Abstract

Managing the challenge of flooding is an important aspect to consider when developing buildings in coastal areas of Lagos. Value Management can be used to provide structure when considering the functions associated with a project. It also considers the different options available to achieve value through efficient use of resources. There are concerns regarding how much flood resilience is being considered during Value Management activities on building projects in coastal Lagos. This study looked at how Value Management is currently being practiced and how much flood resilience is being considered in relation to Value Management activities on buildings projects in Lagos, Nigeria. A convergent mixed-methods approach was used during the research phase. Data was gathered by completing a structured questionnaire targeting built environment professionals and other relevant project stakeholders. A total of 325 valid responses were received out of a total of 348 questionnaires (93.4%). 20 experienced practitioners were also interviewed. Statistical analysis was completed by calculating the mean score and standard deviation of quantitative responses. Qualitative responses were analysed using thematic analysis. Results showed that there is a moderate amount of Value Management activities being implemented (overall mean score 2.88). Systematic consideration of alternative solutions in design and construction had the highest mean score (3.29). Functional analysis had the next highest mean score (3.21). Incorporating flood risk and resilience requirements was ranked lower with a mean score of 2.49. Considering the life cycle performance of flood resilience had a mean score of 2.51. Findings show that whilst traditional Value Management activities are being practised to a moderate extent, flood resilience is not being considered to a great extent. It should be explicitly considered during Value Management activities throughout the planning, design evaluation and life cycle stages.

Keywords

Value Management, flood resilience, building projects, lifecycle performance, coastal Lagos, construction industry

References

[1] Adegun O (2023). Flood-related challenges and impacts within coastal informal settlements: A case from Lagos, Nigeria. International Journal of Urban Sustainable Development, 15, 1–13. https://doi.org/10.1080/19463138.2022.2159415

[2] Alshehri A (2020). Value management practices in construction industry: An analytical review. The Open Civil Engineering Journal, 14, 10–19. https://doi.org/10.2174/1874149502014010010

[3] Cal I, Ciravoğlu A (2024). Determining vulnerability indicators of buildings for sea-level rise and floods in urban coastal areas. Sustainability. https://doi.org/10.3390/su17010027

[4] Ccama Condori HA, Panca Humpiri LV (2024). Identification and classification of benefits for value management in construction projects. Podium, 46, 21–40. https://doi.org/10.31095/podium.2024.46.2

[5] Doornkamp TJL, Kruijf V, Pahlow M, Matheson D (2024). How flood risk management projects can improve urban resilience: A combined assessment approach of functional resilience and adaptive capacity. Australasian Journal of Water Resources, 29, 8–18. https://doi.org/10.1080/13241583.2024.2429226

[6] Ebekozien A, Aigbavboa C, Samsurijan M, Firdaus RR, Salman A (2023). Appraising flood resilience technologies role in developing cities: How prepared is the professional stakeholder? International Journal of Construction Management, 24, 683–692. https://doi.org/10.1080/15623599.2023.2203501

[7] French J, Nicholls R, Brown S, Carpenter S, Haigh I, Hill C, Lazarus E, Thompson C (2020). Operationalising coastal resilience to flood and erosion hazard: A demonstration for England. The Science of the Total Environment, 783, 146880. https://doi.org/10.31223/x5z31h

[8] Gaur S, Tawalare AG (2024). Stakeholder management and its role on value creation in construction projects: A cross-case analysis. Asian Journal of Civil Engineering, 25(4), 3763–3776. https://doi.org/10.1007/s42107-024-01009-9

[9] González-Dueñas C, Padgett J (2021). Performance-based coastal engineering framework. Frontiers in Built Environment, 7, 690715. https://doi.org/10.3389/fbuil.2021.690715

[10] Ikediashi DI, Bassey IO (2021). Value management practices for construction projects in South-South, Nigeria. Journal of Contemporary Research in the Built Environment, 5(1), 18–33. https://doi.org/10.68128/jocrebe.2021.j06itd1h

[11] Ilenikhena L, Adindu C (2021). Exploratory study on the adoption of value management for construction development projects in North Central Nigeria. Journal of Urban Research and Development, 2(1), 17–29.

[12] Ilesanmi OO, Oke A, Moyanga D, Aliu J, Ojo L (2025). Innovative strategies to prevent flooding in buildings and infrastructure in Nigeria. International Journal of Disaster Resilience in the Built Environment. https://doi.org/10.1108/ijdrbe-03-2025-0040

[13] Jiya VH, Ogunleye EI, Onuzulike CO, Akande E, et al. (2023). Value management in the Nigerian construction industry: Challenges and prospects. Journal of Management Studies and Development, 2(2), 37–65. https://doi.org/10.56741/jmsd.v2i02.297

[14] Lin X, Mazlan AN, Ismail S, Hu L, Kasiman EH (2023). Status of value management studies in construction projects: A systematic review. Ain Shams Engineering Journal, 14(1), 101820. https://doi.org/10.1016/j.asej.2022.101820

[15] Malek MH, Mat Isa CM (2024). Integrated value-based project management in the Malaysian construction industry. ESTEEM Academic Journal, 20, 147–167. https://doi.org/10.24191/esteem.v20iSeptember.1839.g1827

