Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230

Prince Keshi

Subject area: Science,Engineering and Technology  ·  Area of research: Environmental Engineering

DOI: 10.64388/ire1725588

Abstract

Treatment projects often support a completion date with procurement milestones, although delivery depends on when treatment capacity is ready and how much it can process and have accepted before the deadline. This embedded documentary case study examines that scheduling problem in Egypt’s Sustainable Persistent Organic Pollutants Management Project (P116230), which carried separate 1,000-tonne targets for obsolete-pesticide disposal and for treatment of oil contaminated with polychlorinated biphenyls (PCBs). Appraisal, restructuring, supervision, procurement and completion records publicly available by 31 August 2022 were coded by milestone, treatment stage and evidence type. The completion report reported 1,082 tonnes of pesticides disposed of and a total of 417.6 tonnes of oil treated; whether that oil had been treated and accepted by grant close on 31 December 2021 cannot be established from the public record. On the completion-report figures, pooled attainment was 74.98% and target-capped attainment 70.88%, leaving a gross outstanding balance of 582.4 tonnes, all in oil. In July 2021 the supervision report showed no oil treated, expected equipment delivery in September and retained a November completion forecast. Treating September delivery as an optimistic proxy for readiness, completing the oil target by 30 November required 11.11–16.39 tonnes per calendar day; the record reports no sustained operating rate against which to test that requirement. The case shows how a workstream target balance combined with a dated required-rate check raises capacity questions that pooled totals and procurement status leave open. The resulting controls are proposals for monitoring relevant to Sustainable Development Goal (SDG) target 12.4, not tested interventions.

Keywords

documentary case study, hazardous waste, polychlorinated biphenyls, project controls, schedule forecasting, SDG 12.4

References

[1] Ballard, G., and Howell, G. (1998). Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), 11–17. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11).

[2] Baxter, P., and Jack, S. (2008). Qualitative case study methodology: Study design and implementation for novice researchers. The Qualitative Report, 13(4), 544–559. https://nsuworks.nova.edu/tqr/vol13/iss4/2/.

[3] Bowen, G. A. (2009). Document analysis as a qualitative research method. Qualitative Research Journal, 9(2), 27–40. https://doi.org/10.3316/QRJ0902027.

[4] Buehler, R., Griffin, D., and Ross, M. (1994). Exploring the “planning fallacy”: Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381. https://doi.org/10.1037/0022-3514.67.3.366.

[5] Campbell, D. T. (1979). Assessing the impact of planned social change. Evaluation and Program Planning, 2(1), 67–90. https://doi.org/10.1016/0149-7189(79)90048-X.

[6] Denizer, C., Kaufmann, D., and Kraay, A. (2013). Good countries or good projects? Macro and micro correlates of World Bank project performance. Journal of Development Economics, 105, 288–302. https://doi.org/10.1016/j.jdeveco.2013.06.003.

[7] ElSheikh, R. (2019; disclosed 2021). Environmental and Social Impact Assessment Study for North Upper Egypt Storage Sites of Obsolete Pesticides. World Bank. https://documents1.worldbank.org/curated/en/714991613117896949/pdf/Environmental-and-Social-Impact-Assessment-Study-for-North-Upper-Egypt-Obsolete-Pesticide-Disposal.pdf.

[8] FAO (Food and Agriculture Organization of the United Nations). (2001). Baseline Study on the Problem of Obsolete Pesticide Stocks. FAO Pesticide Disposal Series No. 9. Rome: FAO. https://www.fao.org/3/X8639E/X8639E00.htm.

[9] Flyvbjerg, B. (2006). Five misunderstandings about case-study research. Qualitative Inquiry, 12(2), 219–245. https://doi.org/10.1177/1077800405284363.

[10] Gale, N. K., Heath, G., Cameron, E., Rashid, S., and Redwood, S. (2013). Using the framework method for the analysis of qualitative data in multi-disciplinary health research. BMC Medical Research Methodology, 13, 117. https://doi.org/10.1186/1471-2288-13-117.

[11] GAO (U.S. Government Accountability Office). (2015). Schedule Assessment Guide: Best Practices for Project Schedules. GAO-16-89G. https://www.gao.gov/products/gao-16-89g.

[12] Ika, L. A. (2012). Project management for development in Africa: Why projects are failing and what can be done about it. Project Management Journal, 43(4), 27–41. https://doi.org/10.1002/pmj.21281.

