Abstract

The study examined the factors influencing the high cost of building materials for public housing projects in Anambra State, Nigeria, using a survey research design. The target population comprised 470 construction professionals, including architects, builders, quantity surveyors, and structural engineers, with 425 completed and valid questionnaires returned, representing a response rate of 90.4%. Data were analyzed using SPSS version 26, employing descriptive statistics to summarize demographic and perception data, and inferential statistics, including one-sample t-tests, to assess the significance of identified factors. Findings revealed that economic-related factors were the most influential determinants of building material costs, with a group mean of 0.82, where inflation and fluctuations in material prices were the most critical (RII = 0.84), followed by exchange rate volatility (RII = 0.83). Stakeholder-related factors, including improper planning (RII = 0.83) and delays in supply (RII = 0.81), ranked second (G.mean = 0.80), while building production-related factors such as labor efficiency and site conditions contributed moderately (G.mean = 0.79). External factors, including government policies and weather conditions, were ranked fourth (G.mean = 0.77). The overall one-sample t-test indicated a statistically significant effect of these factors on material costs (t = 48.401, df = 424, p < 0.001), with a mean score of 4.11, significantly above the neutral benchmark. The study concluded that the high cost of building materials in Anambra State is driven by a combination of macroeconomic, stakeholder, production-related, and external determinants. Effective mitigation requires coordinated policy measures, improved project planning, enhanced stakeholder management, and investment in local material production. These interventions are critical for reducing construction costs, improving efficiency in public housing delivery, and enhancing affordability and sustainability in the state’s housing sector.

Keywords

Building Materials Cost, Public Housing, Construction Industry, Economic Factors, Stakeholder Factors, Anambra State, Housing Affordability, Project Delivery

References

[1] Adedeji, Y. M. D. (2012). Assessment of building materials and house construction costs in Nigeria. Journal of Construction Economics and Management, 4(2), 45–57.

[2] Akadiri, P. O. (2011). Sustainability appraisal model for building materials selection. Journal of Engineering, Design, and Technology, 9(1), 87–102. https://doi.org/10.1108/17260531111114959

[3] Akanni, P. T., Oke, A. E., & Omotilewa, O. (2014). Material management practices in construction companies in Nigeria. Journal of Construction and Project Management, 4(1), 51–61.

[4] Ali, A. S., & Kamaruzzaman, S. N. (2010). Cost performance for building construction projects in Klang Valley, Malaysia. International Journal of Sustainable Construction Engineering and Technology, 1(2), 41–48.

[5] Chudley, R., & Greeno, R. (2016). Construction technology. Pearson Education.

[6] Donyavi, S., & Flanagan, R. (2011). Material waste in construction projects: Trends, drivers, and mitigation strategies. Journal of Construction Engineering and Management, 137(5), 335–348. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000323

[7] Ferry, D. J. (1992). Cost planning of buildings (8th ed.). Blackwell Scientific Publications.

[8] Idoro, G. I., & Jolaiya, T. (2010). Assessing challenges of project cost performance and material usage in the Nigerian construction industry. Australian Journal of Construction Economics and Building, 10(4), 44–53.

[9] Jagboro, G. O., & Owoeye, L. O. (2004). An evaluation of material waste control techniques on building sites. Journal of Construction Research, 3(1), 39–52.

[10] Karana, E., Hekkert, P., & Kandachar, P. (2010). Aesthetic and experience qualities of building materials. Journal of Materials and Design, 31(6), 2934–2940. https://doi.org/10.1016/j.matdes.2010.01.045

[11] Li, H. (2001). Managing material cost escalations in construction projects. Journal of Construction Procurement, 7(2), 110–121.

[12] Mbachu, J. E., & Nkado, R. (2004). Causes and effects of delays and cost overruns in construction projects in Nigeria. Journal of Construction Management and Economics, 22(1), 217–229.

[13] Mojekwu, J. N., Idowu, I. O., & Sode, A. A. (2013). Factors affecting project performance in the Nigerian building industry. International Journal of Construction Project Management, 5(1), 13–22.

[14] Morris, P. W. G., & Hough, G. H. (1991). The anatomy of major projects: A study of the reality of project management. Wiley.

[15] Okongwu, M. I., Okolie, K. C., Obodoh, D. A., & Uche, I. C. (2025). Examination of key factors affecting the construction of lowcost housing in SouthEast Nigeria. International Journal of Multidisciplinary Research and Development, 12(10), 7–12. Retrieved from https://www.researchgate.net/profile/Ikechukwu-Okongwu/publication/396147074_Examination_of_Key_Factors_Affecting_the_Construction_of_Low-Cost_Housing_in_South-East_Nigeria/links/68df803cd221a404b2a51e2e/Examination-of-Key-Factors-Affecting-the-Construction-of-Low-Cost-Housing-in-South-East-Nigeria.pdf

[16] Oladipo, A. A., & Oni, A. O. (2012). Macroeconomic effects on the cost of building materials in Nigeria. Journal of Economics and Sustainable Development, 3(4), 175–187.

