Abstract

Cost escalation in megaprojects is frequently recorded as a project-controls problem although a material proportion of its antecedents originates outside the conventional cost ledger: in supplier capacity, procurement decisions, fabrication readiness, delivery uncertainty and poorly sequenced site work. This integrative review examines how construction supply chain management (CSCM) can be connected to project controls to improve the timeliness and reliability of cost decisions. Thirty DOI-identifiable publications dated 2020–2025 provide the core analytical literature, complemented by critical examination of the managerial mechanisms linking procurement and production information to schedule and cost forecasts. The review adopts thematic synthesis rather than a statistical meta-analysis because the publications differ in design, context and outcome measures. Four interdependent mechanisms emerge: a common work-package data structure; supplier-informed lookahead and change control; reconciliation of earned value, commitments and remaining exposure; and governance that assigns accountability for corrective action. An integrated control architecture and an explicitly hypothetical, internally reconciled numerical example illustrate how cost signals can change when upstream commitments and schedule consequences become visible. The argument is not that technology independently creates savings, but that decision quality improves when trusted supply-chain evidence is translated into actionable project forecasts. The paper develops research propositions and a validation agenda for complex, multi-contractor delivery environments, while identifying contractual, data-quality and organizational conditions under which integration may fail.

Keywords

construction supply chain management; project controls; megaprojects; cost performance; procurement integration; earned value management; cost forecasting

References

[1] Antonini BG, Pimentel FM, Fireman MCT, Etges BMBS, Campos FR, de Lima Junior J, Kronbauer BK (2023). Logistics planning within the Last Planner System for highway construction projects. Proceedings of the 31st International Group for Lean Construction Conference, 1291–1302. https://doi.org/10.24928/2023/0191

[2] Ashcraft H (2022). Transforming project delivery: integrated project delivery. Oxford Review of Economic Policy, 38(2), 369–384. https://doi.org/10.1093/oxrep/grac001

[3] Ateş B, Eirgash MA (2025). Proactive and data-driven decision-making using earned value analysis in infrastructure projects. Buildings, 15(14), 2388. https://doi.org/10.3390/buildings15142388

[4] Ballard G, Tommelein I (2021). 2020 current process benchmark for the Last Planner System of project planning and control. Lean Construction Journal, 53–155. https://doi.org/10.60164/47e7h7a1b

[5] da Cunha RA, Rangel LAD, Rudolf CA, Santos L (2022). A decision support approach employing the PROMETHEE method and risk factors for critical supply assessment in large-scale projects. Operations Research Perspectives, 9, 100238. https://doi.org/10.1016/j.orp.2022.100238

[6] Denicol J, Davies A, Krystallis I (2020). What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda. Project Management Journal, 51(3), 328–345. https://doi.org/10.1177/8756972819896113

[7] Du X (2021). Construction cost simulation based on artificial intelligence and BIM. Scientific Programming, 2021, 9744286. https://doi.org/10.1155/2021/9744286

[8] Ekeskär A, Havenvid MI, Karrbom Gustavsson T, Eriksson PE (2022). Construction logistics in a multi-project context: coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), 25–40. https://doi.org/10.1080/01446193.2021.2012815

[9] Elghaish F, Hosseini MR, Kocaturk T, Arashpour M, Bararzadeh Ledari M (2023). Digitalised circular construction supply chain: an integrated BIM–blockchain solution. Automation in Construction, 148, 104746. https://doi.org/10.1016/j.autcon.2023.104746

[10] Elmughrabi W, Ben Sassi O, Dao TM, Chaabane A (2020). Collaborative supply chain planning and scheduling of construction projects. IFAC-PapersOnLine, 53(2), 10761–10766. https://doi.org/10.1016/j.ifacol.2020.12.2858

[11] Elsaid M, Nassar K, Alqahtani FK, Abotaleb I (2025). Comparative analysis of earned value management techniques in construction projects. Scientific Reports, 15, 23606. https://doi.org/10.1038/s41598-025-05834-z

[12] Farid P, Klakegg OJ, Bakke C (2025). Mega construction projects: governance challenges for the project owner. Procedia Computer Science, 256, 1474–1481. https://doi.org/10.1016/j.procs.2025.02.281

[13] Ibrahim A, Zayed T, Lafhaj Z (2025). Trends and gaps in lean construction practices for construction of megaprojects: a critical review. Alexandria Engineering Journal, 118, 174–193. https://doi.org/10.1016/j.aej.2025.01.046

[14] Karlovsek J, Meath C, Miles-Mwangangi L, MacDonald C, Brockmann A (2024). Implementing circular economy principles in infrastructure procurement to support circular supply chains. Engineering, Construction and Architectural Management, 31(11), 4645–4658. https://doi.org/10.1108/ECAM-09-2022-0908

[15] Lovallo D, Cristofaro M, Flyvbjerg B (2023). Governing large projects: a three-stage process to get it right. Academy of Management Perspectives. https://doi.org/10.5465/amp.2021.0129

[16] Mesa HA, Molenaar KR, Alarcón LF (2020). Modeling supply chain integration in an integrated project delivery system. Sustainability, 12(12), 5092. https://doi.org/10.3390/su12125092

[17] Onyia U, Ani IS, Nwankwo UF (2024). Addressing the challenges towards the adoption of digital technologies in construction supply chain management. Discover Civil Engineering, 1, 118. https://doi.org/10.1007/s44290-024-00132-5

