International Peer-Reviewed JournalOpen AccessISSN 2456-8880
irejournals@gmail.com+91-7433024337

Home / Current Issue / Paper 1713859

1713859PublishedVol 9 · Issue 7

Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model

Stella Nneka Arachie Prof. Ukertor Gabriel Moti

Subject area: Management and Commerce  ·  Area of research: Public-Private Partnerships in Infrastructure

DOI: https://doi.org/10.64388/IREV9I7-1713859

Abstract

This study aims to evaluate the role of Public-Private Partnerships (PPPs) in the development and management of the Gurara Water Transfer Project (GWTP), with a particular focus on the effectiveness of the PPP model in supporting sustainable dam management and addressing socio-economic impacts. The methodology employed is a qualitative, secondary data analysis of government reports, project documentation, in-depth interview of major stakeholders associated with the project. The study specifically examines the operational efficiency of the water transfer system, the long delay in the takeoff of the hydropower generation, the socio-economic consequences for displaced communities, and the governance and security challenges affecting the project. The findings reveal that while the PPP framework facilitated private sector involvement in the project, operational inefficiencies, delays in infrastructure completion and security challenges in the project area hindered the achievement of its full potential. The non-completion of the hydropower retrofitting works have also been significant barriers. In conclusion, the study highlights the need for improved governance, better stakeholder engagement, and stronger risk management strategies to optimize PPP outcomes in future large-scale infrastructure projects. It recommends enhancing transparency, inclusivity, and environmental management to ensure that such projects contribute effectively to sustainable development goals.

Keywords

Public-Private Partnerships; Sustainable Dam Management; Gurara Water Transfer Project; Socio-economic Impact; Infrastructure Development

How to cite this paper

Stella Nneka Arachie, Prof. Ukertor Gabriel Moti "Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model" Iconic Research And Engineering Journals Volume 9 Issue 7 2026 Page 2342-2354 https://doi.org/10.64388/IREV9I7-1713859
Stella Nneka Arachie, Prof. Ukertor Gabriel Moti "Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model" Iconic Research And Engineering Journals, vol. 9, no. 7, Jan. 2026, doi: https://doi.org/10.64388/IREV9I7-1713859
Stella Nneka Arachie, Prof. Ukertor Gabriel Moti (2026). Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model. Iconic Research And Engineering Journals, 9(7). doi: https://doi.org/10.64388/IREV9I7-1713859
Stella Nneka Arachie, Prof. Ukertor Gabriel Moti "Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model" Iconic Research And Engineering Journals, vol. 9, no. 7, Jan. 2026. Crossref, https://doi.org/10.64388/IREV9I7-1713859
@article{1713859,
      author = {Stella Nneka Arachie, Prof. Ukertor Gabriel Moti},
      title = {Public-Private-Partnerships and Sustainable Dam Management in Nigeria: Evaluating the Gurara Hydropower and Water Transfer Model},
      journal = {Iconic Research And Engineering Journals},
      year = {2026},
      volume = {9},
      number = {7},
      pages = {2342-2354},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1713859.pdf},
      abstract = {This study aims to evaluate the role of Public-Private Partnerships (PPPs) in the development and management of the Gurara Water Transfer Project (GWTP), with a particular focus on the effectiveness of the PPP model in supporting sustainable dam management and addressing socio-economic impacts. The methodology employed is a qualitative, secondary data analysis of government reports, project documentation, in-depth interview of major stakeholders associated with the project. The study specifically examines the operational efficiency of the water transfer system, the long delay in the takeoff of the hydropower generation, the socio-economic consequences for displaced communities, and the governance and security challenges affecting the project. The findings reveal that while the PPP framework facilitated private sector involvement in the project, operational inefficiencies, delays in infrastructure completion and security challenges in the project area hindered the achievement of its full potential. The non-completion of the hydropower retrofitting works have also been significant barriers. In conclusion, the study highlights the need for improved governance, better stakeholder engagement, and stronger risk management strategies to optimize PPP outcomes in future large-scale infrastructure projects. It recommends enhancing transparency, inclusivity, and environmental management to ensure that such projects contribute effectively to sustainable development goals.},
      keywords = {Public-Private Partnerships; Sustainable Dam Management; Gurara Water Transfer Project; Socio-economic Impact; Infrastructure Development},
      month = {January},
      doi = {https://doi.org/10.64388/IREV9I7-1713859}
  }