Operational Variables Determining Project Implementation Delays
Subject area: Arts, Social Sciences and Humanities · Area of research: Children Development
Abstract
The NIA-PIMO pledges to expedite irrigation infrastructure project implementation. The goal of this study was to pinpoint the operational elements contributing to project implementation delays for NIA-PIMO. 67 respondents, comprising NIA employees and contractors/project engineers, participated in the researcher's descriptive investigation. The findings showed that NIA staff, contractors, and project engineers statistically concurred that equipment-related variables, construction method-related factors, external factors, and labor-related factors contribute to project implementation delays. The level of agreement on the issues causing delays is perceived significantly differently by NIA employees and contractors. When classified by duration of service, greatest level of education attained, and rank, there are also notable disparities in the Level of Agreement on the factors driving project execution delays.
Keywords
Implementation, Irrigation, Factors Delays, Project
References
[1] Abdellatif, H., & Alshibani, A. (2019). Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings, 9(4), 93. https://
[2] Acharya, P., Boggess, B., & Zhang, K. (2018). Assessing Heat Stress and Health among Construction Workers in a Changing Climate: A Review. International Journal of Environmental Research and Public Health, 15(2), 247. https://
[3] Alaghbari, W., Al-Sakkaf, A., & Sultan, B. (2017). Factors affecting construction labour productivity in Yemen. The International Journal of Construction Management, 19(1), 79–91. https://
[4] Budhathoki, N. K., & Zander, K. K. (2019). Socio-Economic Impact of and Adaptation to V. LEVEL OF AGREEMENT ON CAUSES OF DELAYS The researcher would like to determine the level of your agreement to the following statements causing delays in the construction projects. How much do you agree with the following? To quantify your answers, please refer to the description below. Scale Descriptive Rating Interpretation 1 Strongly Agree The factor extremely affecting delays in project implementation. 2 Agree The factor certainly affects delays in project implementation. 3 Disagree The factor affecting very minimal delays in project implementation. 4 Strongly Disagree The factor does not at all affect delays in project implementation. FACTORS Level of Agreement SA A D SD Construction Methodology Poor site management and supervision Lack of experience Improper construction methods Poor monitoring and control Underestimation of time for completion of projects Underestimation of the complexity of the project Ineffective project planning, scheduling, or resource management Labor Fatigue Poor productivity of labor Lack of skilled professional Fluctuating labor availability from season to season Absenteeism Accidents on site Motivation and morale of labor Equipment Equipment shortage Low productivity of equipment Lack of high-technology mechanical equipment Shortage of equipment parts Equipment failure Wrong selection of equipment Slow equipment delivery External factors Weather conditions Regulatory changes Unforeseen condition Culture impacts Natural disasters Community disagreement Politics VI. PRIVACY AND CONTENT STATEMENT Given Data Privacy Law, I agree to my details used for research and scholarly purposes. The information will only be accessed by necessary personnel. I understand my data will be held securely and will not be distributed to third parties. I have a right to charge or file legal cases in case of data mistreatment. I understand that when this information is no longer required for this purpose, official university procedures will be followed to dispose of my data. __________________________ Signature over Printed Name Extreme Heat and Cold of Farmers in the Food Bowl of Nepal. International Journal of Environmental Research and Public Health, 16(9), 1578. https://
[5] Chinn, S. (2020, April 6). Construction Project Planning & Scheduling | eSUB Guide. ESub Construction Software. Accessed from https://esub.com/blog/construction-project- planning-and-scheduling-guide/
[6] Cooperative Development Authority. (n.d.). About Region 1. Accessed from https://cda.gov.ph/region-1/about/
[7] Durdyev, S., Hosseini, M. R., Martek, I., Ismail, S., & Arashpour, M. (2019). Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), 186–204. https://
[8] Eisenhardt, K. M. (1989). Agency theory: An assessment and review. Academy of management review, 14(1), 57 -74. https://
[9] Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), e06826. https://
[10] Ghani, N., Tariq, F., Javed, H., Nisar, N., & Tahir, A. (2019). Low-temperature health hazards among workers of cold storage facilities in Lahore, Pakistan. Medycyna pracy, 71(1), 1– 7. Retrieved from: https://
[11] Khlaifat, D. M., Alyagoub, R. E., Sweis, R. J., & Sweis, G. J. (2019). Factors leading to construction projects' failure in Jordon. International Journal of Construction Management, 19(1), 65 -78. https://
[12] Kim, S., Chang, S., & Castro-Lacouture, D. (2020). Dynamic modeling for analyzing impacts of skilled labor shortage on construction project management. Journal of Management in Engineering, 36(1), 04019035.