[18] Perera H, Azadnia AH, Ghadimi P (2022). Development of a multi-agent system to tackle communication fragmentation and information exchange in the construction industry. IFAC-PapersOnLine, 55(10), 335–340. https://doi.org/10.1016/j.ifacol.2022.09.409

[19] Popov V, Medineckienė M, Grigorjeva T, Zabulėnas AR (2021). Building information modelling: procurement procedure. Business, Management and Economics Engineering. https://doi.org/10.3846/bmee.2021.14653

[20] Power W, Sinnott D, Mullin A (2021). Improving commissioning and qualification delivery using Last Planner System. Lean Construction Journal, 36–52. https://doi.org/10.60164/c7g8d2i4i

[21] Rahman AD, Handayani TN, Nugroho ASB, Dewi NNP, Yudhistira AT (2025). A BIM-based system for earned value analysis in construction projects. ASEAN Engineering Journal, 15(3), 101–111. https://doi.org/10.11113/aej.v15.23087

[22] Sadeghi S, Akbarpour A, Abbasianjahromi H (2022). Provide a lean and agile strategy for an antifragile sustainable supply chain in the construction industry (residential complex). Cleaner Logistics and Supply Chain, 5, 100079. https://doi.org/10.1016/j.clscn.2022.100079

[23] Stefano G, Denicol J, Broyd T, Davies A (2023). What are the strategies to manage megaproject supply chains? A systematic literature review and research agenda. International Journal of Project Management, 41(3), 102457. https://doi.org/10.1016/j.ijproman.2023.102457

[24] Warid O, Hamani K (2023). Lean construction in the UAE: implementation of Last Planner System. Lean Construction Journal, 2023, 1–20. https://doi.org/10.60164/96f4a5e0g

[25] Waqar A, Houda M, Ahsan M, Nisar S (2025). Enhancing project performance through sustainable supply chain management: a comprehensive analysis of residential construction practices. Environmental Challenges, 18, 101075. https://doi.org/10.1016/j.envc.2024.101075

[26] Yilmaz S, Kumar D, Hada S, Demirkesen S, Zhang C, Li H (2025). A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), 861–875. https://doi.org/10.1080/15623599.2024.2371626

[27] Zahoor H, Khan RM, Nawaz A, Ayaz M, Maqsoom A (2021). Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), 842–869. https://doi.org/10.1108/ECAM-11-2020-0989

[28] Zani CM, Denicol J, Broyd T (2024). Organisation design in megaprojects: a systematic literature review and research agenda. International Journal of Project Management, 42(6), 102634. https://doi.org/10.1016/j.ijproman.2024.102634

[29] Zenezini G, Mangano G, Castelblanco G (2024). Impact of integrated supply chain platforms on construction project management. Proceedings of the 41st International Symposium on Automation and Robotics in Construction, 381–387. https://doi.org/10.22260/isarc2024/0050

[30] Zhang W, Yu C, Zhong RY (2023). Stability measure for prefab balancing in prefabrication construction supply chain management. Computers & Industrial Engineering, 183, 109518. https://doi.org/10.1016/j.cie.2023.109518

How to cite this paper

Samhar Samoon "Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects" Iconic Research And Engineering Journals Volume 10 Issue 4 2026 Page 3690-3705
Samhar Samoon "Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects" Iconic Research And Engineering Journals, vol. 10, no. 4, Oct. 2026
Samhar Samoon (2026). Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects. Iconic Research And Engineering Journals, 10(4).
Samhar Samoon "Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects" Iconic Research And Engineering Journals, vol. 10, no. 4, Oct. 2026.
@article{1724332,
      author = {Samhar Samoon},
      title = {Integration of Construction Supply Chain Management and Project Controls for Improved Cost Performance in Mega Projects},
      journal = {Iconic Research And Engineering Journals},
      year = {2026},
      volume = {10},
      number = {4},
      pages = {3690-3705},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1724332.pdf},
      abstract = {Cost escalation in megaprojects is frequently recorded as a project-controls problem although a material proportion of its antecedents originates outside the conventional cost ledger: in supplier capacity, procurement decisions, fabrication readiness, delivery uncertainty and poorly sequenced site work. This integrative review examines how construction supply chain management (CSCM) can be connected to project controls to improve the timeliness and reliability of cost decisions. Thirty DOI-identifiable publications dated 2020–2025 provide the core analytical literature, complemented by critical examination of the managerial mechanisms linking procurement and production information to schedule and cost forecasts. The review adopts thematic synthesis rather than a statistical meta-analysis because the publications differ in design, context and outcome measures. Four interdependent mechanisms emerge: a common work-package data structure; supplier-informed lookahead and change control; reconciliation of earned value, commitments and remaining exposure; and governance that assigns accountability for corrective action. An integrated control architecture and an explicitly hypothetical, internally reconciled numerical example illustrate how cost signals can change when upstream commitments and schedule consequences become visible. The argument is not that technology independently creates savings, but that decision quality improves when trusted supply-chain evidence is translated into actionable project forecasts. The paper develops research propositions and a validation agenda for complex, multi-contractor delivery environments, while identifying contractual, data-quality and organizational conditions under which integration may fail.},
      keywords = {construction supply chain management; project controls; megaprojects; cost performance; procurement integration; earned value management; cost forecasting},
      month = {October},
  }