Delay Factors of Construction Project Delivery in Nigeria
Subject area: Science,Engineering and Technology · Area of research: Project Management
DOI: https://doi.org/10.64388/IREV9I12-1719240
Abstract
It is evident in the Nigeria construction industry that it is a rare event that the projects are completed on the scheduled time, budgeted cost, and desired quality because the construction projects experience a tremendous amount of delays. Timely completion of construction project is a major criterion of project success. The need to control the causes of delays during the construction process comes out when the number of delay project has been increasing from time to time. Hence, it is essential to identify the causes of this problem from the early stage of construction project. The objectives of this study are to Develop a framework for mitigating delay factors on construction project delivery in Nigeria, the study tends to evaluate the causes of delay in term of frequency occurrence and severity effect and have develop a framework to mitigate its occurrence. A total of 136 contractors, consultants, site engineers and project managers with an experience in construction of infrastructural project were involved in the study. A questionnaire survey was conducted to identify the significant causes of delay in order to avoid or minimize their impact on construction project. The perspective of contractors, consultants and client has been analyzed and ranked based on Relative Important Index (RII). The study indicate that the top major causes of delay were ´Owner interference´, ´Frequent change orders´, ´Long waiting time for approval of tests and inspection´, ´Shortage of construction material´, ´Mistakes in design documents´, ´Inappropriate organizational structure linking all parties involved in the project´, ´Mistakes and discrepancies in design documents´, ´Discrepancies in contract document´ and ´Delays caused by subcontractors´. In addition, the top major effects of delay were; time overrun, cost overrun, dispute, arbitration, litigation and abandonment.
Keywords
Construction Industry, Construction Delays, Project Delivery, Construction Stakeholders, Nigeria
References
[1] Abdul-Rahman, H., 2006, Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management,132 (2), 125-133.
[2] Akinsiku, O.E. and Akinsulire, A. (2023). Stakeholders’ perception of the causes and effects of construction delays on project delivery. KICEM Journal of Construction Engineering and Project Management, 2(4), 24-31
[3] Ameh, O. J., Soyingbe, A. A., & Odusami, K. T. (2010). Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), 49–67.
[4] Divya R. & Ramya S., 2015, Causes, Effects and Minimization of Delays in Construction Projects, National Conference on Research Advances in Communication, Computation, Electrical Science and Structures335-340
[5] Egwim, C.N., Alaka, H., Demir, E., Balogun, H. and Ajayi, S. (2022). Systematic review of critical drivers for delay risk prediction: towards a conceptual framework for BIM-based construction projects. Frontiers in Built Environment, 1-24. https://doi.org/10.1108/FEBE-05-2022-0017
[6] Fashina, A.A., Omar, M.A., Sheikh, A.A. and Fakunle, F.F. (2023). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon 7, e06826. https://doi.org/10.1016/j.heliyon.2021.e06826
[7] Mamman, E.J. and Umesi, E.R. (2023). Causes and effects of delay on public construction projects delivery in Nigeria. African Scholar Journal of Built Env. & Giological Research, 24(2), 187-200
[8] Obodoh, D.A. and Obodoh, C. (2024). Causes and effects of construction project delays in Nigerian construction industry. International Journal of Innovative Science, Engineering & Technology, 3(5), 65-84
[9] Odeh, A.M. and Battaineh, H.T. (2012), Causes of construction delay: traditional contracts. International Journal of Project Management 20:67-73
[10] Odeyinka, H. A., & Yusuf, A. (1997). The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), 31–44.
[11] Okafor, C.C., Ibekwe, J.C., Nnadi, V.E., Otunomo, F.A. and Ajaero, C.C. (2025). A review on trends, challenges, and strategies for circular economy in Nigerian construction. Journal of the Knowledge Economy, 2697.
[12] Okafor, C.C. (2023). Estimation of carbon dioxide emission from fossil-fueled electricity generators of households in Enugu metropolis. Unpublished PhD Thesis, Center for Environmental Management and Control, University of Nigeria.
[13] Shrivas, A. and Singla, H.K. (2024). Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22, 1455 -1463. https://doi.org/10.1080/15623599.2020.1728486
How to cite this paper
@article{1719240,
author = {Nwanze, Stanley S., Nwachukwu, Chinedu C.},
title = {Delay Factors of Construction Project Delivery in Nigeria},
journal = {Iconic Research And Engineering Journals},
year = {2026},
volume = {9},
number = {12},
pages = {3866-3875},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1719240.pdf},
abstract = {It is evident in the Nigeria construction industry that it is a rare event that the projects are completed on the scheduled time, budgeted cost, and desired quality because the construction projects experience a tremendous amount of delays. Timely completion of construction project is a major criterion of project success. The need to control the causes of delays during the construction process comes out when the number of delay project has been increasing from time to time. Hence, it is essential to identify the causes of this problem from the early stage of construction project. The objectives of this study are to Develop a framework for mitigating delay factors on construction project delivery in Nigeria, the study tends to evaluate the causes of delay in term of frequency occurrence and severity effect and have develop a framework to mitigate its occurrence. A total of 136 contractors, consultants, site engineers and project managers with an experience in construction of infrastructural project were involved in the study. A questionnaire survey was conducted to identify the significant causes of delay in order to avoid or minimize their impact on construction project. The perspective of contractors, consultants and client has been analyzed and ranked based on Relative Important Index (RII). The study indicate that the top major causes of delay were ´Owner interference´, ´Frequent change orders´, ´Long waiting time for approval of tests and inspection´, ´Shortage of construction material´, ´Mistakes in design documents´, ´Inappropriate organizational structure linking all parties involved in the project´, ´Mistakes and discrepancies in design documents´, ´Discrepancies in contract document´ and ´Delays caused by subcontractors´. In addition, the top major effects of delay were; time overrun, cost overrun, dispute, arbitration, litigation and abandonment.},
keywords = {Construction Industry, Construction Delays, Project Delivery, Construction Stakeholders, Nigeria},
month = {June},
doi = {https://doi.org/10.64388/IREV9I12-1719240}
}