Home / Current Issue / Paper 1713859
Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model
Subject area: Management and Commerce · Area of research: Public-Private Partnerships in Infrastructure
DOI: https://doi.org/10.64388/IREV9I7-1713859
Abstract
This study aims to evaluate the role of Public-Private Partnerships (PPPs) in the development and management of the Gurara Water Transfer Project (GWTP), with a particular focus on the effectiveness of the PPP model in supporting sustainable dam management and addressing socio-economic impacts. The methodology employed is a qualitative, secondary data analysis of government reports, project documentation, in-depth interview of major stakeholders associated with the project. The study specifically examines the operational efficiency of the water transfer system, the long delay in the takeoff of the hydropower generation, the socio-economic consequences for displaced communities, and the governance and security challenges affecting the project. The findings reveal that while the PPP framework facilitated private sector involvement in the project, operational inefficiencies, delays in infrastructure completion and security challenges in the project area hindered the achievement of its full potential. The non-completion of the hydropower retrofitting works have also been significant barriers. In conclusion, the study highlights the need for improved governance, better stakeholder engagement, and stronger risk management strategies to optimize PPP outcomes in future large-scale infrastructure projects. It recommends enhancing transparency, inclusivity, and environmental management to ensure that such projects contribute effectively to sustainable development goals.
Keywords
Public-Private Partnerships; Sustainable Dam Management; Gurara Water Transfer Project; Socio-economic Impact; Infrastructure Development
References
[1] Adamu, B., & Yusuf, A. (2019). “Dam-Induced Displacement and Its Socio-Economic Effects in Nigeria: Evidence from the Kainji Dam.” Nigerian Journal of Development Studies, 5(1), 32-47.
[2] Adewale, A., & Bello, M. (2023). Security Challenges in Nigeria's Infrastructure Projects: The Case of Gurara Dam. Nigerian Journal of Infrastructure and Security, 15(2), 45-61.
[3] African Development Bank (2021). The Role of Dams in Sustainable Development. AfDB.
[4] Aliyu, M., & Bose, E. (2022). Effect of Dadin-kowa dam on rural development in Yamaltu Deba Local Government Area of Gombe State. African Social Review, 8(3), 112-129.
[5] Aminu, R., Oladimeji, Y. U., Magaji, B. D., Owolabi, M. A., Aminu, Z., & Galadima, S. (2025). Double-edge effects of small-scale irrigation on small-holder vegetable farmers’ income in Gurara dam, Nigeria. ADAN Journal of Agriculture, 6(1), 226. https://doi.org/10.36108/adanja/5202.60.0102
[6] Bello, A. D., Argungu, A. S., Dinki, A. T. S., Yahaya, A., Sulaiman, K., Salaudeen, A., & Abdullahi, N. (2024). Dam break study and its flood risk in Gurara watershed-Nigeria under varied spatio-temporal conditions by integrating HSPF and HEC–RAS models. Environmental Earth Sciences, 83(4). https://doi.org/10.1007/s12665-024-11425-4
[7] Daly, H. (1991). Steady-State Economics: The Economics of Bounded Growth. Island Press.
[8] Emetere, M. E., Bello, O., Afolalu, S., Mamudu, A., Amusan, L., Iroham, C., & Odun-Ayo, I. (2021). Parametric study of a proposed small hydropower project at Gurara-Nigeria. Cogent Engineering, 8(1). https://doi.org/10.1080/23311916.2021.1877868
[9] Estate Intel. (2016). The National Policy on Public Private Partnership. Infrastructure Concession Regulatory Commission. Retrieved from https://estateintel.com/wp-content/uploads/2016/05/National-Policy-on-Public-Private-Partnership.pdf
[10] Federal Ministry of Water Resources (2015). The National Water Resources Development Strategy. FMWR, Nigeria.
[11] Foudi, S., McCartney, M., Markandya, A., & Pascual, U. (2023). The impact of multipurpose dams on the values of nature’s contributions to people under a water-energy-food nexus framing. Ecological Economics, 206, 107758. https://doi.org/10.1016/j.ecolecon.2023.107758
[12] Global Water Partnership (2000). “The Role of Integrated Water Resources Management in Sustainable Development.” Global Water Partnership Technical Paper No. 7.
[13] ICOLD (2024). The International Commission on Large Dams: Sustainability in Dam Design and Operation. ICOLD.
[14] ICRC (2024). Public-Private Partnerships in Infrastructure Development: A Nigerian Case Study. Infrastructure Concession Regulatory Commission (ICRC).
