Sustainable Infrastructure Delivery in Red Sea Global Developments: A Vision 2030 Review of Quality, HSE, Procurement, and Stakeholder Governance
Subject area: Science,Engineering and Technology · Area of research: Sustainable Infrastructure Delivery
DOI: 10.64388/IREV10I1-1719676
Abstract
Saudi Arabia's Vision 2030 has placed large-scale tourism, infrastructure, and regional development projects at the centre of economic diversification. Red Sea Global (RSG) represents one of the most visible examples of this transition because its developments combine luxury tourism, environmental regeneration, local economic participation, and high delivery complexity. This review paper examines how sustainable infrastructure delivery can be strengthened in Red Sea Global-type developments through an integrated governance model that combines quality management, health, safety and environmental (HSE) control, procurement governance, and stakeholder engagement. The study adopts a structured narrative review of public Vision 2030 and RSG documents, international project governance standards, sustainability reporting frameworks, and recent construction-management practice sources. The review finds that the main delivery challenge is not the absence of individual systems, but the fragmentation between them. Quality control often focuses on specifications and non-conformance closure; HSE governance focuses on hazard prevention and compliance; procurement governance focuses on supplier performance and material availability; and stakeholder governance focuses on coordination, approvals, and community expectations. In giga-project conditions, these domains must operate as one decision system supported by stage-gates, digital dashboards, risk registers, supplier traceability, lessons-learned mechanisms, and transparent reporting. The paper proposes an integrated governance framework and lifecycle workflow for sustainable infrastructure delivery in RSG-style projects. The contribution is a practical review model that links Vision 2030 objectives with construction execution discipline, making sustainability measurable at site, package, programme, and portfolio levels.
Keywords
Saudi Vision 2030, Red Sea Global, Sustainable Infrastructure, Construction Governance, HSE, Quality Management, Procurement, Stakeholder Management, Giga-Projects, Regenerative Tourism
References
[1] Autodesk and FMI. (2021). Harnessing the Data Advantage in Construction. Autodesk Construction Cloud Industry Report.
[2] Chartered Institute of Building. (2022). Code of Quality Management in Construction. CIOB, Bracknell.
[3] Deloitte. (2024). Engineering and Construction Industry Outlook. Deloitte Insights.
[4] FIDIC. (2022). Conditions of Contract for Works of Civil Engineering Construction: Green Book, Second Edition. International Federation of Consulting Engineers.
[5] Global Reporting Initiative. (2021). GRI Standards 2021. GRI, Amsterdam.
[6] IFRS Foundation. (2023). IFRS S1 General Requirements for Disclosure of Sustainability-related Financial Information. ISSB.
[7] IFRS Foundation. (2023). IFRS S2 Climate-related Disclosures. ISSB.
[8] International Labour Organization. (2022). Safety and Health in Construction: Revised Code of Practice. ILO, Geneva.
[9] International Organization for Standardization. (2020). ISO 21502:2020 Project, Programme and Portfolio Management - Guidance on Project Management. ISO, Geneva.
[10] International Organization for Standardization. (2020). ISO 19650-3:2020 Organization and Digitization of Information about Buildings and Civil Engineering Works, Including Building Information Modelling - Operational Phase of Assets. ISO, Geneva.
[11] International Organization for Standardization. (2021). ISO 37301:2021 Compliance Management Systems - Requirements with Guidance for Use. ISO, Geneva.
[12] International Organization for Standardization. (2021). ISO 45003:2021 Occupational Health and Safety Management - Psychological Health and Safety at Work. ISO, Geneva.
[13] International Organization for Standardization. (2022). ISO 19650-4:2022 Information Exchange. ISO, Geneva.
[14] McKinsey Global Institute. (2020). The Next Normal in Construction: How Disruption Is Reshaping the World's Largest Ecosystem. McKinsey & Company.
[15] Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK Guide), Seventh Edition. PMI, Newtown Square.