[17] Olajide, A. O., Olabode, O., & Iniobong, A. E. (2016). Criteria for success in building projects: Cost, time, and quality evaluation. Journal of Construction Project Management, 6(3), 24–33.

[18] Olanrewaju, A. L., Akinola, A. A., & Oladimeji, O. (2018). Factors influencing cost of building materials in construction projects. Journal of Construction Engineering and Management, 7(4), 110–118.

[19] OluyemiAyibiowu, B. O., Aiyewalehinmi, E. O., & Omolayo, O. M. (2019). Assessment of cost overruns in Nigerian construction projects. International Journal of Civil Engineering and Technology, 10(5), 239–248.

[20] Okoye, P. U., Ngwu, C., & Umeh, C. (2022). Drivers of construction material cost escalation in Anambra State, Nigeria. Nigerian Journal of Construction Technology and Management, 5(1), 25–37.

[21] Ughamadu, J. U. (1993). The effect of currency devaluation on construction costs in Nigeria. Journal of Building Economics, 2(1), 50–62.

[22] Windapo, A. O., & Cattell, K. (2013). The impact of rising material costs on construction industry performance in South Africa. Journal of Construction Economics and Building, 13(2), 57–72.

How to cite this paper

Chukwuma L. C., Iheama N. B., Obiora C. O. "Examination of Factors Influencing Cost of Building Materials in Anambra State." Iconic Research And Engineering Journals Volume 9 Issue 8 2026 Page 2133-2138 https://doi.org/10.64388/IREV9I8-1714738
Chukwuma L. C., Iheama N. B., Obiora C. O. "Examination of Factors Influencing Cost of Building Materials in Anambra State." Iconic Research And Engineering Journals, vol. 9, no. 8, Feb. 2026, doi: https://doi.org/10.64388/IREV9I8-1714738
Chukwuma L. C., Iheama N. B., Obiora C. O. (2026). Examination of Factors Influencing Cost of Building Materials in Anambra State.. Iconic Research And Engineering Journals, 9(8). doi: https://doi.org/10.64388/IREV9I8-1714738
Chukwuma L. C., Iheama N. B., Obiora C. O. "Examination of Factors Influencing Cost of Building Materials in Anambra State." Iconic Research And Engineering Journals, vol. 9, no. 8, Feb. 2026. Crossref, https://doi.org/10.64388/IREV9I8-1714738
@article{1714738,
      author = {Chukwuma L. C., Iheama N. B., Obiora C. O.},
      title = {Examination of Factors Influencing Cost of Building Materials in Anambra State.},
      journal = {Iconic Research And Engineering Journals},
      year = {2026},
      volume = {9},
      number = {8},
      pages = {2133-2138},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1714738.pdf},
      abstract = {The study examined the factors influencing the high cost of building materials for public housing projects in Anambra State, Nigeria, using a survey research design. The target population comprised 470 construction professionals, including architects, builders, quantity surveyors, and structural engineers, with 425 completed and valid questionnaires returned, representing a response rate of 90.4%. Data were analyzed using SPSS version 26, employing descriptive statistics to summarize demographic and perception data, and inferential statistics, including one-sample t-tests, to assess the significance of identified factors. Findings revealed that economic-related factors were the most influential determinants of building material costs, with a group mean of 0.82, where inflation and fluctuations in material prices were the most critical (RII = 0.84), followed by exchange rate volatility (RII = 0.83). Stakeholder-related factors, including improper planning (RII = 0.83) and delays in supply (RII = 0.81), ranked second (G.mean = 0.80), while building production-related factors such as labor efficiency and site conditions contributed moderately (G.mean = 0.79). External factors, including government policies and weather conditions, were ranked fourth (G.mean = 0.77). The overall one-sample t-test indicated a statistically significant effect of these factors on material costs (t = 48.401, df = 424, p < 0.001), with a mean score of 4.11, significantly above the neutral benchmark. The study concluded that the high cost of building materials in Anambra State is driven by a combination of macroeconomic, stakeholder, production-related, and external determinants. Effective mitigation requires coordinated policy measures, improved project planning, enhanced stakeholder management, and investment in local material production. These interventions are critical for reducing construction costs, improving efficiency in public housing delivery, and enhancing affordability and sustainability in the state’s housing sector.},
      keywords = {Building Materials Cost, Public Housing, Construction Industry, Economic Factors, Stakeholder Factors, Anambra State, Housing Affordability, Project Delivery},
      month = {February},
      doi = {https://doi.org/10.64388/IREV9I8-1714738}
  }