Effectiveness of Performance Measurement Metrics in the Nigerian Construction Industry Evidence from Construction Professionals in Lagos State, Nigeria
Subject area: Science,Engineering and Technology · Area of research: Project Performance
Abstract
Performance measurement supports the monitoring of construction projects, but commonly used indicators may not capture the full range of project outcomes. This study assessed the performance measurement metrics used in construction projects in Lagos State, their perceived effectiveness, implementation challenges and possible improvements. A descriptive survey was conducted using questionnaire responses from 300 construction professionals selected through purposive sampling. Data were summarized using frequencies, percentages, means and Relative Importance Index values. Budget variance was the most frequently used metric (mean = 3.65; RII = 0.91), followed by quality evaluation (3.45; 0.86), client satisfaction (3.44) and schedule performance (3.42; 0.86). Respondents generally considered current measures useful for assessing project success, safety compliance, early issue identification, budget and quality. The leading reported limitation was that existing systems did not cover all aspects of project performance (3.46; 0.87), followed by implementation cost (3.36; 0.84) and insufficient staff training (3.34; 0.84). Respondents supported context-specific measures, more detailed criteria, sustainability indicators, regular training and digital real-time monitoring. The findings suggest that conventional cost, time and quality measures remain important, but need to be used alongside safety, sustainability, stakeholder satisfaction, productivity and risk indicators. The results reflect the views of the sampled Lagos professionals and should not be treated as nationally representative.
Keywords
construction projects, Lagos State, Nigeria, performance measurement, performance metrics
References
[1] Aibinu AA, Jagboro GO (2002). The effects of construction delays on project delivery in the Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5
[2] Chan APC, Chan APL (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2), 203–221.
[3] Haponava T, Al-Jibouri SHS (2012). Proposed system for measuring project performance using process-based key performance indicators. Journal of Management in Engineering, 28(2), 140–149.
[4] Ibironke OT, Oladinrin TO, Adeniyi O, Eboreime IV (2013). Analysis of non-excusable delay factors influencing contractors’ performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), 53–72.
[5] Mansfield NR, Ugwu OO, Doran T (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90050-7
[6] Tunji-Olayeni PF, Mosaku TO, Fagbenle OI, Omuh IO, Joshua O (2016). Evaluating construction project performance: A case of construction SMEs in Lagos, Nigeria. Journal of International Business and Economics, 16.
[7] Unegbu HCO, Yawas DS, Dan-asabe B (2022). An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria. Journal of King Saud University – Engineering Sciences, 34(4), 240–249. https://doi.org/10.1016/j.jksues.2020.10.001
[8] Yang H, Yeung JFY, Chan APC, Chiang YH, Chan DWM (2010). A critical review of performance measurement in construction. Journal of Facilities Management, 8(4), 269–284.
How to cite this paper
@article{1725421,
author = {Abiodun Ayodeji Odelade, Audu Afeez Olasunkanmi},
title = {Effectiveness of Performance Measurement Metrics in the Nigerian Construction Industry Evidence from Construction Professionals in Lagos State, Nigeria},
journal = {Iconic Research And Engineering Journals},
year = {2026},
volume = {10},
number = {5},
pages = {4083-4086},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1725421.pdf},
abstract = {Performance measurement supports the monitoring of construction projects, but commonly used indicators may not capture the full range of project outcomes. This study assessed the performance measurement metrics used in construction projects in Lagos State, their perceived effectiveness, implementation challenges and possible improvements. A descriptive survey was conducted using questionnaire responses from 300 construction professionals selected through purposive sampling. Data were summarized using frequencies, percentages, means and Relative Importance Index values. Budget variance was the most frequently used metric (mean = 3.65; RII = 0.91), followed by quality evaluation (3.45; 0.86), client satisfaction (3.44) and schedule performance (3.42; 0.86). Respondents generally considered current measures useful for assessing project success, safety compliance, early issue identification, budget and quality. The leading reported limitation was that existing systems did not cover all aspects of project performance (3.46; 0.87), followed by implementation cost (3.36; 0.84) and insufficient staff training (3.34; 0.84). Respondents supported context-specific measures, more detailed criteria, sustainability indicators, regular training and digital real-time monitoring. The findings suggest that conventional cost, time and quality measures remain important, but need to be used alongside safety, sustainability, stakeholder satisfaction, productivity and risk indicators. The results reflect the views of the sampled Lagos professionals and should not be treated as nationally representative.},
keywords = {construction projects, Lagos State, Nigeria, performance measurement, performance metrics},
month = {November},
}