[13] Kopp, C. M. (2021). Agency Theory Definition. Investopedia. Accessed from https://www.investopedia.com/terms/a/agencyth eory.asp
[14] Mahaney, R.C. and Lederer, A.L. (2003), "Information systems project management: an agency theory interpretation", Journal of Systems and Software, Vol. 68 No. 1, pp. 1-9.
[15] National Irrigation Administration. (2018). Revised Process Map. Accessed from https://www.nia.gov.ph/content/revised-process- map
[16] Parker, D.W., Dressel, U., Chevers, D. and Zeppetella, L. (2018), Agency theory perspective on public-private-partnerships: international development project. International Journal of Productivity and Performance Management. https://
[17] Philippine Institute for Development Studies (2021). Revitalizing Philippine Irrigation: A Systems and Governance Assessment for the 21st Century. Accessed from https://pidswebs.pids.gov.ph/CDN/PUBLICATI ONS/pidsbk2021-irrigation_book.pdf
[18] Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. S. (2019). Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), 216-238. https://
[19] Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381. https://
[20] Ramli, M. Z., Malek, M. A., Hanipah, M. H., Lin, C. L., Mahamad Sukri, M. F., Zawawi, M. H., Zainal Abidin, M. Z., & Mohamad Fuad, N. F. S. (2018). Study of factors influencing construction delays in rural areas in Malaysia. Journal of Physics: Conference Series, 1049, 012017. https:// 6596/1049/1/012017
[21] Republic Act No. 8435, (December 22, 1997), An Act Prescribing Urgent Related Measures to Modernize the Agriculture and Fisheries Sectors of The Country in order to Enhance their Profitability, and Prepare Said Sectors for the Challenges of Globalization Through an Adequate, Focused and Rational Delivery of Necessary Support Services, Appropriating Funds Therefor and for Other Purposes. Access from https://www.officialgazette.gov.ph/1997/12/22/r epublic-act-no-8435-s-1997/
[22] Sepasgozar, S. M., Karimi, R., Shirowzhan, S., Mojtahedi, M., Ebrahimzadeh, S., & McCarthy, D. (2019). Delay causes and emerging digital tools: A novel model of delay analysis, including integrated project delivery and PMBOK. Buildings, 9(9), 191. https://
[23] Shahsavand, P., Marefat, A., & Parchamijalal, M. (2018). Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), 497-533. https:// 10-2016-02200
[24] Zidane, Y. J. T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11(3), 650-672. https://
How to cite this paper
@article{1704786,
author = {Gesiver Costales Manaois, Rogelio D. Mercado, DPA},
title = {Operational Variables Determining Project Implementation Delays},
journal = {Iconic Research And Engineering Journals},
year = {2023},
volume = {6},
number = {12},
pages = {1086-1098},
issn = {2456-8880},
url = {https://www.irejournals.com/formatedpaper/1704786.pdf},
abstract = {The NIA-PIMO pledges to expedite irrigation infrastructure project implementation. The goal of this study was to pinpoint the operational elements contributing to project implementation delays for NIA-PIMO. 67 respondents, comprising NIA employees and contractors/project engineers, participated in the researcher's descriptive investigation. The findings showed that NIA staff, contractors, and project engineers statistically concurred that equipment-related variables, construction method-related factors, external factors, and labor-related factors contribute to project implementation delays. The level of agreement on the issues causing delays is perceived significantly differently by NIA employees and contractors. When classified by duration of service, greatest level of education attained, and rank, there are also notable disparities in the Level of Agreement on the factors driving project execution delays.},
keywords = {Implementation, Irrigation, Factors Delays, Project},
month = {June},
}