Operational Variables Determining Project Implementation Delays
  • Author(s): Gesiver Costales Manaois ; Rogelio D. Mercado, DPA
  • Paper ID: 1704786
  • Page: 1086-1098
  • Published Date: 29-06-2023
  • Published In: Iconic Research And Engineering Journals
  • Publisher: IRE Journals
  • e-ISSN: 2456-8880
  • Volume/Issue: Volume 6 Issue 12 June-2023
Abstract

The NIA-PIMO pledges to expedite irrigation infrastructure project implementation. The goal of this study was to pinpoint the operational elements contributing to project implementation delays for NIA-PIMO. 67 respondents, comprising NIA employees and contractors/project engineers, participated in the researcher's descriptive investigation. The findings showed that NIA staff, contractors, and project engineers statistically concurred that equipment-related variables, construction method-related factors, external factors, and labor-related factors contribute to project implementation delays. The level of agreement on the issues causing delays is perceived significantly differently by NIA employees and contractors. When classified by duration of service, greatest level of education attained, and rank, there are also notable disparities in the Level of Agreement on the factors driving project execution delays.

Keywords

Implementation, Irrigation, Factors Delays, Project

Citations

IRE Journals:
Gesiver Costales Manaois , Rogelio D. Mercado, DPA "Operational Variables Determining Project Implementation Delays" Iconic Research And Engineering Journals Volume 6 Issue 12 2023 Page 1086-1098

IEEE:
Gesiver Costales Manaois , Rogelio D. Mercado, DPA "Operational Variables Determining Project Implementation Delays" Iconic Research And Engineering Journals, 6(12)