[16] Maragara GK, Okaka JO, Alkizim A (2024). A model for enhancing the application of value management in construction projects in Kenya. Journal of Agriculture, Science and Technology, 23(1), 77–87. https://doi.org/10.4314/jagst.v23i1.6

[17] McClymont K, Morrison D, Beevers L, Carmen E (2019). Flood resilience: A systematic review. Journal of Environmental Planning and Management, 63, 1151–1176. https://doi.org/10.1080/09640568.2019.1641474

[18] Ndimele PE, Ojewole A, Mekuleyi G, Badmos L, Agosu CM, Olatunbosun ES, Lawal O, Shittu J, Joseph O, Ositimehin KM, Ndimele FC, Ojewole C, Abdulganiy IO, Ayodele OT (2024). Vulnerability, resilience and adaptation of Lagos coastal communities to flooding. Earth Science, Systems and Society. https://doi.org/10.3389/esss.2024.10087

[19] Oke AE, Aghimien D, Ojo LD (2019). Critical drivers of value management adoption in the Nigerian construction industry. Journal of Engineering, Design and Technology. https://doi.org/10.1108/JEDT-09-2018-0143

[20] Rözer V, Mehryar S, Surminski S (2022). From managing risk to increasing resilience: A review on the development of urban flood resilience, its assessment and the implications for decision making. Environmental Research Letters, 17. https://doi.org/10.1088/1748-9326/aca8bc

[21] Rostiyanti SF, Nindartin A, Kim J-H (2024). Critical success factors framework of value management for design and build infrastructure projects. Journal of Design and Built Environment, 23(1). https://doi.org/10.22452/jdbe.vol23no1.2

[22] Wang L, Cui S-H, Li Y-Z, Huang H, Manandhar B, Nitivattananon V, Fang X, Huang W (2022). A review of the flood management: From flood control to flood resilience. Heliyon, 8. https://doi.org/10.1016/j.heliyon.2022.e11763

How to cite this paper

Oluwasegun O. Ogungbenle, Akinwale O. Coker "Extent of Value Management Practice and Integration of Flood Resilience Considerations in Building Projects in Coastal Lagos, Nigeria" Iconic Research And Engineering Journals Volume 10 Issue 5 2026 Page 2762-2774 https://doi.org/10.64388/ire1725129
Oluwasegun O. Ogungbenle, Akinwale O. Coker "Extent of Value Management Practice and Integration of Flood Resilience Considerations in Building Projects in Coastal Lagos, Nigeria" Iconic Research And Engineering Journals, vol. 10, no. 5, Nov. 2026, doi: https://doi.org/10.64388/ire1725129
Oluwasegun O. Ogungbenle, Akinwale O. Coker (2026). Extent of Value Management Practice and Integration of Flood Resilience Considerations in Building Projects in Coastal Lagos, Nigeria. Iconic Research And Engineering Journals, 10(5). doi: https://doi.org/10.64388/ire1725129
Oluwasegun O. Ogungbenle, Akinwale O. Coker "Extent of Value Management Practice and Integration of Flood Resilience Considerations in Building Projects in Coastal Lagos, Nigeria" Iconic Research And Engineering Journals, vol. 10, no. 5, Nov. 2026. Crossref, https://doi.org/10.64388/ire1725129
@article{1725129,
      author = {Oluwasegun O. Ogungbenle, Akinwale O. Coker},
      title = {Extent of Value Management Practice and Integration of Flood Resilience Considerations in Building Projects in Coastal Lagos, Nigeria},
      journal = {Iconic Research And Engineering Journals},
      year = {2026},
      volume = {10},
      number = {5},
      pages = {2762-2774},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1725129.pdf},
      abstract = {Managing the challenge of flooding is an important aspect to consider when developing buildings in coastal areas of Lagos. Value Management can be used to provide structure when considering the functions associated with a project. It also considers the different options available to achieve value through efficient use of resources. There are concerns regarding how much flood resilience is being considered during Value Management activities on building projects in coastal Lagos. This study looked at how Value Management is currently being practiced and how much flood resilience is being considered in relation to Value Management activities on buildings projects in Lagos, Nigeria. A convergent mixed-methods approach was used during the research phase. Data was gathered by completing a structured questionnaire targeting built environment professionals and other relevant project stakeholders. A total of 325 valid responses were received out of a total of 348 questionnaires (93.4%). 20 experienced practitioners were also interviewed. Statistical analysis was completed by calculating the mean score and standard deviation of quantitative responses. Qualitative responses were analysed using thematic analysis. Results showed that there is a moderate amount of Value Management activities being implemented (overall mean score 2.88). Systematic consideration of alternative solutions in design and construction had the highest mean score (3.29). Functional analysis had the next highest mean score (3.21). Incorporating flood risk and resilience requirements was ranked lower with a mean score of 2.49. Considering the life cycle performance of flood resilience had a mean score of 2.51. Findings show that whilst traditional Value Management activities are being practised to a moderate extent, flood resilience is not being considered to a great extent. It should be explicitly considered during Value Management activities throughout the planning, design evaluation and life cycle stages.},
      keywords = {Value Management, flood resilience, building projects, lifecycle performance, coastal Lagos, construction industry},
      month = {November},
      doi = {https://doi.org/10.64388/ire1725129}
  }