[16] Public Investment Fund. (2024). Annual Report 2024. PIF, Riyadh.
[17] Red Sea Global. (2023). RSG Achieves Certification for Sustainable Procurement. Red Sea Global, Riyadh.
[18] Red Sea Global. (2024). Annual Sustainability Report 2024. Red Sea Global, Riyadh.
[19] Red Sea Global. (2025). Unlocking Innovation for Regenerative Tourism. Red Sea Global, Riyadh.
[20] Red Sea Global. (2026a). About Red Sea Global: Aligned with Saudi Vision 2030. Red Sea Global, Riyadh.
[21] Red Sea Global. (2026b). The Red Sea: A Regenerative Tourism Destination. Red Sea Global, Riyadh.
[22] Red Sea Global. (2026c). Annual Sustainability Reports. Red Sea Global, Riyadh.
[23] Red Sea Global. (2026d). Building Strategic Partnerships for Regeneration. Red Sea Global, Riyadh.
[24] Saudi Green Initiative. (2024). Saudi Green Initiative: Progress and Targets. SGI, Riyadh.
[25] Saudi Vision 2030. (2025). Vision 2030 Annual Report 2025. Government of Saudi Arabia, Riyadh.
[26] Saudi Vision 2030. (2025). Red Sea Global Project Profile. Government of Saudi Arabia, Riyadh.
[27] Taskforce on Nature-related Financial Disclosures. (2023). Recommendations of the Taskforce on Nature-related Financial Disclosures. TNFD.
[28] United Nations Environment Programme. (2021). 2021 Global Status Report for Buildings and Construction. UNEP, Nairobi.
[29] United Nations Environment Programme. (2022). 2022 Global Status Report for Buildings and Construction. UNEP, Nairobi.
[30] World Green Building Council. (2021). Beyond the Business Case: Why You Cannot Afford Not to Invest in a Sustainable Built Environment. WorldGBC, London.
How to cite this paper
@article{1719676,
author = {Waqar Hussnain},
title = {Sustainable Infrastructure Delivery in Red Sea Global Developments: A Vision 2030 Review of Quality, HSE, Procurement, and Stakeholder Governance},
journal = {Iconic Research And Engineering Journals},
year = {2026},
volume = {10},
number = {1},
pages = {2057-2069},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1719676.pdf},
abstract = {Saudi Arabia's Vision 2030 has placed large-scale tourism, infrastructure, and regional development projects at the centre of economic diversification. Red Sea Global (RSG) represents one of the most visible examples of this transition because its developments combine luxury tourism, environmental regeneration, local economic participation, and high delivery complexity. This review paper examines how sustainable infrastructure delivery can be strengthened in Red Sea Global-type developments through an integrated governance model that combines quality management, health, safety and environmental (HSE) control, procurement governance, and stakeholder engagement. The study adopts a structured narrative review of public Vision 2030 and RSG documents, international project governance standards, sustainability reporting frameworks, and recent construction-management practice sources. The review finds that the main delivery challenge is not the absence of individual systems, but the fragmentation between them. Quality control often focuses on specifications and non-conformance closure; HSE governance focuses on hazard prevention and compliance; procurement governance focuses on supplier performance and material availability; and stakeholder governance focuses on coordination, approvals, and community expectations. In giga-project conditions, these domains must operate as one decision system supported by stage-gates, digital dashboards, risk registers, supplier traceability, lessons-learned mechanisms, and transparent reporting. The paper proposes an integrated governance framework and lifecycle workflow for sustainable infrastructure delivery in RSG-style projects. The contribution is a practical review model that links Vision 2030 objectives with construction execution discipline, making sustainability measurable at site, package, programme, and portfolio levels.},
keywords = {Saudi Vision 2030, Red Sea Global, Sustainable Infrastructure, Construction Governance, HSE, Quality Management, Procurement, Stakeholder Management, Giga-Projects, Regenerative Tourism},
month = {July},
doi = {https://doi.org/10.64388/IREV10I1-1719676}
}