÍhc*ÖOJPJQJhîÍh^~ OJQJ'hc*Öhc*Ö5�CJ(OJPJQJmH 4sH 4$hc*Öhc*ÖCJ(OJPJQJmH 4sH 4”• Ê þ J § ù ú û ü ¡¢Ýòåл»»»»¦‘ƒyyy $¤a$gd«5H [Some characters in this reference could not be displayed correctly — please refer to the published PDF for the full reference.]
[21] „ñÿdð¤]„ñÿgd«5H$„ñÿ„ dð¤]„ñÿ^„ a$gd^~ $„ñÿ„ dð¤]„ñÿ^„ a$gd˜g$„ñÿ„ dð¤]„ñÿ^„ a$gdc*Ö$„`„öÿdë¤^„``„öÿa$gd˜g$dð¤a$gd^~ $dݤa$gdc*Ö¦ § © ù ú û ü ünoo ¡¢§©¯±Üñã×ñȹ§“{{c{{{O“O“§9*h«5Hh×oi5�6�CJOJQJaJmH 4sH 4&h«5Hh«5H5�6�CJOJPJQJaJ.h«5Hh«5H5�6�CJOJPJQJaJmH 4sH 4.h«5Hhc*Ö5�6�CJOJPJQJaJmH 4sH 4&h«5Hh^~ 5�6�CJOJPJQJaJ"h«5Hh^~ 5�6�CJOJQJaJhîÍh˜gCJOJQJaJhîÍh^~ CJOJQJaJhîÍhc*Ö6�OJQJhîÍhc*Ö6�H*OJQJhîÍhc*ÖCJOJQJaJÜÝÞêëì÷ø twëQë‚ëdeƒ†‡ˆˆ}~b!c!d!~!…!~#£#¤#J$N$O$êØÈȸ¤�¤¤z¤¤z¤z¤¤¤¤i¤i¤z¤i¤¤¤i¤¤¤¤¤¤¤z¤z¤!h«5HCJOJQJ\�aJmH 4sH 4*h«5Hh×oiCJH*OJQJ\�aJmH 4sH 4'h«5Hhì+CJOJQJ\�aJmH 4sH 4'h«5Hh×oiCJOJQJ\�aJmH 4sH 4h«5Hh×oiCJOJQJ\�aJh«5Hh^~ CJOJQJ\�aJ"h«5Hhì+CJOJQJ\�]�aJ*h«5Hh^~ 6�CJOJQJ\�aJmH 4sH 4)ÝÞëì ‚de‡ˆ}~c!d!…!N$O$** --0ñÜÎñññññññññññññññññññññ [Some characters in this reference could not be displayed correctly — please refer to the published PDF for the full reference.]
How to cite this paper
@article{1708261,
author = {Herbert S. Dayrit, Josephine D. Alberto; Marjorie Ann T. Manalang, Marvin O. Mallari, Ph.D., Noel T. Florencondia, Ph.D., Lorinda E. Pascual, Ph.D.},
title = {Assessment of the Construction Management Challenges of Mechanical, Electrical/Electronics, Plumbing, Fire Protection and Sanitary (MEPFS) Projects},
journal = {Iconic Research And Engineering Journals},
year = {2025},
volume = {8},
number = {11},
pages = {163-174},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1708261.pdf},
abstract = {The construction field, a cornerstone of human civilization, presents difficult management issues, particularly when it comes to Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) systems. The purpose of this study was to identify and examine the essential factors and challenges in construction management that influence the success of MEPF building projects. The study investigated the major challenges to construction management success and aimed to identify the most effective construction management approaches for increasing production. The findings indicated that precise budget allocation, well-defined and realistic scheduling, and proactive risk management through engaged risk owners are critical. The research also stressed the need of good communication, safety priorities, and regulated scope revisions in reducing project delays and cost overruns. The study indicated that construction management success is dependent on a combination of strategic planning, resource management, communication, risk mitigation, and technology adaptability. Adopting a holistic approach that considers interdependencies between MEPF components, fostering interdisciplinary collaboration, conducting life cycle cost analyses, implementing robust quality assurance measures, establishing performance metrics, proactively managing risks, and investing in continuous training and development are among the recommendations made to construction management firms specializing in MEPF projects. Addressing these crucial areas allows construction businesses to improve project performance, assure stakeholder satisfaction, and contribute to a more sustainable and efficient built environment.},
keywords = {Construction Management, Project Management},
month = {May},
}