Private Project Delivery Under Current Procurement Systems in Nigeria
Subject area: Science,Engineering and Technology · Area of research: Construction Project Management
Abstract
Private construction projects in Nigeria continue to face delays, cost overruns, coordination problems and quality concerns. Procurement systems shape contractual relationships, allocation of responsibilities, communication and project control, and may therefore influence delivery outcomes. This study assessed current procurement systems used in private construction projects in Nigeria, the factors guiding their selection, the challenges associated with implementation, and perceived relationships with cost, time and quality performance. A descriptive survey was conducted among construction professionals in Lagos and Ibadan. Of 143 questionnaires distributed, 105 valid responses were returned, giving a response rate of 73.4%. Stratified and purposive sampling were used. Data were analysed in SPSS using frequencies, percentages, mean scores, rankings and Pearson correlation. Design and Build had the highest reported adoption mean (3.42), followed by Traditional Procurement (3.35) and Negotiated Procurement (3.21); Integrated Project Delivery had the lowest mean (2.16). Availability of project funds (4.29), project complexity (4.28) and project size (4.27) were the strongest reported procurement-selection factors. Project delays (4.20), cost overruns (4.04) and poor coordination (3.95) were prominent challenges. Respondents rated procurement-related scheduling/programme management at 4.15, specification compliance at 4.08 and cost control at 4.03. Overall performance was positively associated with cost (r = 0.253, p = 0.009), time (r = 0.517, p < 0.001) and quality (r = 0.591, p < 0.001). The study concludes that procurement choices should align with project financing, complexity, size and quality requirements, supported by effective planning, contract administration and stakeholder coordination.
Keywords
construction procurement, private construction, project delivery, Nigeria, cost performance, time performance, quality performance
References
[1] Aghimien DO, Aigbavboa CO, Oke AE, Thwala WD (2023). Construction procurement and project delivery in Nigeria: Current challenges and emerging trends. Routledge.
[2] Babatunde SO, Opawole A, Akinsiku OE (2010). Critical success factors in public-private partnership (PPP) on infrastructure delivery in Nigeria. Journal of Facilities Management, 8(3), 212–225.
[3] Coase RH (1937). The nature of the firm. Economica, 4(16), 386–405. https://doi.org/10.1111/j.1468-0335.1937.tb00002.x
[4] Dim NU, Ezeabasili ACC (2015). Strategic procurement practices and construction project performance in Nigeria. Journal of Construction in Developing Countries, 20(2), 1–18.
[5] Fubara BA (2024). Private sector participation and project delivery performance in the Nigerian construction industry. CRC Press.
[6] Ibrahim AD, Price ADF, Dainty ARJ (2014). The analysis of procurement systems in the Nigerian construction industry. Journal of Engineering, Design and Technology, 12(3), 286–307.
[7] Jensen MC, Meckling WH (1976). Theory of the firm: Managerial behaviour, agency costs and ownership structure. Journal of Financial Economics, 3(4), 305–360. https://doi.org/10.1016/0304-405X(76)90026-X
[8] Jimoh RA, Olanrewaju A, Ibrahim AD, Waziri BS (2015). Assessment of project delivery performance in the Nigerian construction industry. Journal of Construction Project Management and Innovation, 5(2), 1236–1254.
[9] Ogbaragu CJ, Oke AE, Aghimien DO, Owolabi JD (2023). Procurement systems and project delivery performance in developing construction industries. International Journal of Construction Management, 23(12), 1981–1993.
[10] Project Management Institute (2021). A guide to the project management body of knowledge (PMBOK® Guide). 7th ed. Project Management Institute.
[11] Williamson OE (1985). The economic institutions of capitalism: Firms, markets, relational contracting. Free Press.
How to cite this paper
@article{1724890,
author = {Oluwadare Abraham Awe, Sunday Adefemi Adesogan},
title = {Private Project Delivery Under Current Procurement Systems in Nigeria},
journal = {Iconic Research And Engineering Journals},
year = {2026},
volume = {10},
number = {5},
pages = {1868-1876},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1724890.pdf},
abstract = {Private construction projects in Nigeria continue to face delays, cost overruns, coordination problems and quality concerns. Procurement systems shape contractual relationships, allocation of responsibilities, communication and project control, and may therefore influence delivery outcomes. This study assessed current procurement systems used in private construction projects in Nigeria, the factors guiding their selection, the challenges associated with implementation, and perceived relationships with cost, time and quality performance. A descriptive survey was conducted among construction professionals in Lagos and Ibadan. Of 143 questionnaires distributed, 105 valid responses were returned, giving a response rate of 73.4%. Stratified and purposive sampling were used. Data were analysed in SPSS using frequencies, percentages, mean scores, rankings and Pearson correlation. Design and Build had the highest reported adoption mean (3.42), followed by Traditional Procurement (3.35) and Negotiated Procurement (3.21); Integrated Project Delivery had the lowest mean (2.16). Availability of project funds (4.29), project complexity (4.28) and project size (4.27) were the strongest reported procurement-selection factors. Project delays (4.20), cost overruns (4.04) and poor coordination (3.95) were prominent challenges. Respondents rated procurement-related scheduling/programme management at 4.15, specification compliance at 4.08 and cost control at 4.03. Overall performance was positively associated with cost (r = 0.253, p = 0.009), time (r = 0.517, p < 0.001) and quality (r = 0.591, p < 0.001). The study concludes that procurement choices should align with project financing, complexity, size and quality requirements, supported by effective planning, contract administration and stakeholder coordination.},
keywords = {construction procurement, private construction, project delivery, Nigeria, cost performance, time performance, quality performance},
month = {November},
}