[13] Independent Evaluation Group. (2016). Africa Stockpiles Program: Project Performance Assessment Report. Report No. 108524. World Bank. https://ieg.worldbankgroup.org/sites/default/files/Data/reports/ppar_africa_102416_2.pdf.

[14] Lauras, M., Marques, G., and Gourc, D. (2010). Towards a multi-dimensional project performance measurement system. Decision Support Systems, 48(2), 342–353. https://doi.org/10.1016/j.dss.2009.09.002.

[15] Lu, M., and Lam, H.-C. (2008). Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), 25–31. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(25).

[16] Munda, G., and Nardo, M. (2009). Noncompensatory/nonlinear composite indicators for ranking countries: A defensible setting. Applied Economics, 41(12), 1513–1523. https://doi.org/10.1080/00036840601019364.

[17] OECD and European Commission, Joint Research Centre. (2008). Handbook on Constructing Composite Indicators: Methodology and User Guide. Paris: OECD Publishing. https://doi.org/10.1787/9789264043466-en.

[18] Scott, J. (1990). A Matter of Record: Documentary Sources in Social Research. Cambridge: Polity Press.

[19] Seawright, J., and Gerring, J. (2008). Case selection techniques in case study research: A menu of qualitative and quantitative options. Political Research Quarterly, 61(2), 294–308. https://doi.org/10.1177/1065912907313077.

[20] Stockholm Convention on Persistent Organic Pollutants. (2001). Adopted 22 May 2001; entered into force 17 May 2004. Annex A, Part II (polychlorinated biphenyls). Geneva: Secretariat of the Stockholm Convention.

[21] United Nations Environment Programme. (2016). Consolidated Assessment of Efforts Made Toward the Elimination of Polychlorinated Biphenyls. Geneva: UNEP Chemicals and Health Branch. https://wedocs.unep.org/20.500.11822/31249.

[22] United Nations General Assembly. (2015). Transforming Our World: The 2030 Agenda for Sustainable Development. A/RES/70/1. https://documents.un.org/doc/undoc/gen/n15/291/89/doc/n1529189.docx.

[23] United Nations General Assembly. (2017). Work of the Statistical Commission Pertaining to the 2030 Agenda for Sustainable Development. A/RES/71/313. https://mandates.un.org/mandate/A/RES/71/313?subject=Statistics.

[24] Vanhoucke, M., and Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), 1361–1374. https://doi.org/10.1057/palgrave.jors.2602296.

[25] Williams, T., and Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49. https://doi.org/10.1002/pmj.20160.

[26] World Bank. (2014). Project Appraisal Document: Egypt Sustainable Persistent Organic Pollutants Management Project (P116230). Report No. PAD71, 23 May. https://documents1.worldbank.org/curated/en/653361468025440292/pdf/PAD710PAD0P116010Box385222B00OUO090.pdf.

[27] World Bank. (2017). Implementation Status and Results Report: Egypt Sustainable POPs Management Project (P116230). Sequence No. 7, 3 August. https://documents1.worldbank.org/curated/en/177011501788282971/pdf/ISR-Disclosable-P116230-08-03-2017-1501788275467.pdf.

[28] World Bank. (2018). Disclosable Restructuring Paper: Egypt Sustainable POPs Management Project (P116230). August. https://documents1.worldbank.org/curated/en/486721534297296773/pdf/Disclosable-Restructuring-Paper-Egypt-Sustainable-POPs-Management-Project-P116230.pdf.

[29] World Bank. (2019). Egypt: A Cleaner Environment Leads to Better Health for the Residents of El Saf City. Feature story, 5 December. https://www.worldbank.org/en/news/feature/2019/12/05/egypt-a-cleaner-environment-leads-to-better-health-for-the-residents-of-el-saf-city.

[30] World Bank. (2020). Implementation Status and Results Report: Egypt Sustainable POPs Management Project (P116230). Sequence No. 13, 21 December. https://documents1.worldbank.org/curated/en/986131608580937920/pdf/Disclosable-Version-of-the-ISR-Egypt-Sustainable-POPs-Management-Project-P116230-Sequence-No-13.pdf.

