Comprehensive Investigation of the Factors That Led to the Abandonment of Lalong's Legacy Projects on the Plateau Between 2015 - 2023
Subject area: Physical Sciences and Environment · Area of research: Environment
DOI: 10.64388/IREV9I4-1711210-6599
Abstract
Project abandonment remains a major challenge to infrastructure development in Nigeria, with significant social, economic, and political consequences. In Plateau State, the administration of Governor Simon BakoLalong initiated the Lalong?s Legacy Projects in 2016, comprising 21facilities - nine primary schools, six secondary schools, and six hospitals - across the 17 Local Government Areas. Although the projects were initially scheduled for completion within 32 weeks at a contract sum of ?59 billion (later revised to ?29 billion in 2021), many remained uncompleted by the end ofthe administration in 2023. This study investigated the causes of project abandonment using survey data from 72 respondents drawn from community members,project staff, government officials, and construction professionals. Data analysis through the Relative Importance Index (RII) revealed that client-related factors, particularly poor contract management (RII = 0.8000) and inappropriate procurement methods (RII = 0.7667), were major contributors. Contractor-related factors such as poor site management (RII = 0.8139) and inadequate technical competence (RII = 0.7917) were also significant. Consultant-related issues, including inadequate design and documentation (RII = 0.8500) and poor feasibility studies (RII = 0.8139), highlighted technical weaknesses. External and community-related influences ranked highest overall, with pandemics and health emergencies (RII = 0.8806), insecurity (RII = 0.8389), and economic instability (RII = 0.7944) exerting the greatest impact. The study concludes that sustainable project delivery requires effective governance, improved technical capacity, and resilience against external disruptions. Recommendations are proposed for government, consultants, and contractors to reduce the risk of project abandonment.
Keywords
Financial Mismanagement, Project Abandonment, Procurement Strategy, Poor Contract Management, Plateau State
References
[1] Adebayo, A., & Ojo, J. (2020). Corruption and public project management in Nigeria: A critical analysis. Journal of Public Administration, 12(3), 45–60.
[2] Adeleke,A. Q., Bahaudin,A. Y., & Kamaruddeen,A. M. (2017). Project abandonment in Nigeria: Causes and effects. International Journal of Sustainable Construction Engineering and Technology, 8(2), 71–82.
[3] Adeniyi, O. (2020). COVID-19 and the crisis of governance in Nigeria. Journal ofAfrican Policy Studies, 26(3), 45–59.
[4] Amoatey, C. T., & Anson, B. A. (2017). Investigating the causes of government project failure in Ghana. International Journal of Managing Projects in Business, 10(1), 32–55.
[5] Ayodele, E. O., & Alabi, O. M. (2011). Abandonment of construction projects in Nigeria: Causes and effects. Journal of Emerging Trends in Economics and Management Sciences, 2(2), 142–145.
[6] Chan, D. W. M., & Kumaraswamy, M. M. (2004). Compressing construction durations: Lessons learned from HongKong building projects. International Journal of Project Management, 22(1), 23–35. https://doi.org/10.1016/S0263-7863(03)00012-5
[7] Doloi, H. (2012). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 138(11), 136–145. https://doi.org/10.1061/(ASCE)CO.1943- 7862.0000532
[8] Dosumu,O. S., & Adenuga,O. A. (2013). Causes, effects and remedies of errors in Nigerian construction documents. Organization, Technology and Management in Construction, 5(1), 676–686.
[9] Ebekozien,A., Uwadia, F., & Usman, D. M. (2015). The impact of design errors and incomplete drawings on construction project delivery in Nigeria. Proceedings of the Academic Conference of African Scholar Publications & Research International on Sub- Sahara African Transformation and National Development, 7(1).
[10] Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6– 19.
[11] Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). John Wiley & Sons.
[12] Kharabsheh, R. (2018). Legal challenges in public project implementation: A case study of Jordan. International Journal of Project Management, 36(5), 745–757.
[13] Krishnapriya,A. (2023). Poor contract management: Risks, impacts, and remedies. [Blog post].
[14] Igwesi, C. G., Kalu,A. U., Onyejiaku, C. C., & Ghasi,N. C. (2019). Appraisal of the impact of project abandonment on Nigerian economy: With illustrations from the Nigerian Railway Corporation. International Journal of Management and Commerce Innovations, 6(2), 394–404.
