Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction

Aliyu S. Murtala M. S. Precious P. S. Samaila M. Yahaya U. F.

Subject area: Science,Engineering and Technology  ·  Area of research: Procurement Management

Abstract

A risk analysis reveals what exposures exist and how they should be addressed. Procurement law sets the range of responses that is possible. The purpose of this paper is to determine where the exposure ends up in case of conflict between these two. This study combines the document analysis of Nigeria's Public Procurement Act 2007 with the structured content analysis of nineteen papers on procurement regulation and developing economy contexts discovered through the specified search strategy and selected based on the set criteria. All procurement methods prescribed in the Act are compared regarding their appropriateness in satisfying the four exposure types detected in risk analysis. Open competitive bidding, which is the default procedure of the Act according to section 24, is unfitting to address all four of them. Those which perform better belong to Part VII of the Act and are conditional upon specific justification that the procuring organization might not have. Thus, the exposure is displaced onto two methods that are allowed within any of the routes: the stringency of the prequalification process of the bidder, and the contract instruments which are attached to the award of the contract. The Nigerian articles of evidence address sustainable procurement and the risk of bid evaluation in the projects of public tertiary institutions. However, neither their titles nor abstracts offer any assessment of the stringency of prequalification and the contract terms. Thus, it is unknown whether these two methods can accommodate the exposure. One legislative improvement proposal is offered: allowing for a documented risk analysis to justify the restricted or direct procurement route, provided that it is independently verified.

Keywords

contractual instruments; prequalification; public procurement regulation; risk allocation; statutory default

References

[1] Federal Republic of Nigeria. Public Procurement Act 2007 (Act No. 14). Abuja: Federal Government Press; 2007.

[2] Emenike N, Ozurumba BA, Ubani CE, Ubah CP. Impact of the Nigerian 2007 Public Procurement Act on organizations: enhancing transparency and accountability. International Journal of Research and Innovation in Social Science. 2025;9(1). https://doi.org/10.47772/IJRISS.2025.9010056

[3] Oladiran OJ, Oche MO. Public Procurement Act and project time outcomes in Nigeria. Covenant Journal of Engineering Technology. 2024;8(2).

[4] Page MJ, McKenzie JE, Bossuyt PM, Boutron I, Hoffmann TC, Mulrow CD, et al. The PRISMA 2020 statement: an updated guideline for reporting systematic reviews. BMJ. 2021;372. https://doi.org/10.1136/bmj.n71

[5] Trautrims A, Gold S, Touboulic A, Emberson C, Carter H. The UK construction and facilities management sector's response to the Modern Slavery Act. Business Strategy and Development. 2020;4(3):279–293. https://doi.org/10.1002/bsd2.158

[6] Shapiro D. Doing business in Nigeria. Journal of Corporate Accounting and Finance. 2014;25(6):3–6. https://doi.org/10.1002/jcaf.21981

[7] Dixit V. Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management. 2020;22(8):1537–1549. https://doi.org/10.1080/15623599.2020.1728610

[8] Tembo Silungwe CK, Khatleli N. An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management. 2018;20(4):321–334. https://doi.org/10.1080/15623599.2018.1484853

[9] Osipova E, Eriksson PE. How procurement options influence risk management in construction projects. Construction Management and Economics. 2011;29(11):1149–1158. https://doi.org/10.1080/01446193.2011.639379

[10] Odunjo O, Adeoye DO, Oloyede MA, Akewusola R. Procurement strategies, risk management and project performance in public building projects. Journal of Applied Sciences and Environmental Management. 2026;30(5). https://doi.org/10.4314/jasem.v30i5.13

[11] Odunjo OO, Adeoye DO, Oloyede MA, Akewusola R. Towards sustainable and risk-resilient procurement in public building projects. FUDMA Journal of Sciences. 2026;10(6). https://doi.org/10.33003/fjs-2026-1006-4857

[12] Oyewobi L, Jimoh R. Barriers to adoption of sustainable procurement in the Nigerian public construction sector. Sustainability. 2022;14(22). https://doi.org/10.3390/su142214832

[13] Ogunsanya O, Aigbavboa C, Thwala D, Edwards D. Barriers to sustainable procurement in the Nigerian construction industry: an exploratory factor analysis. International Journal of Construction Management. 2019. https://doi.org/10.1080/15623599.2019.1658697

[14] Ogunsanya O, Aigbavboa C, Thwala D. Sustainable procurement model for publicly funded construction projects in developing nations. International Journal of Construction Management. 2021. https://doi.org/10.1080/15623599.2021.1889087

[15] Suleiman S, Saidu I, Adamu A, Tsado AJ. Management of bid evaluation risks in procurement of construction projects of public tertiary institutions. Environmental Technology and Science Journal. 2024;15(1). https://doi.org/10.4314/etsj.v15i1.15

[16] Mwaiseje S, Panga F, Mchopa A, Mathias SN. Procurement contract risks management and the performance of force account construction projects. SAM Advanced Management Journal. 2024. https://doi.org/10.1108/samamj-07-2024-0036

[17] Alsamarraie MM, Ghazali F. Evaluation of organizational procurement performance for public construction projects. International Journal of Construction Management. 2022. https://doi.org/10.1080/15623599.2022.2070447

