Assessing Key Uncertainties in the Development Plan of "Success" Field

Bayonle Abiola Omoniyi

Subject area: Science,Engineering and Technology  ·  Area of research: Reservoir Development and Production

Abstract

Data derived from several appraisal wells has shown the ?Success? field to be a viable development project. The field is highly faulted with a southern sealing boundary fault. Based on uncertainties that relate to trap mechanism, production rate, net-to-gross distribution, permeability heterogeneity, and size and efficiency of aquifer to provide natural drive, a three-phase production profile is designed to target four hydrocarbon-bearing sand bodies. Proposed development plan involves a depletion strategy comprising 8 water injection wells and 19 oil production wells. Prior to start-up production, flow should be simulated to monitor reservoir performance under primary and secondary recovery mechanisms. The impact of water and subsequently gas production should also be assessed to inform injection strategy for maximum oil recovery.

Keywords

net-to-gross, permeability heterogeneity, trap, simulation.

How to cite this paper

Bayonle Abiola Omoniyi "Assessing Key Uncertainties in the Development Plan of "Success" Field" Iconic Research And Engineering Journals Volume 5 Issue 3 2021 Page 108-112
Bayonle Abiola Omoniyi "Assessing Key Uncertainties in the Development Plan of "Success" Field" Iconic Research And Engineering Journals, vol. 5, no. 3, Sep. 2021
Bayonle Abiola Omoniyi (2021). Assessing Key Uncertainties in the Development Plan of "Success" Field. Iconic Research And Engineering Journals, 5(3).
Bayonle Abiola Omoniyi "Assessing Key Uncertainties in the Development Plan of "Success" Field" Iconic Research And Engineering Journals, vol. 5, no. 3, Sep. 2021.
@article{1702932,
      author = {Bayonle Abiola Omoniyi},
      title = {Assessing Key Uncertainties in the Development Plan of "Success" Field},
      journal = {Iconic Research And Engineering Journals},
      year = {2021},
      volume = {5},
      number = {3},
      pages = {108-112},
      issn = {2456-8880},
      url = {https://www.irejournals.com/formatedpaper/1702932.pdf},
      abstract = {Data derived from several appraisal wells has shown the ?Success? field to be a viable development project. The field is highly faulted with a southern sealing boundary fault. 
Based on uncertainties that relate to trap mechanism, production rate, net-to-gross distribution, permeability heterogeneity, and size and efficiency of aquifer to provide natural drive, a three-phase production profile is designed to target four hydrocarbon-bearing sand bodies. Proposed development plan involves a depletion strategy comprising 8 water injection wells and 19 oil production wells. Prior to start-up production, flow should be simulated to monitor reservoir performance under primary and secondary recovery mechanisms. The impact of water and subsequently gas production should also be assessed to inform injection strategy for maximum oil recovery.},
      keywords = {net-to-gross, permeability heterogeneity, trap, simulation.},
      month = {September},
  }