[15] Independent. (2021, March 2). Plateau: Lalong launches N59 billion legacy projects. Independent Nigeria. https://independent.ng
[16] Ishaq, I. (2025). Understanding the causes and consequences of abandoned government projects: Insights from community perspectives. Journal of Humanities and Social Policy, 11(3), 137–154.
[17] Leadership. (2021, February 28). Plateau State governor flags off 21 legacy projects. Leadership Nigeria. https://leadership.ng
[18] Memon,A. H., Rahman,I. A., & Azis,A. A. A. (2011). Preliminary study on causative factors leading to construction cost overrun. International Journal of Sustainable Construction Engineering and Technology, 2(1), 57–71.
[19] Miri, T. N. (2015). An evaluation of delay and cost overrun on the Jos Airport upgrading projects (Unpublished master’s thesis). Department of Building, University of Jos.
[20] Nwankwo, C., Okafor, E., & Uche, I. (2021). Stakeholder engagement in public projects: Lessons from Nigeria. African Journal of Public Administration, 10(1), 23–34.
[21] Ofori, G. (2015). Nature of the construction industry, its needs and its development: A review of four decades of research. Journal of Construction in Developing Countries, 20(2), 115–135. https://doi.org/10.21315/jcdc2015.20.2.6
[22] Ojo, S., & Gbadebo,A. (2019). Public procurement and project abandonment in Nigeria. African Journal ofManagement Research, 13(1), 102–116.
[23] Olawale,Y., & Sun,M. (2015). Construction project management in Nigeria: Causes and solutions to delay. Journal of Construction in Developing Countries, 20(1), 1–17.
[24] Osei-Tutu, E., Agyekum, K., & Asante, M. (2019). Bureaucratic inefficiencies and project delays in Ghana: A qualitative analysis. International Journal of Public Sector Management, 32(4), 345–362.
[25] PM News. (2021, March 1). Plateau begins N59bn legacy projects. PM News Nigeria. https://pmnewsnigeria.com
[26] Sebghatullah, K., Zabihullah, Z., & Mohammad, I. S. (2020). Excessive bureaucracy in construction projects: Causes of low competition and lengthy tendering. International Journal of Engineering and Advanced Technology, 10(1), 66–70.
[27] Solar Veritas Limited. (2025). The role of financial management in successful project execution.
[28] The Nation. (2021, March 2). Plateau flags offN59bn legacy projects. The Nation Nigeria. https://thenationonlineng.net
How to cite this paper
@article{1711210,
author = {Miri, Timnan Nyantau, Godfrey Mangshin Mohorshin, Goar, Paul Ishaku},
title = {Comprehensive Investigation of the Factors That Led to the Abandonment of Lalong's Legacy Projects on the Plateau Between 2015 - 2023},
journal = {Iconic Research And Engineering Journals},
year = {2025},
volume = {9},
number = {4},
pages = {496-506},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1711210.pdf},
abstract = {Project abandonment remains a major challenge to infrastructure development in Nigeria, with significant social, economic, and political consequences. In Plateau State, the administration of Governor Simon BakoLalong initiated the Lalong?s Legacy Projects in 2016, comprising 21facilities - nine primary schools, six secondary schools, and six hospitals - across the 17 Local Government Areas. Although the projects were initially scheduled for completion within 32 weeks at a contract sum of ?59 billion (later revised to ?29 billion in 2021), many remained uncompleted by the end ofthe administration in 2023. This study investigated the causes of project abandonment using survey data from 72 respondents drawn from community members,project staff, government officials, and construction professionals. Data analysis through the Relative Importance Index (RII) revealed that client-related factors, particularly poor contract management (RII = 0.8000) and inappropriate procurement methods (RII = 0.7667), were major contributors. Contractor-related factors such as poor site management (RII = 0.8139) and inadequate technical competence (RII = 0.7917) were also significant. Consultant-related issues, including inadequate design and documentation (RII = 0.8500) and poor feasibility studies (RII = 0.8139), highlighted technical weaknesses. External and community-related influences ranked highest overall, with pandemics and health emergencies (RII = 0.8806), insecurity (RII = 0.8389), and economic instability (RII = 0.7944) exerting the greatest impact. The study concludes that sustainable project delivery requires effective governance, improved technical capacity, and resilience against external disruptions. Recommendations are proposed for government, consultants, and contractors to reduce the risk of project abandonment.},
keywords = {Financial Mismanagement, Project Abandonment, Procurement Strategy, Poor Contract Management, Plateau State},
month = {October},
doi = {https://doi.org/10.64388/IREV9I4-1711210-6599}
}