[18] Siemińska E. Risks of investment projects implemented under public procurement in Poland. World of Real Estate Journal. 2025. https://doi.org/10.15678/worej.2450-534x.18953

[19] Musosha C, Kelvin C. Risk management in procurement options in project management. International Journal of Humanities and Education Research. 2025;7(1). https://doi.org/10.33545/26649799.2025.v7.i1b.147

[20] Rehman MA, Bin Isha MS. Moderation role of government acts, laws and policies between economic factors and risk management. Journal of Project Management. 2023. https://doi.org/10.5267/j.jpm.2023.8.001

[21] Boadu E, Sunindijo R, Wang C. Health and safety consideration in the procurement of public construction projects. Buildings. 2021;11(3). https://doi.org/10.3390/buildings11030128

[22] Boadu E, Sunindijo R, Wang C, Frimpong S. Health and safety integration into the procurement stages of public construction projects. Construction Economics and Building. 2022;22(3). https://doi.org/10.5130/ajceb.v22i3.8136

[23] Loosemore M, Keast R, Barraket J, Denny-Smith G. The risks and opportunities of social procurement in construction projects. International Journal of Managing Projects in Business. 2022. https://doi.org/10.1108/ijmpb-11-2021-0300

[24] Lenderink B, Halman J, Boes J, Voordijk H. Procurement and innovation risk management: how a public client managed to realise innovation. Journal of Purchasing and Supply Management. 2022. https://doi.org/10.1016/j.pursup.2022.100747

[25] Ogunmakinde O, Aghajani M, Memari A. Identifying risks in sustainable procurement for construction: a systematic literature review. Smart and Sustainable Built Environment. 2025. https://doi.org/10.1108/sasbe-12-2024-0543

[26] Mazher K, Chan A, Choudhry R, Zahoor H. Identifying measures of effective risk management for public-private partnership infrastructure projects in developing countries. Sustainability. 2022;14(21). https://doi.org/10.3390/su142114149

[27] Almeile AM, Chipulu M, Ojiako U, Vahidi R. Project-focussed literature on public-private partnership in developing countries. Production Planning and Control. 2022. https://doi.org/10.1080/09537287.2022.2123408

[28] Eshun BT, Chan A. An evaluation of project risk dynamics in Sino-Africa public infrastructure delivery. Sustainability. 2021;13(19). https://doi.org/10.3390/su131910822

[29] Niu B, Zheng Z, Wang L. Information value versus flexibility cost: comparison of dual sourcing and artificial intelligence sourcing for resilient supply. Risk Analysis. 2025;45(8):2197–2231. https://doi.org/10.1111/risa.70005

How to cite this paper

Aliyu S., Murtala M. S., Precious P. S., Samaila M., Yahaya U. F. "Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction" Iconic Research And Engineering Journals Volume 10 Issue 4 2026 Page 1332-1341
Aliyu S., Murtala M. S., Precious P. S., Samaila M., Yahaya U. F. "Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction" Iconic Research And Engineering Journals, vol. 10, no. 4, Oct. 2026
Aliyu S., Murtala M. S., Precious P. S., Samaila M., Yahaya U. F. (2026). Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction. Iconic Research And Engineering Journals, 10(4).
Aliyu S., Murtala M. S., Precious P. S., Samaila M., Yahaya U. F. "Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction" Iconic Research And Engineering Journals, vol. 10, no. 4, Oct. 2026.
@article{1723810,
      author = {Aliyu S., Murtala M. S., Precious P. S., Samaila M., Yahaya U. F.},
      title = {Where the Exposure Goes: How a Statutory Procurement Default Relocates Risk in Nigerian Public Construction},
      journal = {Iconic Research And Engineering Journals},
      year = {2026},
      volume = {10},
      number = {4},
      pages = {1332-1341},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1723810.pdf},
      abstract = {A risk analysis reveals what exposures exist and how they should be addressed. Procurement law sets the range of responses that is possible. The purpose of this paper is to determine where the exposure ends up in case of conflict between these two. This study combines the document analysis of Nigeria's Public Procurement Act 2007 with the structured content analysis of nineteen papers on procurement regulation and developing economy contexts discovered through the specified search strategy and selected based on the set criteria. All procurement methods prescribed in the Act are compared regarding their appropriateness in satisfying the four exposure types detected in risk analysis. Open competitive bidding, which is the default procedure of the Act according to section 24, is unfitting to address all four of them. Those which perform better belong to Part VII of the Act and are conditional upon specific justification that the procuring organization might not have. Thus, the exposure is displaced onto two methods that are allowed within any of the routes: the stringency of the prequalification process of the bidder, and the contract instruments which are attached to the award of the contract. The Nigerian articles of evidence address sustainable procurement and the risk of bid evaluation in the projects of public tertiary institutions. However, neither their titles nor abstracts offer any assessment of the stringency of prequalification and the contract terms. Thus, it is unknown whether these two methods can accommodate the exposure. One legislative improvement proposal is offered: allowing for a documented risk analysis to justify the restricted or direct procurement route, provided that it is independently verified.},
      keywords = {contractual instruments; prequalification; public procurement regulation; risk allocation; statutory default},
      month = {October},
  }