[31] World Bank. (2021a). Disclosable Restructuring Paper: Egypt Sustainable POPs Management Project (P116230). June. https://documents1.worldbank.org/curated/en/172461624637817120/pdf/Disclosable-Restructuring-Paper-Egypt-Sustainable-POPs-Management-Project-P116230.pdf.

[32] World Bank. (2021b). Implementation Status and Results Report: Egypt Sustainable POPs Management Project (P116230). Sequence No. 14, 19 July. https://documents1.worldbank.org/curated/en/322341626698292971/pdf/Disclosable-Version-of-the-ISR-Egypt-Sustainable-POPs-Management-Project-P116230-Sequence-No-14.pdf.

[33] World Bank. (2021c). Procurement Plan: Egypt Sustainable POPs Management Project (P116230). May 2021 revision. https://documents1.worldbank.org/curated/en/165221623966631063/pdf/Egypt-Arab-Republic-of-MIDDLE-EAST-AND-NORTH-AFRICA-P116230-Egypt-Sustainable-POPs-Management-Project-Procurement-Plan.pdf.

[34] World Bank. (2021d). Procurement Plan: Egypt Sustainable POPs Management Project (P116230). STEP58842, disclosed 29 December. https://documents1.worldbank.org/curated/en/099855012292147032/pdf/Egypt0Arab0Rep000Procurement0Plan01.pdf.

[35] World Bank. (2022). Implementation Completion and Results Report: Egypt Sustainable POPs Management Project (P116230). Report No. ICR00005467, 28 June. https://documents1.worldbank.org/curated/en/099920007082211960/pdf/BOSIB0752788420de0823a03fa5b9b9b9e5.pdf.

[36] Yin, R. K. (2018). Case Study Research and Applications: Design and Methods (6th ed.). Thousand Oaks, CA: SAGE.

How to cite this paper

Prince Keshi "Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230" Iconic Research And Engineering Journals Volume 6 Issue 6 2022 Page 503-516 https://doi.org/10.64388/ire1725588
Prince Keshi "Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230" Iconic Research And Engineering Journals, vol. 6, no. 6, Dec. 2022, doi: https://doi.org/10.64388/ire1725588
Prince Keshi (2022). Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230. Iconic Research And Engineering Journals, 6(6). doi: https://doi.org/10.64388/ire1725588
Prince Keshi "Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230" Iconic Research And Engineering Journals, vol. 6, no. 6, Dec. 2022. Crossref, https://doi.org/10.64388/ire1725588
@article{1725588,
      author = {Prince Keshi},
      title = {Workstream Targets and Schedule Risk in Hazardous-Waste Treatment: A Documentary Case Study of Egypt’s P116230},
      journal = {Iconic Research And Engineering Journals},
      year = {2022},
      volume = {6},
      number = {6},
      pages = {503-516},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1725588.pdf},
      abstract = {Treatment projects often support a completion date with procurement milestones, although delivery depends on when treatment capacity is ready and how much it can process and have accepted before the deadline. This embedded documentary case study examines that scheduling problem in Egypt’s Sustainable Persistent Organic Pollutants Management Project (P116230), which carried separate 1,000-tonne targets for obsolete-pesticide disposal and for treatment of oil contaminated with polychlorinated biphenyls (PCBs). Appraisal, restructuring, supervision, procurement and completion records publicly available by 31 August 2022 were coded by milestone, treatment stage and evidence type. The completion report reported 1,082 tonnes of pesticides disposed of and a total of 417.6 tonnes of oil treated; whether that oil had been treated and accepted by grant close on 31 December 2021 cannot be established from the public record. On the completion-report figures, pooled attainment was 74.98% and target-capped attainment 70.88%, leaving a gross outstanding balance of 582.4 tonnes, all in oil. In July 2021 the supervision report showed no oil treated, expected equipment delivery in September and retained a November completion forecast. Treating September delivery as an optimistic proxy for readiness, completing the oil target by 30 November required 11.11–16.39 tonnes per calendar day; the record reports no sustained operating rate against which to test that requirement. The case shows how a workstream target balance combined with a dated required-rate check raises capacity questions that pooled totals and procurement status leave open. The resulting controls are proposals for monitoring relevant to Sustainable Development Goal (SDG) target 12.4, not tested interventions.},
      keywords = {documentary case study, hazardous waste, polychlorinated biphenyls, project controls, schedule forecasting, SDG 12.4},
      month = {December},
      doi = {https://doi.org/10.64388/ire1725588}
  }