[15] Infrastructure Concession Regulatory Commission (ICRC). (2009). National Policy on Public Private Partnership. Abuja: Federal Government of Nigeria. Retrieved from https://www.icrc.gov.ng/portfolio-item/national-policy-on-public-private-partnership/
[16] McCully, P. (2001). Silenced Rivers: The Ecology and Politics of Large Dams. Zed Books.
[17] Okunlola, O. I., Amadi, A. A., Idris-Nda, I., Agbasi, A., & Kolawole, K. L. (2014). Assessment of Water Quality of Gurara Water Transfer from Gurara Dam to Lower Usuma Dam for Abuja Water Supply, FCT, Nigeria. American Journal of Water Resources, 2(4), 74–80. https://doi.org/10.12691/ajwr-2-4-1
[18] Postel, S., & Richter, B. (2003). Water for Life: Creating a Sustainable Water Future. Island Press.
[19] Schmitt, R. J. P., & Rosa, L. (2024). Dams for hydropower and irrigation: Trends, challenges, and alternatives. Renewable and Sustainable Energy Reviews, 199, 114439. https://doi.org/10.1016/j.rser.2024.114439
[20] Sen, A. (1999). Development as Freedom. Oxford University Press.
[21] Tian, F., Zeng, H., Wu, B., Zhang, M., Zhu, W., Phiri, E., & Mashonjowa, E. (2025). Water Use Trajectories in Agriculture and Hydropower in Zambezi River Basin: Assessing with Big Earth Data and Water-energy-food-environment Nexus Approach. Chinese Geographical Science, 35(6), 1240–1255. https://doi.org/10.1007/s11769-025-1548-8
[22] Ujoh, F., Pillah, V., Igbawua, T., Da’u, S. S., & Oruonye, E. D. (2024). Assessment of the environmental and social impacts of Gurara and Azara/Jere irrigation projects in Nigeria. Jalingo Journal of Social and Management Sciences, 5(4), 268–305. https://www.researchgate.net/profile/Fanan-Ujoh/publication/382584657_Assessment_of_the_Environmental_and_Social_Impacts_of_Gurara_and_AzaraJere_Irrigation_Projects_in_Nigeria/links/66a3bf6d4433ad480e7eb061/Assessment-of-the-Environmental-and-Social-Impacts-of-Gurara-and-Azara-Jere-Irrigation-Projects-in-Nigeria.pdf
[23] Wada, A. J., Iguisi, E., & Muhkta, I. (2025). ASSESSMENT OF THE SOCIO-ECONOMIC BENEFITS OF WATER TRANSFER FROM THE GURARA DAM TO USUMA DAM, NIGERIA. FUDMA JOURNAL OF SCIENCES, 9(11). https://doi.org/10.33003/fjs-2025-0911-4005
[24] WCED (1987). Our Common Future. Oxford University Press.
[25] World Bank (2018). Water for Development: A Framework for Action. World Bank, Washington, D.C.
[26] World Bank. (2013). Nigeria: National Policy on Public-Private Partnerships. Public-Private Partnership Legal Resource Center. Retrieved from https://ppp.worldbank.org/library/nigeria-national-policy-public-private-partnerships
How to cite this paper
@article{1713859,
author = {Stella Nneka Arachie, Prof. Ukertor Gabriel Moti},
title = {Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model},
journal = {Iconic Research And Engineering Journals},
year = {2026},
volume = {9},
number = {7},
pages = {2342-2354},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1713859.pdf},
abstract = {This study aims to evaluate the role of Public-Private Partnerships (PPPs) in the development and management of the Gurara Water Transfer Project (GWTP), with a particular focus on the effectiveness of the PPP model in supporting sustainable dam management and addressing socio-economic impacts. The methodology employed is a qualitative, secondary data analysis of government reports, project documentation, in-depth interview of major stakeholders associated with the project. The study specifically examines the operational efficiency of the water transfer system, the long delay in the takeoff of the hydropower generation, the socio-economic consequences for displaced communities, and the governance and security challenges affecting the project. The findings reveal that while the PPP framework facilitated private sector involvement in the project, operational inefficiencies, delays in infrastructure completion and security challenges in the project area hindered the achievement of its full potential. The non-completion of the hydropower retrofitting works have also been significant barriers. In conclusion, the study highlights the need for improved governance, better stakeholder engagement, and stronger risk management strategies to optimize PPP outcomes in future large-scale infrastructure projects. It recommends enhancing transparency, inclusivity, and environmental management to ensure that such projects contribute effectively to sustainable development goals.},
keywords = {Public-Private Partnerships; Sustainable Dam Management; Gurara Water Transfer Project; Socio-economic Impact; Infrastructure Development},
month = {January},
doi = {https://doi.org/10.64388/IREV9I7-1713859}
}